ROADWORKS SUMMARY
SE16 2QS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for SE16 2QS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to SE16 2QS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Tideway Tunnel logo
LONG TERM
Until
26 Jun 2024
Details
View Map
Share
Follow
Nine Elms Lane

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 June 2019 at 07:00 and could run through until 26 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 12 Oct 2023 at 12:48.

Thames Tideway Tunnel logo
LONG TERM
Until
30 Nov 2024
Details
View Map
Share
Follow
Chelsea Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2020 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 15 Feb 2024 at 15:50.

Thames Tideway Tunnel logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
Norman Road

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Norman Road, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 July 2020 at 08:00 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 13:25.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Oct 2024
Details
View Map
Share
Follow
Deptford Church Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2020 at 08:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 09:27.

Thames Tideway Tunnel logo
LONG TERM
Until
30 May 2024
Details
View Map
Share
Follow
Deptford Church Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.

These works are categorised as Major.

The works started on 17 July 2020 at 08:00 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 09:28.

Thames Tideway Tunnel logo
LONG TERM
Until
30 Aug 2024
Details
View Map
Share
Follow
Yeoman Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Yeoman Street, London.

These works are categorised as Major.

The works started on 17 July 2020 at 08:00 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 4 Nov 2021 at 15:19.

Thames Tideway Tunnel logo
LONG TERM
Until
30 Aug 2024
Details
View Map
Share
Follow
Croft Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 July 2020 at 07:00 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 8 Nov 2021 at 12:02.

Thames Tideway Tunnel logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
West Lane

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on West Lane, London.

These works are categorised as Major.

The works started on 27 July 2020 at 07:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 23 Nov 2021 at 10:01.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Oct 2024
Details
View Map
Share
Follow
Coffey Road

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Coffey Road, London.

These works are categorised as Major.

The works started on 4 August 2020 at 07:00 and could run through until 31 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 20 Jul 2023 at 09:29.

Thames Water logo
LONG TERM
Until
22 Aug 2202
Details
View Map
Share
Follow
St John Street

Thames Water are carrying out Utility repair and maintenance works on St John Street, Islington, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2021 at 11:14 and could run through until 22 August 2202. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2021 at 15:30.

Thames Water logo
LONG TERM
Until
30 Jun 2024
Details
View Map
Share
Follow
Vulcan Road

Thames Water are carrying out roadworks on Vulcan Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2021 at 09:00 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 10:50.

City Of London Corporation logo
LONG TERM
Between
6 Dec 2021 and 25 Jul 2024
Details
View Map
Share
Follow
Blackfriars Bridge

City Of London Corporation are proposing to carry out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2021 and could run through until 25 July 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of London Corporation on 22 Nov 2021 at 16:21.

London Borough Of Southwark logo
LONG TERM
Until
1 Jan 2025
Details
View Map
Share
Follow
Croft Street

London Borough Of Southwark are carrying out Highway improvement works on Croft Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2022 at 00:00 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 23:15.

Thames Tideway Tunnel logo
LONG TERM
Between
18 Sep 2022 and 12 Jul 2024
Details
View Map
Share
Follow
Albert Embankment

Thames Tideway Tunnel are proposing to carry out Utility repair and maintenance works on Albert Embankment, Prince's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2022 and could run through until 12 July 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Tideway Tunnel on 8 Mar 2021 at 13:32.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Threadneedle Street

City Of London Corporation are carrying out Highway improvement works on Threadneedle Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 October 2022 at 07:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:21.

Thames Water logo
LONG TERM
Between
31 Oct 2022 and 30 Jan 2025
Details
View Map
Share
Follow
Millennium Way

Thames Water are proposing to carry out Utility asset works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 October 2022 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Oct 2022 at 05:47.

Transport for London (TfL) logo
LONG TERM
Between
14 Nov 2022 and 4 May 2024
Details
View Map
Share
Follow
Farringdon Road

Transport for London (TfL) are proposing to carry out roadworks on Farringdon Road, Islington, London.

These works are categorised as Major.

The works will start on or after 14 November 2022 and could run through until 4 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 14:26.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out roadworks on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2022 and could run through until 19 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2023 at 10:10.

Transport for London (TfL) logo
LONG TERM
Between
1 Dec 2022 and 4 May 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out roadworks on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2022 and could run through until 4 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2024 at 13:30.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Lombard Street

City Of London Corporation are carrying out Highway repair and maintenance works on Lombard Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2022 at 08:00 and could run through until 30 April 2024. The works will impact the footway only.

This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:02.

Network Rail logo
LONG TERM
Until
1 May 2024
Details
View Map
Share
Follow
Kingsbury Road

Network Rail are carrying out Works for Rail Purposes on Kingsbury Road, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 December 2022 at 17:30 and could run through until 1 May 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by Network Rail on 25 Jan 2024 at 12:42.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2023 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Jan 2023 at 09:41.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Sloane Terrace

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Ellis Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Ellis Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 15:53.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Pont Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pont Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Cadogan Place

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Harriet Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Harriet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Mansion House Street

City Of London Corporation are carrying out Highway repair and maintenance works on Mansion House Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 February 2023 at 08:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:04.

City Of London Corporation logo
LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Prince's Street

City Of London Corporation are carrying out Highway improvement works on Prince's Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 February 2023 at 08:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:19.

LONG TERM
Until
31 Aug 2024
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2023 at 07:00 and could run through until 31 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 1 Mar 2024 at 12:19.

Transport for London (TfL) logo
LONG TERM
Between
27 Mar 2023 and 8 Sep 2025
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are proposing to carry out roadworks on Bishopsgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2023 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Mar 2023 at 15:47.

Transport for London (TfL) logo
LONG TERM
Between
29 Mar 2023 and 25 Mar 2025
Details
View Map
Share
Follow
St Thomas Street

Transport for London (TfL) are proposing to carry out roadworks on St Thomas Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2023 and could run through until 25 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 14:01.

Transport for London (TfL) logo
LONG TERM
Until
27 Sep 2024
Details
View Map
Share
Follow
Millennium Way

Transport for London (TfL) are carrying out Highway improvement works on Millennium Way, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 31 March 2023 at 17:00 and could run through until 27 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Jul 2023 at 13:31.

London Borough Of Southwark logo
LONG TERM
Until
7 May 2024
Details
View Map
Share
Follow
Walworth Square

London Borough Of Southwark are carrying out Highway improvement works on Walworth Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2023 at 23:00 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 11:58.

London Borough Of Southwark logo
LONG TERM
Until
4 May 2024
Details
View Map
Share
Follow
Risborough Street

London Borough Of Southwark are carrying out Highway improvement works on Risborough Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 April 2023 at 23:00 and could run through until 4 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 09:07.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Cadogan Gardens

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Cadogan Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2023 at 07:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 May 2023 at 08:01.

LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Romford Road

London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 June 2023 at 07:00 and could run through until 30 April 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 19 Mar 2024 at 14:57.

Transport for London (TfL) logo
LONG TERM
Until
4 May 2024
Details
View Map
Share
Follow
Tunnel Avenue

Transport for London (TfL) are carrying out Highway improvement works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 June 2023 at 05:00 and could run through until 4 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Nov 2023 at 06:50.

London Borough Of Hackney logo
LONG TERM
Between
4 Jul 2023 and 12 May 2024
Details
View Map
Share
Follow
Lea Bridge Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2023 and could run through until 12 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 3 May 2023 at 10:19.

London Borough Of Southwark logo
LONG TERM
Until
24 Jul 2024
Details
View Map
Share
Follow
Warndon Street

London Borough Of Southwark are carrying out Highway improvement works on Warndon Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 July 2023 at 23:00 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 15 Nov 2023 at 10:50.

London Borough Of Southwark logo
LONG TERM
Until
11 Jan 2025
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 July 2023 at 23:00 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 19:14.

London Borough Of Southwark logo
LONG TERM
Until
11 Jan 2025
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 July 2023 at 23:00 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 19:14.

London Borough Of Southwark logo
LONG TERM
Until
11 Jan 2025
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 July 2023 at 23:00 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 19:14.

London Borough Of Southwark logo
LONG TERM
Between
12 Jul 2023 and 12 Aug 2024
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2023 and could run through until 12 August 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 27 Jul 2023 at 09:21.

Thames Tideway Tunnel logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Cringle Street

Thames Tideway Tunnel are carrying out Works for road purposes on Cringle Street, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2023 at 08:00 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 14 Mar 2024 at 15:48.

Thames Water logo
LONG TERM
Until
23 Apr 2025
Details
View Map
Share
Follow
Welsford Street

Thames Water are carrying out roadworks on Welsford Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 14:30 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Jul 2023 at 16:01.

London Borough Of Hackney logo
LONG TERM
Until
2 Jun 2024
Details
View Map
Share
Follow
Lea Bridge Road

London Borough Of Hackney are carrying out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 July 2023 at 08:05 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 24 Jul 2023 at 08:05.

Thames Water logo
LONG TERM
Until
19 Sep 2024
Details
View Map
Share
Follow
Barking Road

Thames Water are carrying out Utility asset works on Barking Road, East Ham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 July 2023 at 17:03 and could run through until 19 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Dec 2023 at 09:11.

London Borough Of Southwark logo
LONG TERM
Until
20 May 2025
Details
View Map
Share
Follow
Ann Moss Way

London Borough Of Southwark are carrying out Highway improvement works on Ann Moss Way, London.

These works are categorised as Major.

The works started on 21 August 2023 at 05:11 and could run through until 20 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Jan 2024 at 10:37.

London Borough Of Southwark logo
LONG TERM
Until
24 Apr 2024
Details
View Map
Share
Follow
Albion Street

London Borough Of Southwark are carrying out Highway improvement works on Albion Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 August 2023 at 23:00 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 17 Jan 2024 at 12:32.

Transport for London (TfL) logo
LONG TERM
Between
29 Aug 2023 and 24 Oct 2024
Details
View Map
Share
Follow
Stamford Street

Transport for London (TfL) are proposing to carry out roadworks on Stamford Street, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 August 2023 and could run through until 24 October 2024. The works will impact the footway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2023 at 14:31.

LONG TERM
Until
8 Jul 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 September 2023 at 07:00 and could run through until 8 July 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Newham on 5 Sep 2023 at 11:00.

Transport for London (TfL) logo
LONG TERM
Between
6 Sep 2023 and 3 Sep 2025
Details
View Map
Share
Follow
Walworth Road

Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 14:54.

City Of Westminster logo
LONG TERM
Between
9 Sep 2023 and 11 Sep 2024
Details
View Map
Share
Follow
Wigmore Street

City Of Westminster are proposing to carry out Highway improvement works on Wigmore Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2023 and could run through until 11 September 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Westminster on 28 Jun 2023 at 05:54.

LONG TERM
Until
13 Aug 2024
Details
View Map
Share
Follow
Queens Market

London Borough Of Newham are carrying out Highway improvement works on Queens Market, Upton Park, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 12 September 2023 at 21:00 and could run through until 13 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 5 Mar 2024 at 12:41.

LONG TERM
Until
31 Aug 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 September 2023 at 12:00 and could run through until 31 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 30 Jan 2024 at 09:28.

London Borough Of Southwark logo
LONG TERM
Until
22 Jun 2024
Details
View Map
Share
Follow
Lower Road

London Borough Of Southwark are carrying out Highway improvement works on Lower Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 22 September 2023 at 23:00 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Oct 2023 at 05:52.

London Borough Of Camden logo
LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Tavistock Square

London Borough Of Camden are carrying out Highway improvement works on Tavistock Square, Bloomsbury, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 September 2023 at 14:00 and could run through until 30 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 29 Sep 2023 at 15:00.

Thames Water logo
LONG TERM
Between
25 Sep 2023 and 31 Jan 2025
Details
View Map
Share
Follow
Jamaica Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Jamaica Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2023 and could run through until 31 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 22 May 2023 at 10:12.

London Borough Of Southwark logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Bankside

London Borough Of Southwark are carrying out Highway improvement works on Bankside, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 30 September 2023 at 23:00 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2023 at 12:22.

Transport for London (TfL) logo
LONG TERM
Between
1 Oct 2023 and 10 Oct 2025
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, Canning Town, London.

These works are categorised as Major.

The works will start on or after 1 October 2023 and could run through until 10 October 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 May 2023 at 08:39.

Transport for London (TfL) logo
LONG TERM
Until
4 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel Southern Approach

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2023 at 04:00 and could run through until 4 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 07:29.

Thames Water logo
LONG TERM
Until
23 Apr 2024
Details
View Map
Share
Follow
Crowndale Road

Thames Water are carrying out Utility asset works on Crowndale Road, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 09:21 and could run through until 23 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 10:24.

London Borough Of Camden logo
LONG TERM
Until
29 Jun 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway improvement works on York Way, St Pancras And Somers Town, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2023 at 09:00 and could run through until 29 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 26 Mar 2024 at 07:15.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 22:46.

City Of Westminster logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Embankment Place

City Of Westminster are carrying out Highway improvement works on Embankment Place, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 October 2023 at 08:00 and could run through until 16 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 2 Apr 2024 at 06:12.

LONG TERM
Between
6 Nov 2023 and 5 May 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 17:57.

LONG TERM
Until
31 Aug 2024
Details
View Map
Share
Follow
Connaught Bridge

London Borough Of Newham are carrying out Highway improvement works on Connaught Bridge, Silvertown, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 08:00 and could run through until 31 August 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 30 Jan 2024 at 09:56.

LONG TERM
Between
6 Nov 2023 and 5 May 2024
Details
View Map
Share
Follow
Connaught Bridge

London Borough Of Newham are proposing to carry out Highway improvement works on Connaught Bridge, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 17:58.

LONG TERM
Between
6 Nov 2023 and 5 May 2024
Details
View Map
Share
Follow
Connaught Bridge

London Borough Of Newham are proposing to carry out Highway improvement works on Connaught Bridge, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 18:01.

LONG TERM
Between
6 Nov 2023 and 5 May 2024
Details
View Map
Share
Follow
Connaught Road

London Borough Of Newham are proposing to carry out Highway improvement works on Connaught Road, Silvertown, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 18:01.

Thames Water logo
LONG TERM
Until
23 Apr 2024
Details
View Map
Share
Follow
Eversholt Street

Thames Water are carrying out Utility asset works on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 11:45 and could run through until 23 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 10:25.

LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
High Street

London Borough Of Newham are carrying out Highway improvement works on High Street, Plaistow, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2023 at 08:00 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 24 Jan 2024 at 16:21.

London Borough Of Southwark logo
LONG TERM
Until
7 May 2024
Details
View Map
Share
Follow
Walworth Square

London Borough Of Southwark are carrying out Highway improvement works on Walworth Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 November 2023 at 08:08 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 7 Mar 2024 at 12:05.

LONG TERM
Until
31 Aug 2024
Details
View Map
Share
Follow
Silvertown Way

London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 31 August 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 30 Jan 2024 at 14:19.

Network Rail logo
LONG TERM
Until
1 May 2024
Details
View Map
Share
Follow
St Jude Street

Network Rail are carrying out Works for Rail Purposes on St Jude Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Nov 2023 at 08:33.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Reverdy Road

Thames Water are carrying out Disconnection or alteration of supply on Reverdy Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2023 at 09:30 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 15:30.

