ROADWORKS SUMMARY
Moyleen Rise, MARLOW, SL7 2DP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Moyleen Rise, SL7 2DP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Moyleen Rise, MARLOW, SL7 2DP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Moyleen Rise are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

Buckinghamshire Council logo

LONG TERM
Between
5 Jun 2023 and 6 May 2024
Details
View Map
Share
Bourne End Road

Buckinghamshire Council are proposing to carry out roadworks on Bourne End Road, Hedsor.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 5 June 2023 and could run through until 6 May 2024. The works will impact the verge only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Buckinghamshire Council on 17 May 2023 at 10:19.

Scottish Hydro Electric Power Dis logo

LONG TERM
Finishing
Monday
Details
View Map
Share
Colstrope Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Colstrope Lane, Colstrope.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2023 and could run through until 1 April 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Mar 2023 at 11:00.

LONG TERM
Until
31 May 2024
Details
View Map
Share
Sutton Road

Royal Borough Of Windsor And Maidenhead are carrying out Highway improvement works on Sutton Road, Cookham, Maidenhead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 08:56 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 18 Mar 2024 at 12:46.

Cadent Gas logo

LONG TERM
Until
13 Jun 2024
Details
View Map
Share
Micklefield Road

Cadent Gas are carrying out Utility asset works on Micklefield Road, Micklefield, High Wycombe.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 08:00 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Mar 2024 at 14:48.

Affinity Water logo

LONG TERM
Finishing
Wednesday
Details
View Map
Share
Gossmore Lane

Affinity Water are proposing to carry out Utility asset works on Gossmore Lane, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 3 April 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Affinity Water on 9 Nov 2023 at 14:31.

Cadent Gas logo

LONG TERM
Until
30 May 2024
Details
View Map
Share
Braywick Road Service Road

Cadent Gas are carrying out Utility asset works on Braywick Road Service Road, Maidenhead.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:51 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2024 at 09:15.

Scottish Hydro Electric Power Dis logo

Between
11 Mar and 5 Apr 2024
Details
View Map
Share
West Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on West Street, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Nov 2023 at 16:11.

Thames Water logo

Until
7 Apr 2024
Details
View Map
Share
Gossmore Lane

Thames Water are carrying out Utility asset works on Gossmore Lane, Marlow.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 06:30 and could run through until 7 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 10:57.

Cadent Gas logo

LONG TERM
Until
19 Apr 2024
Details
View Map
Share
Hambleden Walk

Cadent Gas are carrying out Utility asset works on Hambleden Walk, Maidenhead.

These works are categorised as Major.

The works started on 11 March 2024 at 08:00 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2024 at 11:42.

Scottish Hydro Electric Power Dis logo

Between
11 Mar and 5 Apr 2024
Details
View Map
Share
Totteridge Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Totteridge Road, Totteridge, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Nov 2023 at 08:42.

Buckinghamshire Council logo

LONG TERM
Between
14 Mar and 30 May 2024
Details
View Map
Share
Ferry Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Ferry Lane, Bourne End.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 4 Mar 2024 at 11:01.

Cadent Gas logo

Until
14 Apr 2024
Details
View Map
Share
Marlow Footpath 1b

Cadent Gas are carrying out Utility asset works on Marlow Footpath 1b, Marlow.

These works are categorised as Major.

The works started on 22 March 2024 at 07:51 and could run through until 14 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Mar 2024 at 08:01.

Buckinghamshire Council logo

Until
11 Apr 2024
Details
View Map
Share
Abbey Way

Buckinghamshire Council are carrying out Highway repair and maintenance works on Abbey Way, High Wycombe.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2024 at 11:33.

Buckinghamshire Council logo

Until
5 Apr 2024
Details
View Map
Share
Hill Farm Road

Buckinghamshire Council are carrying out Highway improvement works on Hill Farm Road, Marlow Bottom.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 09:00 and could run through until 5 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Mar 2024 at 08:31.

Scottish Hydro Electric Power Dis logo

Between
25 Mar and 12 Apr 2024
Details
View Map
Share
The Pound

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Pound, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2024 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Nov 2023 at 14:55.

Buckinghamshire Council logo

Until
5 Apr 2024
Details
View Map
Share
Cliveden Road

Buckinghamshire Council are carrying out Highway improvement works on Cliveden Road, Taplow.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 11:30 and could run through until 5 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 28 Mar 2024 at 10:08.

Cadent Gas logo

Finishing
Thursday
Details
View Map
Share
Fernie Fields

Cadent Gas are carrying out Utility repair and maintenance works on Fernie Fields, Booker, High Wycombe.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 12:50 and could run through until 4 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 14:45.