London Borough Of Southwark logo
LONG TERM
Until
28 Nov 2024
Details
View Map
Share
Follow
Bankside

London Borough Of Southwark are carrying out Highway improvement works on Bankside, London.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 29 November 2023 at 06:11 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Nov 2023 at 06:14.

Thames Water logo
LONG TERM
Until
12 May 2024
Details
View Map
Share
Follow
Strand

Thames Water are carrying out Utility repair and maintenance works on Strand, St James's, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 November 2023 at 13:00 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 07:27.

Transport for London (TfL) logo
LONG TERM
Until
30 Jun 2024
Details
View Map
Share
Follow
Tunnel Avenue

Transport for London (TfL) are carrying out Highway improvement works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 December 2023 at 06:00 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 1 Dec 2023 at 09:20.

Transport for London (TfL) logo
LONG TERM
Between
4 Dec 2023 and 3 May 2024
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out roadworks on Borough High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2023 and could run through until 3 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2023 at 12:45.

Transport for London (TfL) logo
LONG TERM
Between
4 Dec 2023 and 18 Jun 2024
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out roadworks on Borough High Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2023 and could run through until 18 June 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2024 at 13:42.

London Borough Of Southwark logo
LONG TERM
Until
16 Jul 2024
Details
View Map
Share
Follow
Albion Street

London Borough Of Southwark are carrying out Highway improvement works on Albion Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 December 2023 at 19:28 and could run through until 16 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 17 Dec 2023 at 19:31.

Thames Water logo
LONG TERM
Until
24 May 2024
Details
View Map
Share
Follow
Lawrie Park Road

Thames Water are carrying out Disconnection or alteration of supply on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 January 2024 at 08:30 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 08:12.

Thames Water logo
LONG TERM
Until
24 May 2024
Details
View Map
Share
Follow
Crystal Palace Park Road

Thames Water are carrying out Disconnection or alteration of supply on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 January 2024 at 06:45 and could run through until 24 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 08:12.

Thames Water logo
LONG TERM
Until
28 May 2024
Details
View Map
Share
Follow
Linden Grove

Thames Water are carrying out Utility repair and maintenance works on Linden Grove, London.

These works are categorised as Major.

The works started on 4 January 2024 at 08:00 and could run through until 28 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Jan 2024 at 14:29.

Thames Water logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Monnow Road

Thames Water are carrying out Disconnection or alteration of supply on Monnow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 January 2024 at 10:00 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Apr 2024 at 15:30.

Thames Water logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Monnow Road

Thames Water are carrying out Disconnection or alteration of supply on Monnow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 January 2024 at 10:00 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 15:30.

Transport for London (TfL) logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Tunnel Avenue

Transport for London (TfL) are carrying out Highway improvement works on Tunnel Avenue, Greenwich.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 07:00 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 07:38.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Thames Road

London Borough Of Newham are proposing to carry out Section 50 on Thames Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 4 Jan 2024 at 09:37.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Booth Road

London Borough Of Newham are proposing to carry out Section 50 on Booth Road, Silvertown, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:22.

LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Section 50 on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 January 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 10 Jan 2024 at 09:24.

LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are carrying out Section 50 on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

The works started on 4 January 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 15 Apr 2024 at 13:12.

LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Burt Road

London Borough Of Newham are carrying out Section 50 on Burt Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 January 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 10 Jan 2024 at 09:26.

LONG TERM
Between
2 Jan and 19 Dec 2024
Details
View Map
Share
Follow
Charles Street

London Borough Of Newham are proposing to carry out Section 50 on Charles Street, Silvertown, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:20.

London Borough Of Lambeth logo
LONG TERM
Between
2 Jan and 2 Jul 2024
Details
View Map
Share
Follow
Waterloo Bridge

London Borough Of Lambeth are proposing to carry out Remedial works on Waterloo Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 3 Oct 2023 at 07:51.

HS2 logo
LONG TERM
Between
2 Jan and 30 Apr 2024
Details
View Map
Share
Follow
Stanhope Street

HS2 are proposing to carry out Works for Rail Purposes on Stanhope Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by HS2 on 11 Dec 2023 at 13:50.

LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Dyson Road

London Borough Of Newham are carrying out Highway improvement works on Dyson Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 08:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 13 Mar 2024 at 13:17.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
New Cross Road

Thames Water are carrying out Utility repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 10:00 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 09:09.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Warwick Way

Thames Water are carrying out Utility asset works on Warwick Way, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:45 and could run through until 21 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2024 at 08:59.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Denbigh Street

Thames Water are carrying out Utility asset works on Denbigh Street, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:45 and could run through until 21 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2024 at 08:58.

Thames Water logo
LONG TERM
Until
30 May 2024
Details
View Map
Share
Follow
Denbigh Street

Thames Water are carrying out Utility asset works on Denbigh Street, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:45 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 10:46.

Thames Water logo
LONG TERM
Until
18 Aug 2024
Details
View Map
Share
Follow
Wilton Road

Thames Water are carrying out Utility asset works on Wilton Road, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:45 and could run through until 18 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jan 2024 at 09:00.

City Of London Corporation logo
LONG TERM
Until
5 Aug 2024
Details
View Map
Share
Follow
Leadenhall Street

City Of London Corporation are carrying out Highway improvement works on Leadenhall Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2024 at 08:00 and could run through until 5 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 5 Jan 2024 at 08:00.

City Of London Corporation logo
LONG TERM
Until
5 Aug 2024
Details
View Map
Share
Follow
Goring Street

City Of London Corporation are carrying out Highway improvement works on Goring Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2024 at 08:00 and could run through until 5 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 5 Jan 2024 at 08:00.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
8 Jan and 29 Apr 2024
Details
View Map
Share
Follow
Sloane Terrace

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 Dec 2023 at 10:45.

LONG TERM
Until
1 May 2024
Details
View Map
Share
Follow
Bidder Street

London Borough Of Newham are carrying out Section 50 on Bidder Street, Canning Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 09:00 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 15 Jan 2024 at 11:28.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Warren Street

Thames Water are carrying out Utility asset works on Warren Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 16 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 13:29.

LONG TERM
Until
29 Apr 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Newham are carrying out Highway improvement works on Park Road, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 27 Feb 2024 at 09:24.

LONG TERM
Until
29 May 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Newham are carrying out Highway improvement works on Park Road, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 5 Apr 2024 at 07:54.

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Westfield Avenue

London Borough Of Newham are carrying out Highway improvement works on Westfield Avenue, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Newham on 16 Feb 2024 at 10:14.

London Borough Of Hackney logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Wayland Avenue

London Borough Of Hackney are carrying out Highway improvement works on Wayland Avenue, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:17 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:38.

London Borough Of Hackney logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Sigdon Road

London Borough Of Hackney are carrying out Highway improvement works on Sigdon Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:17 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:45.

London Borough Of Hackney logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Sandringham Road

London Borough Of Hackney are carrying out Highway improvement works on Sandringham Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 14:44 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:27.

Thames Water logo
LONG TERM
Until
23 Sep 2024
Details
View Map
Share
Follow
Eaton Square

Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Jan 2024 at 10:27.

Thames Water logo
LONG TERM
Until
7 May 2024
Details
View Map
Share
Follow
Eccleston Street

Thames Water are carrying out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 7 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2024 at 10:14.

Thames Water logo
LONG TERM
Until
19 Jun 2024
Details
View Map
Share
Follow
Hobart Place

Thames Water are carrying out Utility asset works on Hobart Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 19 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Jan 2024 at 10:28.

Transport for London (TfL) logo
LONG TERM
Between
17 Jan 2024 and 14 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Jan and 10 May 2024
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 14:19.

Transport for London (TfL) logo
LONG TERM
Until
3 May 2024
Details
View Map
Share
Follow
Bishopsgate

Transport for London (TfL) are carrying out Highway improvement works on Bishopsgate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 January 2024 at 08:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 13:26.

London Borough Of Southwark logo
LONG TERM
Between
24 Jan and 30 Oct 2024
Details
View Map
Share
Follow
Deal Porters Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porters Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2024 and could run through until 30 October 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 15 Dec 2023 at 16:25.

London Borough Of Lewisham logo
LONG TERM
Until
19 Aug 2024
Details
View Map
Share
Follow
Creekside

London Borough Of Lewisham are carrying out Highway improvement works on Creekside, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 January 2024 at 09:10 and could run through until 19 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 29 Jan 2024 at 09:10.

London Borough Of Lewisham logo
LONG TERM
Until
19 Aug 2024
Details
View Map
Share
Follow
Creekside

London Borough Of Lewisham are carrying out Highway improvement works on Creekside, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 January 2024 at 09:10 and could run through until 19 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Apr 2024 at 09:14.

London Borough Of Southwark logo
LONG TERM
Until
3 Jul 2024
Details
View Map
Share
Follow
Thurlow Street

London Borough Of Southwark are carrying out Highway improvement works on Thurlow Street, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 January 2024 at 14:18 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Jan 2024 at 14:21.

Transport for London (TfL) logo
LONG TERM
Between
2 Feb and 26 Apr 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out roadworks on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 10:09.

Transport for London (TfL) logo
LONG TERM
Between
2 Feb and 25 Apr 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out roadworks on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2024 and could run through until 25 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 10:09.

Thames Water logo
LONG TERM
Between
5 Feb and 12 Jun 2024
Details
View Map
Share
Follow
Bevington Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Bevington Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2024 and could run through until 12 June 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Oct 2023 at 08:59.

LONG TERM
Until
5 Aug 2024
Details
View Map
Share
Follow
Clerkenwell Green

London Borough Of Islington are carrying out Highway improvement works on Clerkenwell Green, Islington, London.

These works are categorised as Major.

The works started on 5 February 2024 at 11:30 and could run through until 5 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 5 Feb 2024 at 11:40.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Mount Rise

Thames Water are carrying out Disconnection or alteration of supply on Mount Rise, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 10:59.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Grassmount

Thames Water are carrying out Disconnection or alteration of supply on Grassmount, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 10:59.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Forestholme Close

Thames Water are carrying out Disconnection or alteration of supply on Forestholme Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:00.

Thames Water logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Taymount Rise

Thames Water are carrying out Disconnection or alteration of supply on Taymount Rise, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 10:59.

Thames Water logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Linsey Street

Thames Water are carrying out Disconnection or alteration of supply on Linsey Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 10:00 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Feb 2024 at 10:56.

Thames Water logo
LONG TERM
Until
25 Apr 2024
Details
View Map
Share
Follow
Collett Road

Thames Water are carrying out Disconnection or alteration of supply on Collett Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 12:30 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 08:08.

Thames Water logo
LONG TERM
Until
25 Apr 2024
Details
View Map
Share
Follow
Collett Road

Thames Water are carrying out Disconnection or alteration of supply on Collett Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 12:30 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 10:04.

Transport for London (TfL) logo
LONG TERM
Until
24 Apr 2024
Details
View Map
Share
Follow
Westminster Bridge

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westminster Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 21:00 and could run through until 24 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2024 at 09:44.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Westminster Bridge

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westminster Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 21:00 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 09:58.

Transport for London (TfL) logo
LONG TERM
Until
24 Apr 2024
Details
View Map
Share
Follow
Westminster Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westminster Bridge Road, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 21:00 and could run through until 24 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Feb 2024 at 09:43.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Westminster Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Westminster Bridge Road, St James's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 21:00 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 15:20.

London Borough Of Hackney logo
LONG TERM
Until
31 Jul 2024
Details
View Map
Share
Follow
Queensbridge Road

London Borough Of Hackney are carrying out Highway improvement works on Queensbridge Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 08:14 and could run through until 31 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 08:14.

London Borough Of Hackney logo
LONG TERM
Between
15 Feb 2024 and 12 Jul 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.

Thames Water logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Marine Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Marine Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2024 and could run through until 22 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 7 Nov 2023 at 10:02.

Thames Water logo
LONG TERM
Between
19 Feb and 25 Jul 2024
Details
View Map
Share
Follow
Coburg Crescent

Thames Water are proposing to carry out Disconnection or alteration of supply on Coburg Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 25 July 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Nov 2023 at 14:44.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are carrying out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 09:30 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 13:36.

London Borough Of Southwark logo
LONG TERM
Between
19 Feb and 10 Jun 2024
Details
View Map
Share
Follow
Deal Porters Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porters Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 18:55.

London Borough Of Hackney logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Buckland Street

London Borough Of Hackney are carrying out Highway improvement works on Buckland Street, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 09:30 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 25 Mar 2024 at 12:48.

London Borough Of Hackney logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Pitfield Street

London Borough Of Hackney are carrying out Highway improvement works on Pitfield Street, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 08:00 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 25 Mar 2024 at 12:54.

London Borough Of Lambeth logo
LONG TERM
Between
20 Feb and 12 Jun 2024
Details
View Map
Share
Follow
Rosendale Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rosendale Road, West Dulwich, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 22 Nov 2023 at 16:18.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2024 at 17:00 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 18:00.

UK Power Networks Eastern & London logo
LONG TERM
Until
10 May 2024
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2024 at 17:00 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2024 at 12:41.

UK Power Networks Eastern & London logo
LONG TERM
Until
10 May 2024
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2024 at 17:00 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2024 at 12:41.

London Borough Of Lewisham logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Overdown Road

London Borough Of Lewisham are carrying out Highway improvement works on Overdown Road, Bellingham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 February 2024 at 08:00 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 9 Apr 2024 at 08:47.

London Borough Of Lewisham logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Overdown Road

London Borough Of Lewisham are carrying out Highway improvement works on Overdown Road, Bellingham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 February 2024 at 08:00 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 9 Apr 2024 at 08:53.

Thames Tideway Tunnel logo
LONG TERM
Between
22 Feb and 30 Nov 2024
Details
View Map
Share
Follow
Chelsea Embankment

Thames Tideway Tunnel are proposing to carry out Highway improvement works on Chelsea Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 February 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Tideway Tunnel on 30 Jan 2024 at 09:17.

City Of London Corporation logo
LONG TERM
Until
28 Apr 2024
Details
View Map
Share
Follow
Blackfriars Bridge

City Of London Corporation are carrying out Highway improvement works on Blackfriars Bridge, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 8 Apr 2024 at 10:36.

City Of London Corporation logo
LONG TERM
Until
28 Apr 2024
Details
View Map
Share
Follow
New Bridge Street

City Of London Corporation are carrying out Highway repair and maintenance works on New Bridge Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 8 Apr 2024 at 10:37.

City Of Westminster logo
LONG TERM
Until
22 Nov 2024
Details
View Map
Share
Follow
Mortimer Street

City Of Westminster are carrying out Highway improvement works on Mortimer Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 February 2024 at 12:00 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 4 Mar 2024 at 12:01.

LONG TERM
Between
26 Feb and 26 Apr 2024
Details
View Map
Share
Follow
Great Eastern Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Great Eastern Road, Stratford, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2024 and could run through until 26 April 2024. The works will impact the footway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 7 Feb 2024 at 16:31.

LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Northchurch Road

London Borough Of Islington are carrying out Highway improvement works on Northchurch Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 26 Feb 2024 at 08:36.

LONG TERM
Until
14 Jun 2024
Details
View Map
Share
Follow
Northchurch Road

London Borough Of Islington are carrying out Highway improvement works on Northchurch Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Apr 2024 at 14:31.

LONG TERM
Until
14 Jun 2024
Details
View Map
Share
Follow
Northchurch Road

London Borough Of Islington are carrying out Highway improvement works on Northchurch Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Apr 2024 at 14:39.

London Borough Of Hackney logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Southgate Road

London Borough Of Hackney are carrying out Highway improvement works on Southgate Road, Hackney, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:40 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 26 Feb 2024 at 08:40.

London Borough Of Hackney logo
LONG TERM
Until
14 Jun 2024
Details
View Map
Share
Follow
Southgate Road

London Borough Of Hackney are carrying out Highway improvement works on Southgate Road, Hackney, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:40 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 15 Apr 2024 at 08:45.

LONG TERM
Between
28 Feb and 30 May 2024
Details
View Map
Share
Follow
Clegg Street

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Clegg Street, Plaistow, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Newham on 28 Feb 2024 at 16:06.

Transport for London (TfL) logo
LONG TERM
Between
1 Mar 2024 and 2 Jan 2026
Details
View Map
Share
Follow
Kennington Lane

Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 2 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 26 Feb 2024 at 11:51.

UK Power Networks Eastern & London logo
LONG TERM
Until
5 Aug 2024
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 13:00 and could run through until 5 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 13:43.

Transport for London (TfL) logo
LONG TERM
Between
1 Mar and 1 May 2024
Details
View Map
Share
Follow
Bow Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bow Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2023 at 11:05.

Transport for London (TfL) logo
LONG TERM
Until
1 May 2024
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 08:00 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2024 at 12:58.

Transport for London (TfL) logo
LONG TERM
Between
1 Mar and 1 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2023 at 11:31.

Transport for London (TfL) logo
LONG TERM
Between
1 Mar and 1 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 10 Oct 2023 at 11:39.

Transport for London (TfL) logo
LONG TERM
Until
1 May 2024
Details
View Map
Share
Follow
High Street

Transport for London (TfL) are carrying out Highway repair and maintenance works on High Street, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2024 at 08:00 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Mar 2024 at 12:57.

Network Rail logo
LONG TERM
Until
31 May 2024
Details
View Map
Share
Follow
Sheepcote Lane

Network Rail are carrying out Works for Rail Purposes on Sheepcote Lane, Battersea, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:33 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Mar 2024 at 08:24.

Transport for London (TfL) logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Neathouse Place

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Neathouse Place, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2024 and could run through until 16 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Jan 2024 at 16:30.

Thames Water logo
LONG TERM
Until
14 Jun 2024
Details
View Map
Share
Follow
Wilson Grove

Thames Water are carrying out Disconnection or alteration of supply on Wilson Grove, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2024 at 10:00 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2024 at 11:17.

LONG TERM
Between
4 Mar and 23 Apr 2024
Details
View Map
Share
Follow
Poplar High Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Poplar High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2024 and could run through until 23 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Tower Hamlets on 15 Jan 2024 at 11:11.

Thames Water logo
LONG TERM
Until
4 May 2024
Details
View Map
Share
Follow
Mile End Road

Thames Water are carrying out Utility asset works on Mile End Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 10:00 and could run through until 4 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 10:05.

London Borough Of Hackney logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Gore Road

London Borough Of Hackney are carrying out Highway improvement works on Gore Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 March 2024 at 14:17 and could run through until 17 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 18 Mar 2024 at 13:03.

Network Rail logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Bodney Road

Network Rail are carrying out Works for Rail Purposes on Bodney Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 09:23.

Network Rail logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Downs Park Road

Network Rail are carrying out Works for Rail Purposes on Downs Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 10:30 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 10:47.

City Of Westminster logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Sackville Street

City Of Westminster are carrying out Highway repair and maintenance works on Sackville Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 March 2024 at 09:30 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 7 Mar 2024 at 10:15.

UK Power Networks Eastern & London logo
LONG TERM
Until
30 Aug 2024
Details
View Map
Share
Follow
Lawrie Park Avenue

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lawrie Park Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 10:00 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2024 at 11:07.

UK Power Networks Eastern & London logo
LONG TERM
Until
27 Sep 2024
Details
View Map
Share
Follow
Sydenham Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 10:00 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Mar 2024 at 11:08.

Southern Gas Networks logo
LONG TERM
Between
11 Mar and 19 May 2024
Details
View Map
Share
Follow
Pickwick Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pickwick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 3 Jan 2024 at 08:21.

Thames Water logo
LONG TERM
Until
29 Sep 2024
Details
View Map
Share
Follow
Shakespeare Road

Thames Water are carrying out Utility asset works on Shakespeare Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2024 at 09:20 and could run through until 29 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2024 at 09:24.

Thames Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Surrey Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Surrey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Nov 2023 at 09:02.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Kidbrooke Park Road

UK Power Networks Eastern & London are carrying out New service connection on Kidbrooke Park Road, Kidbrooke.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 08:00 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2024 at 07:31.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Woolacombe Road

UK Power Networks Eastern & London are carrying out New service connection on Woolacombe Road, Kidbrooke.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 08:00 and could run through until 21 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2024 at 12:25.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Woolacombe Road

UK Power Networks Eastern & London are carrying out New service connection on Woolacombe Road, Kidbrooke.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 08:00 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2024 at 16:03.

Thames Water logo
LONG TERM
Until
29 Aug 2024
Details
View Map
Share
Follow
Lynton Road

Thames Water are carrying out Disconnection or alteration of supply on Lynton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 14:00 and could run through until 29 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:02.

Thames Water logo
LONG TERM
Between
11 Mar and 27 May 2024
Details
View Map
Share
Follow
Wilton Road

Thames Water are proposing to carry out Utility asset works on Wilton Road, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Jul 2023 at 12:08.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
11 Mar and 2 May 2024
Details
View Map
Share
Follow
Cadogan Place

Royal Borough Of Kensington And Chelsea are proposing to carry out Utility asset works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 8 Mar 2024 at 15:08.

Thames Water logo
LONG TERM
Between
11 Mar and 22 Jun 2024
Details
View Map
Share
Follow
Dockley Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Dockley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 09:37.

Thames Water logo
LONG TERM
Until
22 Jun 2024
Details
View Map
Share
Follow
Dockley Road

Thames Water are carrying out Disconnection or alteration of supply on Dockley Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 13:00 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 11:51.

Thames Water logo
LONG TERM
Until
2 May 2024
Details
View Map
Share
Follow
Davis Street

Thames Water are carrying out Utility repair and maintenance works on Davis Street, Plaistow, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 18:00 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 08:21.

Thames Water logo
LONG TERM
Until
10 May 2024
Details
View Map
Share
Follow
Macks Road

Thames Water are carrying out Disconnection or alteration of supply on Macks Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 March 2024 at 09:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 08:57.

London Borough Of Lambeth logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Hawarden Grove

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Hawarden Grove, West Dulwich, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 26 Mar 2024 at 11:10.

London Borough Of Lambeth logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Rosendale Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Rosendale Road, West Dulwich, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 17 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 26 Mar 2024 at 11:13.

Transport for London (TfL) logo
LONG TERM
Until
7 May 2024
Details
View Map
Share
Follow
Vauxhall Bridge Road

Transport for London (TfL) are carrying out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2024 at 08:53.

Transport for London (TfL) logo
LONG TERM
Until
7 May 2024
Details
View Map
Share
Follow
Neathouse Place

Transport for London (TfL) are carrying out Highway improvement works on Neathouse Place, Warwick, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 08:00 and could run through until 7 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Mar 2024 at 08:54.

London Borough Of Southwark logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Rowcross Street

London Borough Of Southwark are carrying out Highway improvement works on Rowcross Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2024 at 09:00 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Apr 2024 at 08:04.

UK Power Networks Eastern & London logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Stamford Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Stamford Street, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 March 2024 at 06:00 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Apr 2024 at 13:34.

UK Power Networks Eastern & London logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Hatfields

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Hatfields, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2024 at 07:15 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Apr 2024 at 09:44.

Thames Water logo
LONG TERM
Between
21 Mar and 19 Jul 2024
Details
View Map
Share
Follow
Old Jamaica Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Old Jamaica Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2024 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Aug 2023 at 07:43.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Eltham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Eltham Road, Eltham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 13:45 and could run through until 16 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2024 at 13:49.

London Borough Of Southwark logo
Finishing
Saturday
Details
View Map
Share
Follow
Dalwood Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Dalwood Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 08:00 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 09:12.

London Borough Of Southwark logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Dalwood Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Dalwood Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 08:00 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 15 Apr 2024 at 08:45.

Transport for London (TfL) logo
LONG TERM
Until
30 Aug 2024
Details
View Map
Share
Follow
Blackwall Tunnel Southern Approach

Transport for London (TfL) are carrying out Highway improvement works on Blackwall Tunnel Southern Approach, Greenwich.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 05:00 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 25 Mar 2024 at 16:15.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
New Road

Thames Water are carrying out Utility repair and maintenance works on New Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 09:30 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 15:29.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Newark Street

Thames Water are carrying out Utility repair and maintenance works on Newark Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 09:00 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 15:29.

Finishing
Friday
Details
View Map
Share
Follow
Warton Road

London Borough Of Newham are carrying out Section 50 on Warton Road, Stratford, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 10:00 and could run through until 19 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Newham on 10 Apr 2024 at 08:16.

Thames Water logo
LONG TERM
Between
26 Mar and 2 May 2024
Details
View Map
Share
Follow
Ambrose Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Ambrose Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Aug 2023 at 07:22.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Cleveland Street

Thames Water are carrying out Utility asset works on Cleveland Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 08:00 and could run through until 16 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 13:31.

London Borough Of Camden logo
LONG TERM
Between
26 Mar and 30 Aug 2024
Details
View Map
Share
Follow
Tavistock Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Tavistock Place, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 2 Apr 2024 at 14:19.

London Borough Of Camden logo
LONG TERM
Between
26 Mar and 30 Aug 2024
Details
View Map
Share
Follow
Tavistock Place

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Tavistock Place, King's Cross, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2024 at 08:31.

London Borough Of Camden logo
LONG TERM
Until
5 Sep 2024
Details
View Map
Share
Follow
Tavistock Place

London Borough Of Camden are carrying out Highway repair and maintenance works on Tavistock Place, King's Cross, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 April 2024 at 09:00 and could run through until 5 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 3 Apr 2024 at 10:53.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Commercial Street

Transport for London (TfL) are carrying out Highway improvement works on Commercial Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 22:00 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Apr 2024 at 11:57.

Transport for London (TfL) logo
Today
Details
View Map
Share
Commercial Street

Transport for London (TfL) carried out Highway improvement works on Commercial Street, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 27 Mar 2024 and 16 Apr 2024 and were actually completed between 27 Mar 2024 (22:00) and 16 Apr 2024 (04:00). The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2024 at 07:06.

London Borough Of Southwark logo
LONG TERM
Between
31 Mar and 30 May 2024
Details
View Map
Share
Follow
Penry Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penry Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 12 Apr 2024 at 07:33.

London Borough Of Southwark logo
LONG TERM
Between
31 Mar and 30 May 2024
Details
View Map
Share
Follow
Penry Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penry Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 12 Apr 2024 at 07:33.

London Borough Of Hackney logo
LONG TERM
Between
31 Mar and 29 Aug 2024
Details
View Map
Share
Follow
Marvin Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Marvin Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 6 Dec 2023 at 10:05.

London Borough Of Lewisham logo
Between
1 and 26 Apr 2024
Details
View Map
Share
Follow
Perry Rise

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Perry Rise, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 2 Apr 2024 at 15:30.

London Borough Of Lewisham logo
Until
26 Apr 2024
Details
View Map
Share
Follow
Perry Rise

London Borough Of Lewisham are carrying out Highway repair and maintenance works on Perry Rise, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 April 2024 at 08:45 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 3 Apr 2024 at 08:46.

London Borough Of Southwark logo
LONG TERM
Between
1 Apr 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Borland Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Borland Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 08:18.

London Borough Of Southwark logo
LONG TERM
Between
1 Apr 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Limesford Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Limesford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 08:24.

Thames Water logo
LONG TERM
Between
1 Apr and 13 Jun 2024
Details
View Map
Share
Follow
Keetons Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Keetons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 12:09.

Thames Water logo
LONG TERM
Between
1 Apr and 13 Jun 2024
Details
View Map
Share
Follow
Keetons Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Keetons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 13:53.

Finishing
Saturday
Details
View Map
Share
Follow
Commercial Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Commercial Road, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 2 Apr 2024 at 08:15.

Eunetworks logo
Until
29 Apr 2024
Details
View Map
Share
Follow
Goodge Street

Eunetworks are carrying out Utility asset works on Goodge Street, Bloomsbury, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Eunetworks on 2 Apr 2024 at 07:34.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Bisson Road

Thames Water are carrying out Utility repair and maintenance works on Bisson Road, Stratford, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 09:00 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 15:07.

Thames Water logo
LONG TERM
Between
2 Apr and 7 May 2024
Details
View Map
Share
Follow
Surrey Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Surrey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 7 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Jan 2024 at 11:41.

London Borough Of Southwark logo
LONG TERM
Until
18 May 2024
Details
View Map
Share
Follow
Windsor Walk

London Borough Of Southwark are carrying out Highway repair and maintenance works on Windsor Walk, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 2 Apr 2024 at 08:48.

London Borough Of Southwark logo
Between
2 and 27 Apr 2024
Details
View Map
Share
Follow
Southampton Way

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southampton Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 27 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 18 Dec 2023 at 14:49.

London Borough Of Southwark logo
Finishing
Saturday
Details
View Map
Share
Follow
Fenham Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Fenham Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 2 Apr 2024 at 08:47.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
Brandon Street

UK Power Networks Eastern & London are carrying out New service connection on Brandon Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:39 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2024 at 08:02.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Chester Row

Cadent Gas are carrying out Utility repair and maintenance works on Chester Row, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 11:00 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Apr 2024 at 08:26.

Cadent Gas logo
Until
23 Apr 2024
Details
View Map
Share
Follow
Chester Row

Cadent Gas are carrying out Utility repair and maintenance works on Chester Row, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 11:00 and could run through until 23 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 10:43.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Chester Square

Cadent Gas are carrying out Utility repair and maintenance works on Chester Square, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 11:00 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 8 Apr 2024 at 08:26.

Cadent Gas logo
Until
23 Apr 2024
Details
View Map
Share
Follow
Chester Square

Cadent Gas are carrying out Utility repair and maintenance works on Chester Square, Knightsbridge & Belgravia, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 11:00 and could run through until 23 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 10:41.

London Borough Of Southwark logo
Finishing
Saturday
Details
View Map
Share
Follow
Southwark Park Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 2 Apr 2024 at 08:49.

London Borough Of Southwark logo
Finishing
Saturday
Details
View Map
Share
Follow
Southwark Park Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Apr 2024 at 13:55.

Southern Gas Networks logo
Between
2 and 28 Apr 2024
Details
View Map
Share
Follow
Fair Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fair Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 28 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Apr 2024 at 09:01.

Southern Gas Networks logo
Until
28 Apr 2024
Details
View Map
Share
Follow
Fair Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Fair Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2024 at 07:40 and could run through until 28 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2024 at 08:04.