Affinity Water logo

LONG TERM
Between
26 Mar and 7 May 2024
Details
View Map
Share
Riverpark Drive

Affinity Water are proposing to carry out Utility asset works on Riverpark Drive, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2024 and could run through until 7 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 9 Nov 2023 at 14:46.

Thames Water logo

Between
27 Mar and 15 Apr 2024
Details
View Map
Share
Lock Road

Thames Water are proposing to carry out Utility asset works on Lock Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2024 and could run through until 15 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Dec 2023 at 11:28.

Thames Water logo

Finishing
Wednesday
Details
View Map
Share
Green Street

Thames Water are proposing to carry out Utility repair and maintenance works on Green Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jan 2024 at 09:54.

Nexfibre Networks Limited logo

Between
1 and 8 Apr 2024
Details
View Map
Share
South Place

Nexfibre Networks Limited are proposing to carry out Utility asset works on South Place, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 8 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 15 Jan 2024 at 09:24.

Cityfibre Metro Networks logo

LONG TERM
Between
1 Apr and 2 May 2024
Details
View Map
Share
Hughenden Avenue

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Hughenden Avenue, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 2 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Mar 2024 at 13:48.

Buckinghamshire Council logo

Between
1 and 12 Apr 2024
Details
View Map
Share
Cressex Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Cressex Road, Cressex, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Feb 2024 at 12:10.

Thames Water logo

Finishing
Thursday
Details
View Map
Share
Deeds Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Deeds Grove, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 4 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Jan 2024 at 10:06.

Thames Water logo

Between
7 and 9 Apr 2024
Details
View Map
Share
Rectory Hill

Thames Water are proposing to carry out New service connection on Rectory Hill, Hambleden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Jan 2024 at 08:41.

Buckinghamshire Council logo

Between
7 and 12 Apr 2024
Details
View Map
Share
Rectory Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Rectory Road, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 1 Mar 2024 at 11:32.

South East Water logo

Between
8 and 12 Apr 2024
Details
View Map
Share
Hills Lane

South East Water are proposing to carry out Utility repair and maintenance works on Hills Lane, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 12 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 8 Nov 2023 at 16:25.

Thames Water logo

Between
8 and 11 Apr 2024
Details
View Map
Share
Bottom Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Bottom Hill, Colstrope.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 11 April 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Jan 2024 at 09:44.

Buckinghamshire Council logo

Between
9 and 11 Apr 2024
Details
View Map
Share
Oxford Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Oxford Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Dec 2023 at 14:57.

Thames Water logo

Between
10 Apr and 8 May 2024
Details
View Map
Share
Gossmore Lane

Thames Water are proposing to carry out Utility asset works on Gossmore Lane, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2024 and could run through until 8 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 14 Feb 2024 at 11:14.

Buckinghamshire Council logo

LONG TERM
Between
11 Apr and 16 May 2024
Details
View Map
Share
Bridge Street

Buckinghamshire Council are proposing to carry out roadworks on Bridge Street, High Wycombe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Jan 2024 at 10:29.

Buckinghamshire Council logo

Between
14 and 18 Apr 2024
Details
View Map
Share
Hedsor Road

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Hedsor Road, Hedsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 26 Mar 2024 at 12:17.

Buckinghamshire Council logo

Between
15 and 17 Apr 2024
Details
View Map
Share
Boundary Place

Buckinghamshire Council are proposing to carry out Highway improvement works on Boundary Place, Wooburn Green.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 21 Dec 2023 at 14:53.

Scottish Hydro Electric Power Dis logo

Between
15 Apr and 10 May 2024
Details
View Map
Share
Totteridge Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Totteridge Road, Totteridge, High Wycombe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 Jan 2024 at 15:35.

Buckinghamshire Council logo

Between
15 Apr and 10 May 2024
Details
View Map
Share
The Parade

Buckinghamshire Council are proposing to carry out Highway improvement works on The Parade, Bourne End.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Mar 2024 at 10:43.

South East Water logo

Between
16 and 18 Apr 2024
Details
View Map
Share
Broadway

South East Water are proposing to carry out Utility repair and maintenance works on Broadway, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 2 Feb 2024 at 10:44.

Affinity Water logo

Between
16 Apr and 14 May 2024
Details
View Map
Share
Riverpark Drive

Affinity Water are proposing to carry out Utility asset works on Riverpark Drive, Marlow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 15 Nov 2023 at 13:55.

Buckinghamshire Council logo

Between
21 and 24 Apr 2024
Details
View Map
Share
Bockmer Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Bockmer Lane, Medmenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Nov 2023 at 11:37.

Buckinghamshire Council logo

Between
22 and 25 Apr 2024
Details
View Map
Share
London Road

Buckinghamshire Council are proposing to carry out Highway improvement works on London Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 14 Feb 2024 at 09:11.

Buckinghamshire Council logo

Between
22 and 24 Apr 2024
Details
View Map
Share
Parmoor Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Parmoor Lane, Frieth.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 18 Dec 2023 at 11:26.

Buckinghamshire Council logo

Between
24 and 30 Apr 2024
Details
View Map
Share
Station Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Station Road, Bourne End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 15 Mar 2024 at 10:46.

Buckinghamshire Council logo

Between
28 and 30 Apr 2024
Details
View Map
Share
Ferry Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Ferry Lane, Medmenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 27 Nov 2023 at 11:38.

Buckinghamshire Council logo

Between
5 and 13 May 2024
Details
View Map
Share
Glenisters Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Glenisters Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 17 Jan 2024 at 15:10.

Murphy Power Distribution logo

Between
6 and 19 May 2024
Details
View Map
Share
Bridge Street

Murphy Power Distribution are proposing to carry out Utility asset works on Bridge Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 8 Mar 2024 at 11:41.

Buckinghamshire Council logo

LONG TERM
Between
6 May and 13 Jun 2024
Details
View Map
Share
Mill Lane

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Mar 2024 at 15:29.

Murphy Power Distribution logo

Between
6 and 19 May 2024
Details
View Map
Share
Bridge Street

Murphy Power Distribution are proposing to carry out Utility asset works on Bridge Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 12:56.

Thames Water logo

Between
7 and 27 May 2024
Details
View Map
Share
Castle Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Castle Hill, Maidenhead.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jan 2024 at 16:58.

Nexfibre Networks Limited logo

Between
12 and 23 May 2024
Details
View Map
Share
Dedmere Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Dedmere Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 15 Jan 2024 at 12:06.

Cadent Gas logo

LONG TERM
Between
12 May and 7 Jul 2024
Details
View Map
Share
Ray Park Avenue

Cadent Gas are proposing to carry out Utility asset works on Ray Park Avenue, Maidenhead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Mar 2024 at 14:59.

ES Pipelines logo

Between
12 and 23 May 2024
Details
View Map
Share
Kiln Lane

ES Pipelines are proposing to carry out Utility asset works on Kiln Lane, Cores End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by ES Pipelines on 23 Feb 2024 at 08:43.

Buckinghamshire Council logo

On
12 May 2024
Details
View Map
Share
Marlow Restricted Byway 36

Buckinghamshire Council are proposing to carry out roadworks on Marlow Restricted Byway 36, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 12 May 2024 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 19 Mar 2024 at 13:38.

Buckinghamshire Council logo

Between
13 and 15 May 2024
Details
View Map
Share
Heath End Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Heath End Road, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Jan 2024 at 13:57.

Buckinghamshire Council logo

Between
16 and 20 May 2024
Details
View Map
Share
Sheepridge Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Sheepridge Lane, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Jan 2024 at 14:01.

Buckinghamshire Council logo

Between
16 and 20 May 2024
Details
View Map
Share
Heath End Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Heath End Road, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 31 Jan 2024 at 14:03.

Thames Water logo

Between
16 and 18 May 2024
Details
View Map
Share
Desborough Park Road

Thames Water are proposing to carry out Remedial works on Desborough Park Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Feb 2024 at 12:12.

Murphy Power Distribution logo

Between
20 and 26 May 2024
Details
View Map
Share
Bridge Street

Murphy Power Distribution are proposing to carry out Utility asset works on Bridge Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 15 Mar 2024 at 10:36.

Murphy Power Distribution logo

Between
20 May and 2 Jun 2024
Details
View Map
Share
Brook Street

Murphy Power Distribution are proposing to carry out Utility asset works on Brook Street, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 15 Mar 2024 at 10:35.

South East Water logo

Between
21 and 23 May 2024
Details
View Map
Share
Warners Hill

South East Water are proposing to carry out Highway repair and maintenance works on Warners Hill, Cookham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 23 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 19 Feb 2024 at 10:04.

Thames Water logo

Between
22 May and 20 Jun 2024
Details
View Map
Share
Riverpark Drive

Thames Water are proposing to carry out Utility asset works on Riverpark Drive, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 20 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Feb 2024 at 13:01.