Cadent Gas logo
LONG TERM
Between
2 Apr and 5 Jun 2024
Details
View Map
Share
Follow
Lever Street

Cadent Gas are proposing to carry out Utility asset works on Lever Street, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Feb 2024 at 12:18.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Eversholt Street

UK Power Networks Eastern & London are carrying out New service connection on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:20 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2024 at 10:38.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Eversholt Street

UK Power Networks Eastern & London are carrying out New service connection on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:20 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Apr 2024 at 08:55.

UK Power Networks Eastern & London logo
Until
23 Apr 2024
Details
View Map
Share
Follow
Eversholt Street

UK Power Networks Eastern & London are carrying out New service connection on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:20 and could run through until 23 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Apr 2024 at 08:54.

Thames Water logo
LONG TERM
Between
3 Apr and 8 May 2024
Details
View Map
Share
Follow
Surrey Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Surrey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 8 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Feb 2024 at 13:41.

Transport for London (TfL) logo
Until
2 May 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are carrying out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2024 at 06:30 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2024 at 11:25.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Apr and 29 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 16 Feb 2024 at 13:42.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2024 at 07:00 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Apr 2024 at 07:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Apr and 29 May 2024
Details
View Map
Share
Follow
Lochnagar Street

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lochnagar Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2024 at 09:04.

UK Power Networks Eastern & London logo
LONG TERM
Until
29 May 2024
Details
View Map
Share
Follow
Lochnagar Street

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lochnagar Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2024 at 07:00 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Apr 2024 at 07:21.

Transport for London (TfL) logo
LONG TERM
Between
4 Apr and 14 Jun 2024
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 09:21.

Transport for London (TfL) logo
LONG TERM
Between
4 Apr and 14 Jun 2024
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are proposing to carry out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 07:47.

Transport for London (TfL) logo
LONG TERM
Until
14 Jun 2024
Details
View Map
Share
Follow
Lower Lea Crossing

Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 April 2024 at 19:00 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 08:51.

UK Power Networks Eastern & London logo
Between
5 and 26 Apr 2024
Details
View Map
Share
Follow
Drummond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Drummond Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 07:57.

Transport for London (TfL) logo
Between
5 Apr and 1 May 2024
Details
View Map
Share
Follow
Millennium Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Millennium Way, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 16:10.

Transport for London (TfL) logo
Until
1 May 2024
Details
View Map
Share
Follow
Millennium Way

Transport for London (TfL) are carrying out Highway improvement works on Millennium Way, Greenwich.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2024 at 22:00 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 08:53.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Newbury Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Newbury Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2024 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 14:01.

UK Power Networks Eastern & London logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Newbury Street

UK Power Networks Eastern & London are carrying out Disconnection or alteration of supply on Newbury Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2024 at 07:00 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Apr 2024 at 08:32.

UK Power Networks Eastern & London logo
Finishing
Saturday
Details
View Map
Share
Follow
Newbury Street

UK Power Networks Eastern & London are carrying out Disconnection or alteration of supply on Newbury Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 April 2024 at 07:00 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2024 at 12:48.

London Borough Of Southwark logo
LONG TERM
Between
7 Apr and 24 May 2024
Details
View Map
Share
Follow
Canada Water Walkway

London Borough Of Southwark are proposing to carry out Highway improvement works on Canada Water Walkway, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 16:30.

London Borough Of Hackney logo
Finishing
Monday
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 22 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 4 Apr 2024 at 13:15.

London Borough Of Hackney logo
Finishing
Monday
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 22 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 4 Apr 2024 at 14:47.

London Borough Of Hackney logo
Finishing
Monday
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are carrying out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2024 at 07:38 and could run through until 22 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 9 Apr 2024 at 07:38.

London Borough Of Hackney logo
Until
25 Apr 2024
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are carrying out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2024 at 07:38 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Apr 2024 at 09:35.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Apr and 31 May 2024
Details
View Map
Share
Follow
Portland Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Portland Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 11:46.

Thames Water logo
LONG TERM
Between
8 Apr and 18 Jun 2024
Details
View Map
Share
Follow
Alexis Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Alexis Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:22.

Thames Water logo
LONG TERM
Between
8 Apr and 18 Jun 2024
Details
View Map
Share
Follow
Alexis Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Alexis Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 08:02.

Thames Water logo
LONG TERM
Between
8 Apr and 18 Jun 2024
Details
View Map
Share
Follow
Alexis Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Alexis Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 10:06.

Thames Water logo
LONG TERM
Until
18 Jun 2024
Details
View Map
Share
Follow
Alexis Street

Thames Water are carrying out Disconnection or alteration of supply on Alexis Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 10:00 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 08:41.

Thames Water logo
LONG TERM
Between
8 Apr and 14 May 2024
Details
View Map
Share
Follow
Enid Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Enid Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:16.

Thames Water logo
LONG TERM
Between
8 Apr and 14 May 2024
Details
View Map
Share
Follow
Enid Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Enid Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 07:10.

Thames Water logo
LONG TERM
Between
8 Apr and 14 May 2024
Details
View Map
Share
Follow
Enid Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Enid Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 10:06.

Thames Water logo
LONG TERM
Until
14 May 2024
Details
View Map
Share
Follow
Enid Street

Thames Water are carrying out Disconnection or alteration of supply on Enid Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 10:30 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 08:41.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Follow
Redcross Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Mar 2024 at 17:34.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Follow
Redcross Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Apr 2024 at 12:19.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Follow
Redcross Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2024 at 12:00.

UK Power Networks Eastern & London logo
Finishing
Sunday
Details
View Map
Share
Follow
Redcross Way

UK Power Networks Eastern & London are carrying out New service connection on Redcross Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 10:18 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2024 at 10:18.

Cadent Gas logo
LONG TERM
Between
8 Apr and 31 Jul 2024
Details
View Map
Share
Follow
Tudor Street

Cadent Gas are proposing to carry out Utility asset works on Tudor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 31 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 08:23.

Transport for London (TfL) logo
LONG TERM
Between
8 Apr and 20 May 2024
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 13:38.

Transport for London (TfL) logo
LONG TERM
Between
8 Apr and 20 May 2024
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 14:32.

Transport for London (TfL) logo
LONG TERM
Until
20 May 2024
Details
View Map
Share
Follow
Gracechurch Street

Transport for London (TfL) are carrying out Highway improvement works on Gracechurch Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 07:00 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 08:29.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Pomell Way

Transport for London (TfL) are carrying out Highway improvement works on Pomell Way, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 21:00 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2024 at 09:54.

Transport for London (TfL) logo
Today
Details
View Map
Share
Pomell Way

Transport for London (TfL) carried out Highway improvement works on Pomell Way, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 8 Apr 2024 and 16 Apr 2024 and were actually completed between 8 Apr 2024 (21:00) and 16 Apr 2024 (04:00). The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2024 at 07:11.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Wentworth Street

Transport for London (TfL) are carrying out Highway improvement works on Wentworth Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 21:00 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2024 at 09:53.

Transport for London (TfL) logo
Today
Details
View Map
Share
Wentworth Street

Transport for London (TfL) carried out Highway improvement works on Wentworth Street, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 8 Apr 2024 and 16 Apr 2024 and were actually completed between 8 Apr 2024 (21:00) and 16 Apr 2024 (04:00). The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2024 at 07:10.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Thrawl Street

Transport for London (TfL) are carrying out Highway improvement works on Thrawl Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 21:00 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2024 at 09:52.

Transport for London (TfL) logo
Today
Details
View Map
Share
Thrawl Street

Transport for London (TfL) carried out Highway improvement works on Thrawl Street, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 8 Apr 2024 and 16 Apr 2024 and were actually completed between 8 Apr 2024 (21:00) and 16 Apr 2024 (04:00). The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2024 at 07:09.

Transport for London (TfL) logo
Finishing
Today
Details
View Map
Share
Follow
Lolesworth Close

Transport for London (TfL) are carrying out Highway improvement works on Lolesworth Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 21:00 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2024 at 09:50.

Transport for London (TfL) logo
Today
Details
View Map
Share
Lolesworth Close

Transport for London (TfL) carried out Highway improvement works on Lolesworth Close, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 8 Apr 2024 and 16 Apr 2024 and were actually completed between 8 Apr 2024 (21:00) and 16 Apr 2024 (04:00). The works impacted the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Apr 2024 at 07:08.

UK Power Networks Eastern & London logo
Finishing
Thursday
Details
View Map
Share
Follow
King's Cross Road

UK Power Networks Eastern & London are carrying out New service connection on King's Cross Road, King's Cross, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 08:00 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2024 at 09:38.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Lorenzo Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Lorenzo Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 16 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Jan 2024 at 07:30.

UK Power Networks Eastern & London logo
Finishing
Today
Details
View Map
Share
Follow
Lorenzo Street

UK Power Networks Eastern & London are carrying out New service connection on Lorenzo Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 07:39 and could run through until 16 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2024 at 07:39.

HS2 logo
LONG TERM
Between
8 Apr and 28 Jun 2024
Details
View Map
Share
Follow
Park Village East

HS2 are proposing to carry out Works for Rail Purposes on Park Village East, Regent's Park, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 8 Apr 2024 at 08:37.

HS2 logo
LONG TERM
Until
28 Jun 2024
Details
View Map
Share
Follow
Park Village East

HS2 are carrying out Works for Rail Purposes on Park Village East, Regent's Park, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 07:30 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by HS2 on 8 Apr 2024 at 08:38.

London Borough Of Hackney logo
LONG TERM
Between
8 Apr and 24 Sep 2024
Details
View Map
Share
Follow
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 24 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Jan 2024 at 09:35.

London Borough Of Hackney logo
LONG TERM
Between
9 Apr and 25 Sep 2024
Details
View Map
Share
Follow
Whiston Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 11:55.

London Borough Of Hackney logo
LONG TERM
Between
9 Apr and 25 Sep 2024
Details
View Map
Share
Follow
Laburnum Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Laburnum Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 14:09.

London Borough Of Hackney logo
LONG TERM
Between
9 Apr and 25 Sep 2024
Details
View Map
Share
Follow
Albion Drive

London Borough Of Hackney are proposing to carry out Highway improvement works on Albion Drive, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2024 and could run through until 25 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 12 Feb 2024 at 10:55.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Woolwich Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Woolwich Road, Greenwich.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2024 at 10:10 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2024 at 10:41.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Woolwich Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Woolwich Road, Greenwich.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2024 at 10:10 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Apr 2024 at 10:44.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Woolwich Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Woolwich Road, Greenwich.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2024 at 10:10 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2024 at 05:21.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 5 Jun 2024
Details
View Map
Share
Follow
Grosvenor Place

Transport for London (TfL) are proposing to carry out roadworks on Grosvenor Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 10 April 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 10:06.

Transport for London (TfL) logo
LONG TERM
Between
10 Apr and 5 Jun 2024
Details
View Map
Share
Follow
Grosvenor Place

Transport for London (TfL) are proposing to carry out roadworks on Grosvenor Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 10 April 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 13:04.

City Of Westminster logo
Between
10 and 30 Apr 2024
Details
View Map
Share
Follow
St George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on St George Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 3 Apr 2024 at 15:42.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Acre Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 09:00 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2024 at 09:44.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Acre Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 09:00 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2024 at 10:19.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Acre Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 09:00 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2024 at 10:20.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Acre Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Acre Lane, Brixton Acre Lane, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 09:00 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2024 at 13:49.

Transport for London (TfL) logo
Between
11 Apr and 10 May 2024
Details
View Map
Share
Follow
Moat Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Moat Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Feb 2024 at 16:30.

Transport for London (TfL) logo
Between
11 Apr and 10 May 2024
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Jan 2024 at 14:57.

Transport for London (TfL) logo
Between
11 Apr and 10 May 2024
Details
View Map
Share
Follow
New Mill Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Mill Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Feb 2024 at 16:30.

Transport for London (TfL) logo
Between
11 Apr and 10 May 2024
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 19 Jan 2024 at 15:15.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Vauxhall Bridge Road

Thames Water are carrying out Utility repair and maintenance works on Vauxhall Bridge Road, Tachbrook, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 07:24 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 07:25.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Vauxhall Bridge Road

Thames Water are carrying out Utility repair and maintenance works on Vauxhall Bridge Road, Tachbrook, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 07:24 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 14:12.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Phoenix Avenue

Thames Water are carrying out Utility repair and maintenance works on Phoenix Avenue, Greenwich.

The works started on 11 April 2024 at 08:12 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 08:13.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Phoenix Avenue

Thames Water are carrying out Utility repair and maintenance works on Phoenix Avenue, Greenwich.

The works started on 11 April 2024 at 08:12 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 15:30.

City Of London Corporation logo
Finishing
Friday
Details
View Map
Share
Follow
Garlick Hill

City Of London Corporation are carrying out Highway repair and maintenance works on Garlick Hill, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 09:34 and could run through until 19 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2024 at 09:34.

City Of London Corporation logo
Finishing
Friday
Details
View Map
Share
Follow
Garlick Hill

City Of London Corporation are carrying out Highway repair and maintenance works on Garlick Hill, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 09:34 and could run through until 19 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 11 Apr 2024 at 10:42.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Stepney Way

Cadent Gas are carrying out Utility repair and maintenance works on Stepney Way, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 13:58 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 16:22.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Stepney Way

Cadent Gas are carrying out Utility repair and maintenance works on Stepney Way, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 13:58 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 11:57.

UK Power Networks Eastern & London logo
LONG TERM
Between
12 Apr and 30 Aug 2024
Details
View Map
Share
Follow
Galleywall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Galleywall Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 16:30.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Southwark Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Southwark Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2024 at 06:17 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Apr 2024 at 06:53.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Southwark Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Southwark Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2024 at 06:17 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 12 Apr 2024 at 13:29.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Berwick Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Berwick Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 April 2024 at 15:37 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2024 at 21:52.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Berwick Street

UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Berwick Street, West End, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 April 2024 at 15:37 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2024 at 07:38.

Finishing
Saturday
Details
View Map
Share
Follow
Brushfield Street

London Borough Of Tower Hamlets are proposing to carry out Highway repair and maintenance works on Brushfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 13 Mar 2024 at 16:26.

Finishing
Saturday
Details
View Map
Share
Follow
Brushfield Street

London Borough Of Tower Hamlets are carrying out Highway repair and maintenance works on Brushfield Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 April 2024 at 07:00 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 15 Apr 2024 at 07:21.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Brockman Rise

Thames Water are proposing to carry out Utility repair and maintenance works on Brockman Rise, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Mar 2024 at 14:27.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Brockman Rise

Thames Water are carrying out Utility repair and maintenance works on Brockman Rise, Bromley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:36 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 07:36.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Brockman Rise

Thames Water are carrying out Utility repair and maintenance works on Brockman Rise, Bromley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:36 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 14:32.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 23 May 2024
Details
View Map
Share
Follow
Buckden Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckden Close, London.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 14 April 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2024 at 07:11.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 23 May 2024
Details
View Map
Share
Follow
Buckden Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckden Close, London.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 14 April 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Apr 2024 at 07:39.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 30 May 2024
Details
View Map
Share
Follow
Alanthus Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alanthus Close, London.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 14 April 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Apr 2024 at 14:34.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 30 May 2024
Details
View Map
Share
Follow
Alanthus Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alanthus Close, London.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 14 April 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Apr 2024 at 14:41.

Southern Gas Networks logo
LONG TERM
Until
2 Jun 2024
Details
View Map
Share
Follow
Alanthus Close

Southern Gas Networks are carrying out Utility repair and maintenance works on Alanthus Close, London.