Cadent Gas logo

LONG TERM
Between
26 May and 4 Sep 2024
Details
View Map
Share
Henley Road

Cadent Gas are proposing to carry out Utility asset works on Henley Road, Marlow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 4 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Feb 2024 at 13:05.

Thames Water logo

Between
27 and 29 May 2024
Details
View Map
Share
Desborough Avenue

Thames Water are proposing to carry out Utility repair and maintenance works on Desborough Avenue, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Mar 2024 at 12:54.

Nexfibre Networks Limited logo

Between
27 May and 13 Jun 2024
Details
View Map
Share
Crown Road

Nexfibre Networks Limited are proposing to carry out Utility asset works on Crown Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 13 Mar 2024 at 10:10.

Nexfibre Networks Limited logo

Between
27 May and 13 Jun 2024
Details
View Map
Share
Klondyke

Nexfibre Networks Limited are proposing to carry out Utility asset works on Klondyke, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 13 Mar 2024 at 10:10.

Nexfibre Networks Limited logo

Between
27 May and 13 Jun 2024
Details
View Map
Share
Dukes Place

Nexfibre Networks Limited are proposing to carry out Utility asset works on Dukes Place, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 13 Mar 2024 at 10:11.

Gigaclear logo

Between
27 and 30 May 2024
Details
View Map
Share
Remenham Lane

Gigaclear are proposing to carry out Utility asset works on Remenham Lane, Remenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 7 Mar 2024 at 10:27.

South East Water logo

Between
28 and 31 May 2024
Details
View Map
Share
St Marks Road

South East Water are proposing to carry out Utility repair and maintenance works on St Marks Road, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 5 Feb 2024 at 16:02.

Buckinghamshire Council logo

Between
29 and 31 May 2024
Details
View Map
Share
Gomm Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Gomm Road, Wycombe Marsh, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Mar 2024 at 12:06.

Cadent Gas logo

LONG TERM
Between
2 Jun and 11 Nov 2024
Details
View Map
Share
Marlow Bottom

Cadent Gas are proposing to carry out Utility asset works on Marlow Bottom, Marlow Bottom.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 11 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2024 at 10:13.

Thames Water logo

Between
2 and 6 Jun 2024
Details
View Map
Share
Piddington Lane

Thames Water are proposing to carry out New service connection on Piddington Lane, Wheeler End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 11:18.

Between
2 and 7 Jun 2024
Details
View Map
Share
Honey Lane

Royal Borough Of Windsor And Maidenhead are proposing to carry out Highway improvement works on Honey Lane, Hurley, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Windsor And Maidenhead on 6 Mar 2024 at 15:45.

Cadent Gas logo

Between
2 and 6 Jun 2024
Details
View Map
Share
Beaumont Rise

Cadent Gas are proposing to carry out Utility asset works on Beaumont Rise, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 09:54.

Buckinghamshire Council logo

Between
3 and 24 Jun 2024
Details
View Map
Share
Chapel Street

Buckinghamshire Council are proposing to carry out Highway repair and maintenance works on Chapel Street, Marlow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Buckinghamshire Council on 19 Mar 2024 at 10:43.

Cadent Gas logo

Between
9 and 30 Jun 2024
Details
View Map
Share
Ragmans Lane

Cadent Gas are proposing to carry out Utility asset works on Ragmans Lane, Marlow Bottom.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Mar 2024 at 14:48.

Cadent Gas logo

Between
9 and 30 Jun 2024
Details
View Map
Share
Hinton Close

Cadent Gas are proposing to carry out Utility asset works on Hinton Close, High Wycombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Mar 2024 at 15:15.

Scottish Hydro Electric Power Dis logo

Between
10 and 13 Jun 2024
Details
View Map
Share
Beaumont Rise

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Beaumont Rise, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Mar 2024 at 15:38.

Buckinghamshire Council logo

Between
13 and 17 Jun 2024
Details
View Map
Share
Desborough Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Desborough Road, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 8 Mar 2024 at 11:04.

Cadent Gas logo

Between
16 and 30 Jun 2024
Details
View Map
Share
Mill Road

Cadent Gas are proposing to carry out Utility asset works on Mill Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Mar 2024 at 13:19.

Cadent Gas logo

Between
16 and 20 Jun 2024
Details
View Map
Share
Rutland Avenue

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Rutland Avenue, Castlefield, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 12:49.

Buckinghamshire Council logo

Between
17 and 19 Jun 2024
Details
View Map
Share
Lock Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Lock Road, Marlow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 15 Mar 2024 at 15:16.