These works are categorised as Major.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 16 April 2024 at 08:00 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Apr 2024 at 08:48.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
St Aidans Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Aidans Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:26.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
St Aidans Road

Thames Water are carrying out Utility repair and maintenance works on St Aidans Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:48 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:34.

Thames Water logo
LONG TERM
Between
14 Apr and 17 May 2024
Details
View Map
Share
Follow
Crimsworth Road

Thames Water are proposing to carry out Utility asset works on Crimsworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 12:42.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Chichester Street

Thames Water are proposing to carry out New service connection on Chichester Street, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Mar 2024 at 09:04.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Chichester Street

Thames Water are carrying out New service connection on Chichester Street, Tachbrook, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 10:41 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 10:51.

London Borough Of Southwark logo
Finishing
Monday
Details
View Map
Share
Follow
Surrey Quays Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Surrey Quays Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 13:51.

London Borough Of Southwark logo
Finishing
Monday
Details
View Map
Share
Follow
Redriff Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Redriff Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:04.

London Borough Of Southwark logo
Finishing
Monday
Details
View Map
Share
Follow
Canada Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Canada Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:03.

London Borough Of Southwark logo
Finishing
Monday
Details
View Map
Share
Follow
Lower Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Lower Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:10.

London Borough Of Southwark logo
Finishing
Monday
Details
View Map
Share
Follow
Quebec Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Quebec Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 13:51.

London Borough Of Southwark logo
Finishing
Monday
Details
View Map
Share
Follow
Rotherhithe Street

London Borough Of Southwark are proposing to carry out Remedial works on Rotherhithe Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:03.

London Borough Of Southwark logo
Finishing
Monday
Details
View Map
Share
Follow
Salter Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Salter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 13:57.

London Borough Of Southwark logo
Finishing
Monday
Details
View Map
Share
Follow
Brunel Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Brunel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Dec 2023 at 14:04.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Cut

Thames Water are proposing to carry out New service connection on The Cut, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 17 April 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 09:57.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
The Cut

Thames Water are proposing to carry out New service connection on The Cut, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 17 April 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 13:45.

Transport for London (TfL) logo
LONG TERM
Between
14 Apr and 9 Jun 2024
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out roadworks on Borough High Street, London.

These works are categorised as Major.

The works will start on or after 14 April 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2024 at 10:22.

Transport for London (TfL) logo
LONG TERM
Between
14 Apr and 9 Jun 2024
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out roadworks on Borough High Street, London.

These works are categorised as Major.

The works will start on or after 14 April 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 10 Apr 2024 at 12:22.

Transport for London (TfL) logo
LONG TERM
Between
14 Apr and 9 Jun 2024
Details
View Map
Share
Follow
Borough High Street

Transport for London (TfL) are proposing to carry out roadworks on Borough High Street, London.

These works are categorised as Major.

The works will start on or after 14 April 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2024 at 12:03.

London Borough Of Southwark logo
Finishing
Thursday
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are carrying out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:53 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 15 Apr 2024 at 07:58.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Follow
Great Suffolk Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Great Suffolk Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.

London Borough Of Southwark logo
Finishing
Today
Details
View Map
Share
Follow
Great Suffolk Street

London Borough Of Southwark are carrying out Highway improvement works on Great Suffolk Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:54 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 15 Apr 2024 at 07:58.

Vodafone logo
Finishing
Today
Details
View Map
Share
Follow
Berkeley Street

Vodafone are proposing to carry out Utility asset works on Berkeley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 15 Apr 2024 at 07:38.

Vodafone logo
Finishing
Today
Details
View Map
Share
Follow
Berkeley Street

Vodafone are proposing to carry out Utility asset works on Berkeley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 15 Apr 2024 at 10:16.

Vodafone logo
Finishing
Today
Details
View Map
Share
Follow
Berkeley Street

Vodafone are carrying out Utility asset works on Berkeley Street, West End, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:00 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 15 Apr 2024 at 12:41.

Vodafone logo
Finishing
Today
Details
View Map
Share
Follow
Strand

Vodafone are proposing to carry out Utility asset works on Strand, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 Jan 2024 at 07:52.

Vodafone logo
Finishing
Today
Details
View Map
Share
Follow
Strand

Vodafone are carrying out Utility asset works on Strand, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 21:00 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 16 Apr 2024 at 06:18.

Vodafone logo
Today
Details
View Map
Share
Strand

Vodafone carried out Utility asset works on Strand, St James's, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 14 Apr 2024 and 16 Apr 2024 and were actually completed between 15 Apr 2024 (21:00) and 16 Apr 2024 (04:00). The works impacted the carriageway only.

This roadwork event was last updated by Vodafone on 16 Apr 2024 at 08:21.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Mincing Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Mincing Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 08:24.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Mincing Lane

Thames Water are carrying out Disconnection or alteration of supply on Mincing Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 08:03 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 09:57.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Hessel Street

Cadent Gas are proposing to carry out New service connection on Hessel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 00:10.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Hessel Street

Cadent Gas are proposing to carry out New service connection on Hessel Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 10:25.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Hessel Street

Cadent Gas are carrying out New service connection on Hessel Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 08:37 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 08:38.

Finishing
Thursday
Details
View Map
Share
Follow
Carr Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Carr Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 2 Apr 2024 at 09:08.

Finishing
Sunday
Details
View Map
Share
Follow
Carr Street

London Borough Of Tower Hamlets are carrying out Highway improvement works on Carr Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2024 at 08:30 and could run through until 21 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 16 Apr 2024 at 09:15.

Thames Water logo
Between
14 Apr and 12 May 2024
Details
View Map
Share
Follow
Cabot Way

Thames Water are proposing to carry out Utility asset works on Cabot Way, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 09:32.

Thames Water logo
Between
14 Apr and 12 May 2024
Details
View Map
Share
Follow
Cabot Way

Thames Water are proposing to carry out Utility asset works on Cabot Way, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 10:47.

Thames Water logo
Until
12 May 2024
Details
View Map
Share
Follow
Cabot Way

Thames Water are carrying out Utility asset works on Cabot Way, East Ham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 08:30 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:53.

Between
15 Apr and 10 May 2024
Details
View Map
Share
Follow
Bell Green

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Bell Green, London.

These works are categorised as Major.

The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 27 Mar 2024 at 16:33.

Between
15 Apr and 10 May 2024
Details
View Map
Share
Follow
Bell Green

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Bell Green, London.

These works are categorised as Major.

The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 5 Apr 2024 at 08:23.

Between
15 Apr and 10 May 2024
Details
View Map
Share
Follow
Bell Green

Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Bell Green, London.

These works are categorised as Major.

The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 5 Apr 2024 at 14:20.

Until
10 May 2024
Details
View Map
Share
Follow
Bell Green

Stark Infra – Electric are carrying out Statutory Infrastructure Works on Bell Green, London.

These works are categorised as Major.

The works started on 15 April 2024 at 07:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Stark Infra – Electric on 15 Apr 2024 at 08:35.

Thames Water logo
Until
25 Apr 2024
Details
View Map
Share
Follow
Brixton Hill

Thames Water are carrying out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

The works started on 15 April 2024 at 10:30 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 11:13.

Thames Water logo
Until
25 Apr 2024
Details
View Map
Share
Follow
Brixton Hill

Thames Water are carrying out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

The works started on 15 April 2024 at 10:30 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 11:39.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Eltham Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Eltham Road, Eltham.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 23:12 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2024 at 23:15.

Thames Water logo
LONG TERM
Between
15 Apr 2024 and 2 May 2025
Details
View Map
Share
Follow
Wiltshire Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Wiltshire Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 12:24.

Thames Water logo
LONG TERM
Between
15 Apr 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Western Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Western Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 12:27.

London Borough Of Southwark logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Benhill Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Benhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 17 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 28 Mar 2024 at 16:05.

London Borough Of Southwark logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Benhill Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Benhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 17 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 8 Apr 2024 at 11:51.

London Borough Of Southwark logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Benhill Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Benhill Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:00 and could run through until 17 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Apr 2024 at 08:40.

Thames Water logo
LONG TERM
Between
15 Apr 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Monnow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Monnow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2023 at 13:34.

Vodafone logo
Finishing
Friday
Details
View Map
Share
Follow
Thermopylae Gate

Vodafone are proposing to carry out Utility asset works on Thermopylae Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 27 Mar 2024 at 14:03.

Vodafone logo
Finishing
Friday
Details
View Map
Share
Follow
Thermopylae Gate

Vodafone are carrying out Utility asset works on Thermopylae Gate, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 08:30 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 15 Apr 2024 at 08:50.

Between
15 Apr and 7 May 2024
Details
View Map
Share
Follow
Drummond Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Drummond Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Apr 2024 at 14:43.

London Borough Of Southwark logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ewer Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Ewer Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 17 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:02.

London Borough Of Southwark logo
Finishing
Thursday
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2024 at 20:03.

UK Power Networks Eastern & London logo
Between
15 Apr and 11 May 2024
Details
View Map
Share
Follow
Fenchurch Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Fenchurch Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 08:15.

Transport for London (TfL) logo
Between
15 Apr and 10 May 2024
Details
View Map
Share
Follow
Denmark Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Denmark Street, Holborn And Covent Garden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jan 2024 at 14:17.

Transport for London (TfL) logo
Until
10 May 2024
Details
View Map
Share
Follow
Denmark Street

Transport for London (TfL) are carrying out Highway improvement works on Denmark Street, Holborn And Covent Garden, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:01 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2024 at 12:17.

Transport for London (TfL) logo
Between
15 Apr and 10 May 2024
Details
View Map
Share
Follow
Charing Cross Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Charing Cross Road, Holborn And Covent Garden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Jan 2024 at 14:18.

Transport for London (TfL) logo
Until
10 May 2024
Details
View Map
Share
Follow
Charing Cross Road

Transport for London (TfL) are carrying out Highway improvement works on Charing Cross Road, Holborn And Covent Garden, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:01 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2024 at 12:17.

City Of London Corporation logo
Finishing
Today
Details
View Map
Share
Follow
London Wall

City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 06:12 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 15 Apr 2024 at 06:13.

City Of London Corporation logo
Finishing
Today
Details
View Map
Share
Follow
London Wall

City Of London Corporation are carrying out Highway repair and maintenance works on London Wall, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 06:12 and could run through until 16 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 15 Apr 2024 at 14:29.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Blomfield Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Blomfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Jan 2024 at 16:47.

UK Power Networks Eastern & London logo
Between
15 and 26 Apr 2024
Details
View Map
Share
Follow
Devonshire Close

UK Power Networks Eastern & London are proposing to carry out New service connection on Devonshire Close, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Mar 2024 at 17:46.

UK Power Networks Eastern & London logo
Until
26 Apr 2024
Details
View Map
Share
Follow
Devonshire Close

UK Power Networks Eastern & London are carrying out New service connection on Devonshire Close, Marylebone High Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:54 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2024 at 07:54.

UK Power Networks Eastern & London logo
Between
15 Apr and 11 May 2024
Details
View Map
Share
Follow
Clerkenwell Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Clerkenwell Road, Holborn And Covent Garden, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 18:30.

Between
15 and 26 Apr 2024
Details
View Map
Share
Follow
Cooks Road

London Borough Of Newham are proposing to carry out Section 50 on Cooks Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 11 Apr 2024 at 15:53.

Between
15 and 26 Apr 2024
Details
View Map
Share
Follow
Cooks Road

London Borough Of Newham are proposing to carry out Section 50 on Cooks Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Newham on 12 Apr 2024 at 09:06.

Thames Water logo
LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Mildmay Grove South

Thames Water are carrying out Utility repair and maintenance works on Mildmay Grove South, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:00 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 09:12.

Thames Water logo
LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Mildmay Grove South

Thames Water are carrying out Utility repair and maintenance works on Mildmay Grove South, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:00 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 11:34.

London Borough Of Lambeth logo
Finishing
Saturday
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 4 Apr 2024 at 12:52.

London Borough Of Lambeth logo
Finishing
Saturday
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 4 Apr 2024 at 13:01.

London Borough Of Lambeth logo
Finishing
Saturday
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 27 Mar 2024 at 12:29.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Coleraine Road

Thames Water are proposing to carry out Utility repair and maintenance works on Coleraine Road, Blackheath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 22 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:21.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
St James's Square

BT are proposing to carry out Utility asset works on St James's Square, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Mar 2024 at 10:06.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
St James's Square

BT are carrying out Utility asset works on St James's Square, St James's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2024 at 09:11 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Apr 2024 at 09:11.

City Of Westminster logo
Finishing
Monday
Details
View Map
Share
Follow
Conduit Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Conduit Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Jan 2024 at 15:29.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Cursitor Street

BT are proposing to carry out Utility repair and maintenance works on Cursitor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Apr 2024 at 09:15.

Hyperoptic logo
Finishing
Thursday
Details
View Map
Share
Follow
Compton Avenue

Hyperoptic are proposing to carry out Utility asset works on Compton Avenue, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 27 Feb 2024 at 14:29.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Lea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 14:41.

Transport for London (TfL) logo
Finishing
Thursday
Details
View Map
Share
Follow
Lea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2024 at 10:52.

London Borough Of Southwark logo
Finishing
Saturday
Details
View Map
Share
Follow
Owgan Close

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Owgan Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 8 Dec 2023 at 11:26.

London Borough Of Southwark logo
Finishing
Saturday
Details
View Map
Share
Follow
Benhill Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Benhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 4 Apr 2024 at 16:03.

London Borough Of Southwark logo
Finishing
Saturday
Details
View Map
Share
Follow
Benhill Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Benhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Apr 2024 at 12:06.

London Borough Of Southwark logo
Finishing
Saturday
Details
View Map
Share
Follow
Benhill Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Benhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 06:07.

UK Power Networks Eastern & London logo
Between
18 Apr and 11 May 2024
Details
View Map
Share
Follow
Browning Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Browning Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 11:39.

Between
18 and 24 Apr 2024
Details
View Map
Share
Follow
Lanrick Road

Nextgenaccess are proposing to carry out Utility asset works on Lanrick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 24 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nextgenaccess on 4 Apr 2024 at 10:42.

Between
18 and 24 Apr 2024
Details
View Map
Share
Follow
Lanrick Road

Nextgenaccess are proposing to carry out Utility asset works on Lanrick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 24 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nextgenaccess on 4 Apr 2024 at 11:36.

Cadent Gas logo
Finishing
Saturday
Details
View Map
Share
Follow
Cowcross Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Apr 2024 at 12:12.

Cadent Gas logo
Finishing
Saturday
Details
View Map
Share
Follow
Cowcross Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Cowcross Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Apr 2024 at 07:04.

London Borough Of Southwark logo
Finishing
Sunday
Details
View Map
Share
Follow
Commercial Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Commercial Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 21 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 12:53.

Thames Water logo
LONG TERM
Between
19 Apr and 30 May 2024
Details
View Map
Share
Follow
Sugar Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Sugar Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jun 2023 at 13:49.

Boldyn Networks logo
LONG TERM
Between
19 Apr and 6 Jun 2024
Details
View Map
Share
Follow
Stephenson Street

Boldyn Networks are proposing to carry out Utility asset works on Stephenson Street, Canning Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 April 2024 and could run through until 6 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Boldyn Networks on 15 Apr 2024 at 14:40.

Thames Water logo
Between
21 Apr and 8 May 2024
Details
View Map
Share
Follow
Inverton Road

Thames Water are proposing to carry out Utility asset works on Inverton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 8 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 07:16.

Thames Water logo
Between
21 Apr and 8 May 2024
Details
View Map
Share
Follow
Inverton Road

Thames Water are proposing to carry out Utility asset works on Inverton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 8 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 12:54.

Thames Water logo
Between
21 Apr and 8 May 2024
Details
View Map
Share
Follow
Limesford Road

Thames Water are proposing to carry out Utility asset works on Limesford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 8 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 07:14.

Thames Water logo
Between
21 Apr and 8 May 2024
Details
View Map
Share
Follow
Limesford Road

Thames Water are proposing to carry out Utility asset works on Limesford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 8 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 12:54.

Thames Water logo
Between
21 Apr and 8 May 2024
Details
View Map
Share
Follow
Borland Road

Thames Water are proposing to carry out Utility asset works on Borland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 8 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 07:13.

Thames Water logo
Between
21 Apr and 8 May 2024
Details
View Map
Share
Follow
Borland Road

Thames Water are proposing to carry out Utility asset works on Borland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 8 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 12:54.

Thames Water logo
Between
21 and 25 Apr 2024
Details
View Map
Share
Follow
Ebury Street

Thames Water are proposing to carry out New service connection on Ebury Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 13:22.

Thames Water logo
Between
21 and 25 Apr 2024
Details
View Map
Share
Follow
Ebury Street

Thames Water are proposing to carry out New service connection on Ebury Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 08:13.

Between
21 and 23 Apr 2024
Details
View Map
Share
Follow
Palmer Street

G. Network Communications are proposing to carry out Utility asset works on Palmer Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 23 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 14 Mar 2024 at 06:24.

Thames Water logo
Between
21 and 25 Apr 2024
Details
View Map
Share
Follow
Fitzmaurice Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Fitzmaurice Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:17.

Thames Water logo
Between
21 and 24 Apr 2024
Details
View Map
Share
Follow
Grafton Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Grafton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 24 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:38.

Thames Water logo
Between
21 and 24 Apr 2024
Details
View Map
Share
Follow
Grafton Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Grafton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 24 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 05:33.

Thames Water logo
Between
21 and 24 Apr 2024
Details
View Map
Share
Follow
Grafton Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Grafton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 24 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 07:02.

Cadent Gas logo
Between
21 and 25 Apr 2024
Details
View Map
Share
Follow
Green Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Green Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 4 Apr 2024 at 23:10.

Thames Water logo
Between
21 and 29 Apr 2024
Details
View Map
Share
Follow
Poppins Court

Thames Water are proposing to carry out Disconnection or alteration of supply on Poppins Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 07:16.

Thames Water logo
Between
21 and 29 Apr 2024
Details
View Map
Share
Follow
Poppins Court

Thames Water are proposing to carry out Disconnection or alteration of supply on Poppins Court, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 09:45.

Thames Water logo
Between
21 and 25 Apr 2024
Details
View Map
Share
Follow
Neal Street

Thames Water are proposing to carry out Utility asset works on Neal Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Feb 2024 at 17:06.

Thames Water logo
Between
21 and 24 Apr 2024
Details
View Map
Share
Follow
Forty Acre Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Forty Acre Lane, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 16:01.

Vodafone logo
Between
21 Apr and 2 May 2024
Details
View Map
Share
Follow
Adler Street

Vodafone are proposing to carry out Utility asset works on Adler Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 13 Mar 2024 at 14:10.

LONG TERM
Between
21 Apr and 13 Jun 2024
Details
View Map
Share
Follow
Green Street

London Borough Of Newham are proposing to carry out Highway improvement works on Green Street, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 27 Mar 2024 at 07:35.

LONG TERM
Between
21 Apr and 13 Jun 2024
Details
View Map
Share
Follow
Green Street

London Borough Of Newham are proposing to carry out Highway improvement works on Green Street, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 5 Apr 2024 at 11:30.

Thames Water logo
Between
22 and 24 Apr 2024
Details
View Map
Share
Follow
Oldstead Road

Thames Water are proposing to carry out Utility repair and maintenance works on Oldstead Road, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Feb 2024 at 10:06.

London Borough Of Lambeth logo
Between
22 and 24 Apr 2024
Details
View Map
Share
Follow
Railton Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Railton Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 4 Apr 2024 at 12:33.

London Borough Of Lambeth logo
Between
22 and 24 Apr 2024
Details
View Map
Share
Follow
Railton Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Railton Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 11 Apr 2024 at 06:00.

London Borough Of Lambeth logo
LONG TERM
Between
22 Apr and 28 Jun 2024
Details
View Map
Share
Follow
Windmill Drive

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Windmill Drive, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 9 Apr 2024 at 10:50.

London Borough Of Lambeth logo
LONG TERM
Between
22 Apr and 28 Jun 2024
Details
View Map
Share
Follow
Windmill Drive

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Windmill Drive, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 9 Apr 2024 at 12:09.

Thames Water logo
Between
22 Apr and 9 May 2024
Details
View Map
Share
Follow
Inverton Road

Thames Water are proposing to carry out Utility asset works on Inverton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 09:06.

Thames Water logo
Between
22 Apr and 9 May 2024
Details
View Map
Share
Follow
Limesford Road

Thames Water are proposing to carry out Utility asset works on Limesford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 09:05.

Thames Water logo
Between
22 Apr and 9 May 2024
Details
View Map
Share
Follow
Borland Road

Thames Water are proposing to carry out Utility asset works on Borland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 09:09.

London Borough Of Southwark logo
Between
22 and 27 Apr 2024
Details
View Map
Share
Follow
Ruby Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Ruby Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 1 Feb 2024 at 14:51.

Electricity Network Company logo
Between
22 Apr and 3 May 2024
Details
View Map
Share
Follow
Carnation Way

Electricity Network Company are proposing to carry out Utility asset works on Carnation Way, London.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 23 Jan 2024 at 16:30.

UK Power Networks Eastern & London logo
Between
22 and 24 Apr 2024
Details
View Map
Share
Follow
Gallions Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Gallions Road, Charlton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Mar 2024 at 09:45.

Royal Borough Of Greenwich logo
Between
22 Apr and 13 May 2024
Details
View Map
Share
Follow
Bellot Street

Royal Borough Of Greenwich are proposing to carry out Highway repair and maintenance works on Bellot Street, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 22 Mar 2024 at 12:23.

City Of Westminster logo
Between
22 and 30 Apr 2024
Details
View Map
Share
Follow
Broadway

City Of Westminster are proposing to carry out Highway improvement works on Broadway, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 30 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 11 Apr 2024 at 14:58.

City Of Westminster logo
Between
22 and 30 Apr 2024
Details
View Map
Share
Follow
Broadway

City Of Westminster are proposing to carry out Highway improvement works on Broadway, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 30 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 12 Apr 2024 at 09:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
22 Apr and 31 May 2024
Details
View Map
Share
Follow
Timber Pond Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Timber Pond Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Feb 2024 at 12:28.

City Of Westminster logo
Between
22 Apr and 3 May 2024
Details
View Map
Share
Follow
St George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on St George Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 4 Apr 2024 at 13:02.

City Of Westminster logo
Between
22 Apr and 3 May 2024
Details
View Map
Share
Follow
St George Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on St George Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Apr 2024 at 10:10.

City Of London Corporation logo
Between
22 Apr and 12 May 2024
Details
View Map
Share
Follow
Queen Victoria Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Queen Victoria Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 1 Apr 2024 at 08:31.

UK Power Networks Eastern & London logo
Between
22 Apr and 12 May 2024
Details
View Map
Share
Follow
Fords Park Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Fords Park Road, Canning Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 11:27.

Thames Water logo
Between
22 and 25 Apr 2024
Details
View Map
Share
Follow
Coptic Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Coptic Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 10:57.

Thames Water logo
Between
22 and 25 Apr 2024
Details
View Map
Share
Follow
Coptic Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Coptic Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 13:47.

City Of Westminster logo
LONG TERM
Between
22 Apr and 2 Aug 2024
Details
View Map
Share
Follow
Great Portland Street

City Of Westminster are proposing to carry out Highway improvement works on Great Portland Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 2 August 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 08:34.

Between
22 Apr and 3 May 2024
Details
View Map
Share
Follow
Albion Road

G. Network Communications are proposing to carry out Remedial works on Albion Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 26 Mar 2024 at 14:39.

Between
22 Apr and 3 May 2024
Details
View Map
Share
Follow
Albion Road

G. Network Communications are proposing to carry out Remedial works on Albion Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 3 Apr 2024 at 15:28.

Thames Water logo
LONG TERM
Between
23 Apr and 25 Jul 2024
Details
View Map
Share
Follow
Hillside Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Hillside Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 25 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2023 at 15:37.

Thames Water logo
LONG TERM
Between
23 Apr and 25 Jul 2024
Details
View Map
Share
Follow
Palace Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 25 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Nov 2023 at 14:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
23 Apr and 25 May 2024
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 25 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 13:54.

City Of London Corporation logo
Between
23 and 27 Apr 2024
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 10 Apr 2024 at 10:33.

City Of London Corporation logo
Between
23 and 27 Apr 2024
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 10 Apr 2024 at 11:15.

City Of London Corporation logo
Between
23 and 27 Apr 2024
Details
View Map
Share
Follow
Tower Bridge

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 9 Feb 2024 at 13:26.

City Of London Corporation logo
Between
23 and 27 Apr 2024
Details
View Map
Share
Follow
Tower Bridge Approach

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 9 Feb 2024 at 13:25.

London Borough Of Lewisham logo
Between
24 and 28 Apr 2024
Details
View Map
Share
Follow
Adelaide Avenue

London Borough Of Lewisham are proposing to carry out Highway improvement works on Adelaide Avenue, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 9 Apr 2024 at 07:59.

London Borough Of Lewisham logo
Between
24 and 28 Apr 2024
Details
View Map
Share
Follow
Adelaide Avenue

London Borough Of Lewisham are proposing to carry out Highway improvement works on Adelaide Avenue, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 9 Apr 2024 at 08:21.

Thames Water logo
Between
24 and 30 Apr 2024
Details
View Map
Share
Follow
South Audley Street

Thames Water are proposing to carry out roadworks on South Audley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 07:40.

Thames Water logo
Between
24 and 30 Apr 2024
Details
View Map
Share
Follow
Upper Grosvenor Street

Thames Water are proposing to carry out New service connection on Upper Grosvenor Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 30 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 09:48.

UK Power Networks Eastern & London logo
Between
24 Apr and 3 May 2024
Details
View Map
Share
Follow
Drummond Crescent

UK Power Networks Eastern & London are proposing to carry out New service connection on Drummond Crescent, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Feb 2024 at 16:03.

Thames Water logo
Between
25 Apr and 11 May 2024
Details
View Map
Share
Follow
Rouel Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Rouel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Jan 2024 at 16:08.

City Of Westminster logo
Between
25 and 29 Apr 2024
Details
View Map
Share
Follow
St Ermin's Hill

City Of Westminster are proposing to carry out Highway improvement works on St Ermin's Hill, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 11:18.

London Borough Of Southwark logo
Between
26 and 28 Apr 2024
Details
View Map
Share
Follow
Commercial Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Commercial Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 13:00.

UK Power Networks Eastern & London logo
Between
26 Apr and 20 May 2024
Details
View Map
Share
Follow
Layard Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Layard Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Mar 2024 at 11:15.

Thames Water logo
Between
26 and 28 Apr 2024
Details
View Map
Share
Follow
New Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 08:36.

Thames Water logo
Between
26 and 28 Apr 2024
Details
View Map
Share
Follow
New Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 10:37.

Thames Water logo
Between
26 and 28 Apr 2024
Details
View Map
Share
Follow
New Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 08:37.

Thames Water logo
Between
26 and 28 Apr 2024
Details
View Map
Share
Follow
New Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 10:38.

Virgin Media logo
Between
26 Apr and 13 May 2024
Details
View Map
Share
Follow
Gower Street

Virgin Media are proposing to carry out Utility asset works on Gower Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 28 Mar 2024 at 07:24.

Thames Water logo
Between
27 and 29 Apr 2024
Details
View Map
Share
Follow
Vauxhall Bridge Road

Thames Water are proposing to carry out Utility repair and maintenance works on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 08:45.

Thames Water logo
Between
27 and 29 Apr 2024
Details
View Map
Share
Follow
Vauxhall Bridge Road

Thames Water are proposing to carry out Utility repair and maintenance works on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 09:50.

Vodafone logo
Between
27 and 29 Apr 2024
Details
View Map
Share
Follow
Abchurch Lane

Vodafone are proposing to carry out Utility repair and maintenance works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 3 Apr 2024 at 08:40.

Vodafone logo
Between
27 and 29 Apr 2024
Details
View Map
Share
Follow
Abchurch Lane

Vodafone are proposing to carry out Utility repair and maintenance works on Abchurch Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 9 Apr 2024 at 10:17.

London Borough Of Southwark logo
Between
28 and 30 Apr 2024
Details
View Map
Share
Follow
Rye Hill Park

London Borough Of Southwark are proposing to carry out Highway improvement works on Rye Hill Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2024 at 19:29.

London Borough Of Southwark logo
Between
28 Apr and 10 May 2024
Details
View Map
Share
Follow
Hyndman Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Hyndman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Feb 2024 at 13:20.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr and 3 Jun 2024
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2024 at 10:56.

Transport for London (TfL) logo
LONG TERM
Between
28 Apr and 25 Jun 2024
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2024 at 10:55.

Vodafone logo
Between
28 and 30 Apr 2024
Details
View Map
Share
Follow
Stratton Street

Vodafone are proposing to carry out Utility asset works on Stratton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 22 Feb 2024 at 14:16.

Thames Water logo
Between
28 Apr and 2 May 2024
Details
View Map
Share
Follow
Grafton Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Grafton Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 07:52.

Thames Water logo
Between
28 Apr and 2 May 2024
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out Disconnection or alteration of supply on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 15:58.

Cadent Gas logo
Between
28 Apr and 2 May 2024
Details
View Map
Share
Follow
St Anselm's Place

Cadent Gas are proposing to carry out New service connection on St Anselm's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 23:10.

City Of London Telecomms logo
Between
28 and 30 Apr 2024
Details
View Map
Share
Follow
Dean Street

City Of London Telecomms are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Telecomms on 22 Mar 2024 at 18:27.

BT logo
Between
28 Apr and 2 May 2024
Details
View Map
Share
Follow
Terrace Road

BT are proposing to carry out Utility repair and maintenance works on Terrace Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Mar 2024 at 12:19.

BT logo
Between
28 Apr and 2 May 2024
Details
View Map
Share
Follow
Terrace Road

BT are proposing to carry out Utility repair and maintenance works on Terrace Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Apr 2024 at 10:11.

BT logo
Between
28 Apr and 2 May 2024
Details
View Map
Share
Follow
Terrace Road

BT are proposing to carry out Utility repair and maintenance works on Terrace Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 5 Apr 2024 at 10:12.

Thames Water logo
Between
28 Apr and 4 May 2024
Details
View Map
Share
Follow
Windmill Lane

Thames Water are proposing to carry out New service connection on Windmill Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 4 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 07:00.

London Borough Of Lewisham logo
Between
29 Apr and 1 May 2024
Details
View Map
Share
Follow
Harefield Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Harefield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 9 Apr 2024 at 08:01.