National Highways logo

LONG TERM
Between
17 Jun and 9 Aug 2024
Details
View Map
Share
The Green

National Highways are proposing to carry out Highway repair and maintenance works on The Green, Bisham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 9 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 7 Feb 2024 at 15:04.

National Highways logo

LONG TERM
Between
17 Jun and 9 Aug 2024
Details
View Map
Share
The Green

National Highways are proposing to carry out Highway repair and maintenance works on The Green, Bisham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Feb 2024 at 12:23.

Thames Water logo

Between
17 and 19 Jun 2024
Details
View Map
Share
Coldmoorholme Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Coldmoorholme Lane, Well End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 16:31.

BT logo

Between
18 and 22 Jun 2024
Details
View Map
Share
High Street

BT are proposing to carry out Utility repair and maintenance works on High Street, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Mar 2024 at 09:59.

Buckinghamshire Council logo

Between
21 and 25 Jun 2024
Details
View Map
Share
Chapman Lane

Buckinghamshire Council are proposing to carry out Highway improvement works on Chapman Lane, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 12 Mar 2024 at 13:14.

Cadent Gas logo

LONG TERM
Between
23 Jun and 28 Jul 2024
Details
View Map
Share
Mill Lane

Cadent Gas are proposing to carry out Utility asset works on Mill Lane, Taplow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2024 at 14:51.

Buckinghamshire Council logo

Between
24 and 30 Jun 2024
Details
View Map
Share
Hedsor Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Hedsor Road, Bourne End.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 15 Mar 2024 at 11:45.

Buckinghamshire Council logo

Between
24 and 28 Jun 2024
Details
View Map
Share
Blenheim Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Blenheim Road, Cressex Business Park, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 7 Mar 2024 at 13:09.

Thames Water logo

Between
25 and 29 Jun 2024
Details
View Map
Share
Winchbottom Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Winchbottom Lane, Flackwell Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2024 and could run through until 29 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 14:03.

Buckinghamshire Council logo

Between
26 and 28 Jun 2024
Details
View Map
Share
Underwood Road

Buckinghamshire Council are proposing to carry out Highway improvement works on Underwood Road, Bowerdean, High Wycombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Buckinghamshire Council on 8 Mar 2024 at 10:55.


Roadworks Map near to Moyleen Rise, MARLOW, SL7 2DP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 29 Mar 2024 13:08
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.

Roadworks Listing near to Moyleen Rise, MARLOW, SL7 2DP (23 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Scottish Hydro Electric Power Dis logo
MAJOR
  
WEST STREET (0.3 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 11 Mar 2024 - 5 Apr 2024
0.3
Share
2
Nexfibre Networks Limited logo
MAJOR
  
CAMBRIDGE ROAD (0.3 miles)
Nexfibre Networks Limited
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 18 Mar 2024 13:00
(Scheduled: 18 Mar 2024 - 3 Apr 2024)
0.3
Share
3
Thames Water logo
URGENT
  
OXFORD ROAD (0.3 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Complete
26 Mar 2024 19:43 - 29 Mar 2024 12:46
0.3
Share
4
Nexfibre Networks Limited logo
MAJOR
  
POUND LANE (0.3 miles)
Nexfibre Networks Limited
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 11 Sep 2023 11:00
(Scheduled: 10 Sep 2023 - 8 May 2024)
0.3
Share
5
Thames Water logo
URGENT
  
YORK ROAD (0.3 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 28 Mar 2024 12:07
(Scheduled: 28 Mar 2024 - 3 Apr 2024)
0.3
Share
6
Buckinghamshire Council logo
MAJOR
  
SPITTAL STREET (0.4 miles)
Buckinghamshire Council
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Road closure
Planned
Scheduled: 29 Mar 2024
0.4
Share
7
Buckinghamshire Council logo
MAJOR
  
HIGH STREET (0.5 miles)
Buckinghamshire Council
Optional permit (no fee) e.g. for traffic management etc - Carriageway - Road closure
Planned
Scheduled: 29 Mar 2024
0.5
Share
8
Cadent Gas logo
THE CAUSEWAY (0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 22 Mar 2024 07:49
(Scheduled: 18 Mar 2024 - 4 Apr 2024)
0.5
Share
9
Cadent Gas logo
MAJOR
  
MARLOW FOOTPATH 1B (0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 22 Mar 2024 07:51
(Scheduled: 18 Mar 2024 - 14 Apr 2024)
0.5
Share
10
Buckinghamshire Council logo
BEECHWOOD DRIVE (0.5 miles)
Buckinghamshire Council
Highway improvement works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 18 Mar 2024 - 30 Mar 2024
0.5
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.