London Borough Of Lewisham logo
Between
29 Apr and 1 May 2024
Details
View Map
Share
Follow
Harefield Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Harefield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 9 Apr 2024 at 08:19.

London Borough Of Southwark logo
Between
29 Apr and 1 May 2024
Details
View Map
Share
Follow
Lyndhurst Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Lyndhurst Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 12:14.

London Borough Of Southwark logo
Between
29 Apr and 1 May 2024
Details
View Map
Share
Follow
Lyndhurst Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Lyndhurst Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 12:14.

London Borough Of Southwark logo
LONG TERM
Between
29 Apr and 14 Jun 2024
Details
View Map
Share
Follow
Mission Place

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Mission Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 12 Apr 2024 at 13:49.

London Borough Of Southwark logo
LONG TERM
Between
29 Apr and 28 Jun 2024
Details
View Map
Share
Follow
Chapter Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Chapter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Apr 2024 at 14:43.

LONG TERM
Between
29 Apr and 23 Jul 2024
Details
View Map
Share
Follow
Verney Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Verney Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 23 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Apr 2024 at 09:32.

LONG TERM
Between
29 Apr and 23 Jul 2024
Details
View Map
Share
Follow
Verney Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Verney Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 23 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Apr 2024 at 10:03.

LONG TERM
Between
29 Apr and 19 Jul 2024
Details
View Map
Share
Follow
Verney Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Verney Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Apr 2024 at 09:03.

Thames Water logo
LONG TERM
Between
29 Apr and 16 Jul 2024
Details
View Map
Share
Follow
Bombay Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Bombay Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Feb 2024 at 08:22.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Apr and 10 Jun 2024
Details
View Map
Share
Follow
Quebec Way

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Quebec Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Apr 2024 at 13:15.

Between
29 Apr and 11 May 2024
Details
View Map
Share
Follow
Manilla Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manilla Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Mar 2024 at 09:33.

Between
29 Apr and 11 May 2024
Details
View Map
Share
Follow
Manilla Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Manilla Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Apr 2024 at 11:48.

Between
29 Apr and 11 May 2024
Details
View Map
Share
Follow
Cuba Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Cuba Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Mar 2024 at 09:36.

Between
29 Apr and 11 May 2024
Details
View Map
Share
Follow
Cuba Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Cuba Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Apr 2024 at 11:48.

UK Power Networks Eastern & London logo
LONG TERM
Between
29 Apr and 8 Jun 2024
Details
View Map
Share
Follow
St Katharines Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on St Katharines Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 8 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 17:37.

Thames Water logo
Between
29 Apr and 8 May 2024
Details
View Map
Share
Follow
Saltwell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Saltwell Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 15:37.

Thames Water logo
Between
29 Apr and 8 May 2024
Details
View Map
Share
Follow
Saltwell Street

Thames Water are proposing to carry out Utility repair and maintenance works on Saltwell Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 08:38.

Thames Water logo
Between
29 Apr and 6 May 2024
Details
View Map
Share
Follow
Cleveland Street

Thames Water are proposing to carry out New service connection on Cleveland Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 6 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Feb 2024 at 12:57.

Thames Water logo
Between
29 Apr and 5 May 2024
Details
View Map
Share
Follow
Windmill Lane

Thames Water are proposing to carry out New service connection on Windmill Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 5 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 15:46.

Thames Water logo
Between
30 Apr and 2 May 2024
Details
View Map
Share
Follow
Sylvan Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Sylvan Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Feb 2024 at 08:56.

LONG TERM
Between
30 Apr 2024 and 30 Apr 2025
Details
View Map
Share
Follow
North Woolwich Road

London Borough Of Newham are proposing to carry out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 2 Feb 2024 at 12:23.

City Of Westminster logo
Between
30 Apr and 14 May 2024
Details
View Map
Share
Follow
Mercer Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Mercer Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 14 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 16 Apr 2024 at 07:28.

Thames Water logo
Between
1 and 3 May 2024
Details
View Map
Share
Follow
Knollys Road

Thames Water are proposing to carry out Utility repair and maintenance works on Knollys Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 09:40.

London Borough Of Lewisham logo
Between
1 and 3 May 2024
Details
View Map
Share
Follow
Pepys Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Pepys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 9 Apr 2024 at 08:02.

London Borough Of Lewisham logo
Between
1 and 3 May 2024
Details
View Map
Share
Follow
Pepys Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Pepys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 9 Apr 2024 at 08:17.

City Of Westminster logo
Between
1 and 14 May 2024
Details
View Map
Share
Follow
Dacre Street

City Of Westminster are proposing to carry out Highway improvement works on Dacre Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 11 Apr 2024 at 14:55.

City Of Westminster logo
Between
1 and 14 May 2024
Details
View Map
Share
Follow
Dacre Street

City Of Westminster are proposing to carry out Highway improvement works on Dacre Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 12 Apr 2024 at 09:20.

London Borough Of Southwark logo
Between
1 and 3 May 2024
Details
View Map
Share
Follow
Barnham Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Barnham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 11:27.

London Borough Of Southwark logo
Between
1 and 3 May 2024
Details
View Map
Share
Follow
Shand Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Shand Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 11:40.

London Borough Of Southwark logo
Between
1 and 3 May 2024
Details
View Map
Share
Follow
Shand Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Shand Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2024 at 08:06.

Transport for London (TfL) logo
Between
1 and 30 May 2024
Details
View Map
Share
Follow
East India Dock Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on East India Dock Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 13:34.

Transport for London (TfL) logo
Between
1 and 30 May 2024
Details
View Map
Share
Follow
St Leonards Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on St Leonards Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 13:42.

City Of London Corporation logo
LONG TERM
Between
1 May and 7 Jul 2024
Details
View Map
Share
Follow
Threadneedle Street

City Of London Corporation are proposing to carry out Highway improvement works on Threadneedle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 7 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 11 Mar 2024 at 10:11.

City Of Westminster logo
Between
1 and 10 May 2024
Details
View Map
Share
Follow
Oxford Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Mar 2024 at 16:30.

UK Power Networks Eastern & London logo
Between
1 and 20 May 2024
Details
View Map
Share
Follow
Hampstead Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Hampstead Road, Regent's Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Jan 2024 at 10:43.

UK Power Networks Eastern & London logo
Between
1 and 20 May 2024
Details
View Map
Share
Follow
Varndell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Varndell Street, Regent's Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Mar 2024 at 10:10.

London Borough Of Southwark logo
Between
2 and 17 May 2024
Details
View Map
Share
Follow
Melon Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Melon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Feb 2024 at 13:48.

Transport for London (TfL) logo
Between
2 and 14 May 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 18:45.

Transport for London (TfL) logo
Between
2 and 14 May 2024
Details
View Map
Share
Follow
Knightsbridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 13:21.

London Borough Of Southwark logo
Between
3 and 5 May 2024
Details
View Map
Share
Follow
Commercial Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Commercial Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2024 and could run through until 5 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 13:06.

Electricity Network Company logo
Between
3 and 31 May 2024
Details
View Map
Share
Follow
Wandsworth Road

Electricity Network Company are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 17 Jan 2024 at 08:42.

City Of Westminster logo
Between
3 and 17 May 2024
Details
View Map
Share
Follow
Mercer Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Mercer Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 6 Mar 2024 at 10:30.

Thames Water logo
LONG TERM
Between
5 May 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Manchester Road

Thames Water are proposing to carry out Utility asset works on Manchester Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 13:46.

Thames Water logo
LONG TERM
Between
5 May 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Manchester Road

Thames Water are proposing to carry out Utility asset works on Manchester Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 13:54.

Southern Gas Networks logo
Between
5 and 12 May 2024
Details
View Map
Share
Follow
Avonmouth Street

Southern Gas Networks are proposing to carry out Permanent reinstatement on Avonmouth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Apr 2024 at 09:23.

Southern Gas Networks logo
Between
5 and 12 May 2024
Details
View Map
Share
Follow
Avonmouth Street

Southern Gas Networks are proposing to carry out Permanent reinstatement on Avonmouth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2024 at 15:30.

London Borough Of Southwark logo
Between
5 and 10 May 2024
Details
View Map
Share
Follow
Barnham Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Barnham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 09:40.

Vodafone logo
Between
5 and 8 May 2024
Details
View Map
Share
Follow
Berkeley Street

Vodafone are proposing to carry out Utility asset works on Berkeley Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 22 Feb 2024 at 14:19.

London Borough Of Lewisham logo
Between
6 and 17 May 2024
Details
View Map
Share
Follow
Brockley Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Brockley Road, Crofton Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 17 May 2024. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lewisham on 8 Mar 2024 at 15:24.

London Borough Of Southwark logo
Between
6 and 8 May 2024
Details
View Map
Share
Follow
Fenwick Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Fenwick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Apr 2024 at 11:48.

London Borough Of Southwark logo
Between
6 and 8 May 2024
Details
View Map
Share
Follow
Fenwick Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Fenwick Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Apr 2024 at 11:48.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 May and 21 Jun 2024
Details
View Map
Share
Follow
Grove Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Jan 2024 at 19:31.

Cadent Gas logo
Between
6 May and 3 Jun 2024
Details
View Map
Share
Follow
Monck Street

Cadent Gas are proposing to carry out Utility asset works on Monck Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Mar 2024 at 10:47.

Southern Gas Networks logo
Between
6 and 13 May 2024
Details
View Map
Share
Follow
Avonmouth Street

Southern Gas Networks are proposing to carry out Permanent reinstatement on Avonmouth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2024 at 09:58.

Network Rail logo
Between
6 and 10 May 2024
Details
View Map
Share
Follow
Crucifix Lane

Network Rail are proposing to carry out Works for Rail Purposes on Crucifix Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Apr 2024 at 09:42.

Network Rail logo
Between
6 and 10 May 2024
Details
View Map
Share
Follow
Crucifix Lane

Network Rail are proposing to carry out Works for Rail Purposes on Crucifix Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Apr 2024 at 11:13.

Between
6 and 17 May 2024
Details
View Map
Share
Follow
Southwark Bridge Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Southwark Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 5 Apr 2024 at 08:14.

Between
6 and 17 May 2024
Details
View Map
Share
Follow
Southwark Bridge Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Southwark Bridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Apr 2024 at 09:02.

Between
6 and 17 May 2024
Details
View Map
Share
Follow
Southwark Bridge Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Southwark Bridge Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Apr 2024 at 13:44.

City Of London Telecomms logo
Between
6 and 9 May 2024
Details
View Map
Share
Follow
Upper John Street

City Of London Telecomms are proposing to carry out Utility asset works on Upper John Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 5 Apr 2024 at 13:38.

City Of London Telecomms logo
Between
6 and 9 May 2024
Details
View Map
Share
Follow
Upper John Street

City Of London Telecomms are proposing to carry out Utility asset works on Upper John Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 9 Apr 2024 at 10:33.

Thames Water logo
Between
6 and 14 May 2024
Details
View Map
Share
Follow
Great Eastern Road

Thames Water are proposing to carry out Utility repair and maintenance works on Great Eastern Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Feb 2024 at 14:31.

Thames Water logo
LONG TERM
Between
7 May and 11 Dec 2024
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Dec 2023 at 12:17.

Thames Water logo
LONG TERM
Between
7 May and 11 Dec 2024
Details
View Map
Share
Follow
Glengarry Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Glengarry Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Dec 2023 at 12:10.

Thames Water logo
LONG TERM
Between
7 May and 2 Jul 2024
Details
View Map
Share
Follow
Trossachs Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Trossachs Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 2 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Dec 2023 at 12:10.

Transport for London (TfL) logo
LONG TERM
Between
7 May and 13 Jun 2024
Details
View Map
Share
Follow
Brixton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Brixton Road, Brixton North, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Mar 2024 at 14:46.

UK Power Networks Eastern & London logo
Between
7 and 13 May 2024
Details
View Map
Share
Follow
Boundary Lane

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Boundary Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2024 at 07:46.

LONG TERM
Between
7 May and 7 Jun 2024
Details
View Map
Share
Follow
Bugsbys Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bugsbys Way, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Apr 2024 at 10:19.

LONG TERM
Between
7 May and 7 Jun 2024
Details
View Map
Share
Follow
Bugsbys Way

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bugsbys Way, Charlton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Apr 2024 at 12:33.

Thames Water logo
LONG TERM
Between
7 May and 21 Aug 2024
Details
View Map
Share
Follow
Grosvenor Gardens

Thames Water are proposing to carry out Utility asset works on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jan 2024 at 14:18.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:44.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 11:04.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:46.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 11:01.

Virgin Media logo
Between
7 and 9 May 2024
Details
View Map
Share
Follow
Cork Street

Virgin Media are proposing to carry out Utility asset works on Cork Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Feb 2024 at 06:50.

Virgin Media logo
Between
7 and 9 May 2024
Details
View Map
Share
Follow
Cranbourn Street

Virgin Media are proposing to carry out Utility asset works on Cranbourn Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 24 Jan 2024 at 09:34.

City Of Westminster logo
Between
7 and 9 May 2024
Details
View Map
Share
Follow
Dunraven Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Dunraven Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Feb 2024 at 13:36.

City Of Westminster logo
Between
7 and 9 May 2024
Details
View Map
Share
Follow
Green Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Green Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:10.

UK Power Networks Eastern & London logo
Between
7 and 22 May 2024
Details
View Map
Share
Follow
Eversholt Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Eversholt Street, St Pancras And Somers Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Feb 2024 at 13:50.

Thames Water logo
Between
7 and 11 May 2024
Details
View Map
Share
Follow
Cycle Path From Borough Boundary To Stratford High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cycle Path From Borough Boundary To Stratford High Street, Stratford, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 7 May 2024 and could run through until 11 May 2024. The works will impact the cycleway only.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 09:26.

Thames Water logo
Between
9 and 11 May 2024
Details
View Map
Share
Follow
Warner Road

Thames Water are proposing to carry out Utility repair and maintenance works on Warner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 07:26.

Between
9 and 22 May 2024
Details
View Map
Share
Follow
Market Mews

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Apr 2024 at 14:23.

London Borough Of Southwark logo
Between
10 and 12 May 2024
Details
View Map
Share
Follow
Colombo Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Jan 2024 at 09:13.

Thames Water logo
LONG TERM
Between
11 May and 14 Jun 2024
Details
View Map
Share
Follow
Crimsworth Road

Thames Water are proposing to carry out Utility asset works on Crimsworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2024 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 08:12.

UK Power Networks Eastern & London logo
Between
11 and 19 May 2024
Details
View Map
Share
Follow
Druid Street

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Druid Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 13:51.

London Borough Of Southwark logo
Between
11 and 13 May 2024
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Mar 2024 at 18:00.

BT logo
Between
11 and 13 May 2024
Details
View Map
Share
Follow
Chapman Street

BT are proposing to carry out Utility repair and maintenance works on Chapman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 11 Apr 2024 at 10:29.

BT logo
Between
11 and 13 May 2024
Details
View Map
Share
Follow
Chapman Street

BT are proposing to carry out Utility repair and maintenance works on Chapman Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 15 Apr 2024 at 10:59.

Thames Water logo
Between
12 and 16 May 2024
Details
View Map
Share
Follow
Blythe Hill Lane

Thames Water are proposing to carry out New service connection on Blythe Hill Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Mar 2024 at 13:03.

Thames Water logo
Between
12 and 25 May 2024
Details
View Map
Share
Follow
New Cross Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Feb 2024 at 11:39.

Cadent Gas logo
Between
12 and 18 May 2024
Details
View Map
Share
Follow
Elizabeth Street

Cadent Gas are proposing to carry out Remedial works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 13:54.

Cadent Gas logo
Between
12 and 18 May 2024
Details
View Map
Share
Follow
Elizabeth Street

Cadent Gas are proposing to carry out Remedial works on Elizabeth Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Apr 2024 at 09:38.

London Borough Of Southwark logo
Between
12 and 14 May 2024
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Apr 2024 at 12:01.

London Borough Of Southwark logo
Between
12 and 14 May 2024
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Apr 2024 at 12:01.

Thames Water logo
Between
12 and 25 May 2024
Details
View Map
Share
Follow
Stamford Street

Thames Water are proposing to carry out Utility repair and maintenance works on Stamford Street, London.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 25 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 09:43.

Thames Water logo
Between
12 and 17 May 2024
Details
View Map
Share
Follow
Sackville Street

Thames Water are proposing to carry out New service connection on Sackville Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 07:50.

Thames Water logo
Between
12 and 20 May 2024
Details
View Map
Share
Follow
Marshall Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Marshall Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Mar 2024 at 20:44.

Thames Water logo
Between
12 and 18 May 2024
Details
View Map
Share
Follow
Broadwick Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Broadwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Mar 2024 at 20:44.

Thames Water logo
Between
12 and 18 May 2024
Details
View Map
Share
Follow
Foubert's Place

Thames Water are proposing to carry out New service connection on Foubert's Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Mar 2024 at 13:18.

Thames Water logo
Between
12 and 26 May 2024
Details
View Map
Share
Follow
West Ham Lane

Thames Water are proposing to carry out Utility asset works on West Ham Lane, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Feb 2024 at 15:59.

Thames Water logo
LONG TERM
Between
12 May and 15 Jun 2024
Details
View Map
Share
Follow
Aldworth Road

Thames Water are proposing to carry out Utility asset works on Aldworth Road, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Feb 2024 at 15:47.

Thames Water logo
Between
12 May and 1 Jun 2024
Details
View Map
Share
Follow
International Way

Thames Water are proposing to carry out Statutory Infrastructure Works on International Way, Stratford, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 1 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 09:18.

London Borough Of Lewisham logo
Between
13 and 24 May 2024
Details
View Map
Share
Follow
Brockley Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Brockley Road, Crofton Park, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 24 May 2024. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lewisham on 10 Apr 2024 at 09:16.

Thames Water logo
Between
13 and 15 May 2024
Details
View Map
Share
Follow
Nigel Road

Thames Water are proposing to carry out Utility asset works on Nigel Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 09:05.

Thames Tideway Tunnel logo
Between
13 and 18 May 2024
Details
View Map
Share
Follow
Chelsea Embankment

Thames Tideway Tunnel are proposing to carry out Works for road purposes on Chelsea Embankment, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 11 Apr 2024 at 12:19.

London Borough Of Southwark logo
LONG TERM
Between
13 May and 22 Jun 2024
Details
View Map
Share
Follow
De Laune Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on De Laune Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 07:58.

London Borough Of Southwark logo
LONG TERM
Between
13 May and 22 Jun 2024
Details
View Map
Share
Follow
Braganza Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Braganza Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 07:58.

London Borough Of Southwark logo
LONG TERM
Between
13 May and 22 Jun 2024
Details
View Map
Share
Follow
Alberta Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Alberta Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 27 Feb 2024 at 13:47.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 May and 27 Sep 2024
Details
View Map
Share
Follow
Galleywall Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Galleywall Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 27 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2024 at 15:09.

London Borough Of Southwark logo
LONG TERM
Between
13 May and 15 Jun 2024
Details
View Map
Share
Follow
Berryfield Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Berryfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 20 Feb 2024 at 07:40.

London Borough Of Southwark logo
LONG TERM
Between
13 May and 15 Jun 2024
Details
View Map
Share
Follow
Penton Place

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Penton Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 20 Feb 2024 at 07:40.

London Borough Of Southwark logo
LONG TERM
Between
13 May and 15 Jun 2024
Details
View Map
Share
Follow
Amelia Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Amelia Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 20 Feb 2024 at 07:40.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 May and 24 Jun 2024
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Apr 2024 at 12:10.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 May and 24 Jun 2024
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2024 at 15:30.

Thames Water logo
LONG TERM
Between
13 May and 5 Jul 2024
Details
View Map
Share
Follow
East Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on East Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:51.

Murphy Power Distribution logo
LONG TERM
Between
13 May and 21 Jun 2024
Details
View Map
Share
Follow
Mastmaker Road

Murphy Power Distribution are proposing to carry out Utility asset works on Mastmaker Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 12 Feb 2024 at 13:39.

UK Power Networks Eastern & London logo
Between
13 and 24 May 2024
Details
View Map
Share
Follow
Weighhouse Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Weighhouse Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Apr 2024 at 12:05.

UK Power Networks Eastern & London logo
Between
13 May and 3 Jun 2024
Details
View Map
Share
Follow
Vere Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Vere Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Apr 2024 at 08:09.

City Of Westminster logo
Between
13 and 16 May 2024
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Apr 2024 at 10:58.

Boldyn Networks logo
Between
13 May and 5 Jun 2024
Details
View Map
Share
Follow
Norton Folgate

Boldyn Networks are proposing to carry out Utility asset works on Norton Folgate, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Boldyn Networks on 22 Mar 2024 at 13:22.

LONG TERM
Between
13 May and 14 Jun 2024
Details
View Map
Share
Follow
Aldworth Road

London Borough Of Newham are proposing to carry out Highway improvement works on Aldworth Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 11 Apr 2024 at 08:03.

Thames Water logo
Between
13 and 17 May 2024
Details
View Map
Share
Follow
Waterloo Terrace

Thames Water are proposing to carry out New service connection on Waterloo Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Feb 2024 at 13:51.

BT logo
Between
13 and 17 May 2024
Details
View Map
Share
Follow
Sutton Place

BT are proposing to carry out Utility repair and maintenance works on Sutton Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Feb 2024 at 22:52.

Transport for London (TfL) logo
Between
13 and 30 May 2024
Details
View Map
Share
Follow
Sandringham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2024 at 14:56.

Southern Gas Networks logo
LONG TERM
Between
14 May and 25 Jun 2024
Details
View Map
Share
Follow
Dekker Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dekker Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2024 at 16:30.

Network Rail logo
LONG TERM
Between
14 May and 23 Aug 2024
Details
View Map
Share
Follow
St Germans Place

Network Rail are proposing to carry out Works for Rail Purposes on St Germans Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 23 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Apr 2024 at 07:49.

Network Rail logo
LONG TERM
Between
14 May and 23 Aug 2024
Details
View Map
Share
Follow
St Germans Place

Network Rail are proposing to carry out Works for Rail Purposes on St Germans Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 23 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 15 Apr 2024 at 09:03.

Thames Water logo
Between
14 and 16 May 2024
Details
View Map
Share
Follow
Laurie Grove

Thames Water are proposing to carry out New service connection on Laurie Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Feb 2024 at 09:22.

Thames Water logo
LONG TERM
Between
14 May and 18 Aug 2024
Details
View Map
Share
Follow
Neathouse Place

Thames Water are proposing to carry out Utility asset works on Neathouse Place, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 18 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jan 2024 at 11:18.

Thames Water logo
LONG TERM
Between
14 May and 23 Sep 2024
Details
View Map
Share
Follow
Wilton Road

Thames Water are proposing to carry out Utility asset works on Wilton Road, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jan 2024 at 11:18.

City Of Westminster logo
Between
14 and 17 May 2024
Details
View Map
Share
Follow
Mill Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Mill Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:09.

Hyperoptic logo
Between
14 and 16 May 2024
Details
View Map
Share
Follow
Dagmar Terrace

Hyperoptic are proposing to carry out Utility asset works on Dagmar Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 15 Mar 2024 at 09:01.

London Borough Of Wandsworth logo
Between
15 and 17 May 2024
Details
View Map
Share
Follow
Dunston Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Dunston Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 3 Apr 2024 at 07:38.

London Borough Of Wandsworth logo
Between
15 and 17 May 2024
Details
View Map
Share
Follow
Dunston Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Dunston Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 3 Apr 2024 at 10:14.

Thames Water logo
LONG TERM
Between
15 May and 30 Jun 2024
Details
View Map
Share
Follow
Goldsboro' Road

Thames Water are proposing to carry out Utility asset works on Goldsboro' Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 12:43.

Between
15 and 29 May 2024
Details
View Map
Share
Follow
Market Mews

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Apr 2024 at 14:23.

Between
15 and 21 May 2024
Details
View Map
Share
Follow
Market Mews

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 8 Apr 2024 at 14:15.

Between
15 and 21 May 2024
Details
View Map
Share
Follow
Market Mews

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 8 Apr 2024 at 15:06.

City Of Westminster logo
Between
15 and 18 May 2024
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 18 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Apr 2024 at 11:12.

Boldyn Networks logo
Between
15 and 19 May 2024
Details
View Map
Share
Follow
Worship Street

Boldyn Networks are proposing to carry out Utility asset works on Worship Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Boldyn Networks on 2 Apr 2024 at 15:45.

Between
16 May and 5 Jun 2024
Details
View Map
Share
Follow
Union Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Union Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Apr 2024 at 08:54.

Transport for London (TfL) logo
Between
17 and 20 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 14:20.

Transport for London (TfL) logo
Between
17 and 20 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 14:08.

London Borough Of Southwark logo
Between
17 and 19 May 2024
Details
View Map
Share
Follow
Colombo Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Jan 2024 at 09:07.

Transport for London (TfL) logo
Between
17 and 20 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:27.

Transport for London (TfL) logo
Between
17 and 20 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:25.

Transport for London (TfL) logo
Between
17 and 20 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:26.

Transport for London (TfL) logo
Between
17 and 20 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 10:53.

Transport for London (TfL) logo
Between
17 and 20 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:25.

Transport for London (TfL) logo
Between
17 and 20 May 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:18.

London Borough Of Southwark logo
Between
18 and 20 May 2024
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2024 at 17:12.

Thames Water logo
LONG TERM
Between
18 May and 20 Jul 2024
Details
View Map
Share
Follow
Elderfield Road

Thames Water are proposing to carry out Utility asset works on Elderfield Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2024 and could run through until 20 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:55.

Southern Gas Networks logo
Between
19 and 28 May 2024
Details
View Map
Share
Follow
Rubens Street

Southern Gas Networks are proposing to carry out New service connection on Rubens Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 28 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Feb 2024 at 15:55.

Thames Water logo
LONG TERM
Between
19 May and 23 Jun 2024
Details
View Map
Share
Follow
Surrey Canal Road

Thames Water are proposing to carry out Utility asset works on Surrey Canal Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Apr 2024 at 09:36.

Thames Water logo
LONG TERM
Between
19 May and 23 Jun 2024
Details
View Map
Share
Follow
Surrey Canal Road

Thames Water are proposing to carry out Utility asset works on Surrey Canal Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Apr 2024 at 09:54.

Thames Water logo
LONG TERM
Between
19 May and 23 Jun 2024
Details
View Map
Share
Follow
Ilderton Road

Thames Water are proposing to carry out Utility asset works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 08:41.

London Borough Of Southwark logo
Between
19 and 26 May 2024
Details
View Map
Share
Follow
Crimscott Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Crimscott Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 26 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 07:30.

London Borough Of Southwark logo
Between
19 and 24 May 2024
Details
View Map
Share
Follow
Risborough Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Risborough Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Feb 2024 at 07:44.

Thames Water logo
Between
19 and 22 May 2024
Details
View Map
Share
Follow
Nicholson Street

Thames Water are proposing to carry out New service connection on Nicholson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 08:05.

Thames Water logo
Between
19 and 23 May 2024
Details
View Map
Share
Follow
Pollen Street

Thames Water are proposing to carry out New service connection on Pollen Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Feb 2024 at 14:15.

City Of London Telecomms logo
Between
19 and 21 May 2024
Details
View Map
Share
Follow
Foster Lane

City Of London Telecomms are proposing to carry out Utility asset works on Foster Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 21 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by City Of London Telecomms on 12 Mar 2024 at 14:17.

Thames Water logo
Between
19 May and 2 Jun 2024
Details
View Map
Share
Follow
Fetter Lane

Thames Water are proposing to carry out New service connection on Fetter Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 07:19.

Thames Water logo
Between
19 May and 2 Jun 2024
Details
View Map
Share
Follow
Fetter Lane

Thames Water are proposing to carry out New service connection on Fetter Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 08:09.

Cadent Gas logo
Between
19 and 23 May 2024
Details
View Map
Share
Follow
Tidworth Road

Cadent Gas are proposing to carry out Utility asset works on Tidworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Mar 2024 at 13:08.

London Borough Of Hackney logo
Between
19 and 23 May 2024
Details
View Map
Share
Follow
Shacklewell Lane

London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Shacklewell Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 28 Mar 2024 at 10:49.

Southern Gas Networks logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Alleyn Park

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Alleyn Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2024 at 11:29.

Thames Water logo
Between
20 and 22 May 2024
Details
View Map
Share
Follow
Combedale Road

Thames Water are proposing to carry out Remedial works on Combedale Road, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Feb 2024 at 09:55.

Royal Borough Of Greenwich logo
Between
20 May and 4 Jun 2024
Details
View Map
Share
Follow
Peartree Way

Royal Borough Of Greenwich are proposing to carry out Highway improvement works on Peartree Way, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 15 Apr 2024 at 09:23.

Royal Borough Of Greenwich logo
Between
20 May and 4 Jun 2024
Details
View Map
Share
Follow
Peartree Way

Royal Borough Of Greenwich are proposing to carry out Highway improvement works on Peartree Way, Greenwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Greenwich on 15 Apr 2024 at 10:22.

Thames Water logo
LONG TERM
Between
20 May and 6 Aug 2024
Details
View Map
Share
Follow
Scott Lidgett Crescent

Thames Water are proposing to carry out Disconnection or alteration of supply on Scott Lidgett Crescent, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 6 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:57.

City Of Westminster logo
Between
20 and 23 May 2024
Details
View Map
Share
Follow
Albemarle Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Albemarle Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:22.

London Borough Of Southwark logo
Between
20 and 21 May 2024
Details
View Map
Share
Follow
Bankside

London Borough Of Southwark are proposing to carry out Highway improvement works on Bankside, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Apr 2024 at 11:47.

London Borough Of Southwark logo
Between
20 and 21 May 2024
Details
View Map
Share
Follow
Bankside

London Borough Of Southwark are proposing to carry out Highway improvement works on Bankside, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Apr 2024 at 11:47.

City Of Westminster logo
Between
20 and 23 May 2024
Details
View Map
Share
Follow
Stafford Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Stafford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 27 Feb 2024 at 10:11.

Transport for London (TfL) logo
LONG TERM
Between
20 May and 22 Jul 2024
Details
View Map
Share
Follow
Upper Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 13 Mar 2024 at 16:15.

Transport for London (TfL) logo
LONG TERM
Between
20 May and 22 Jul 2024
Details
View Map
Share
Follow
Arthur Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Arthur Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Feb 2024 at 10:34.

Transport for London (TfL) logo
LONG TERM
Between
20 May and 22 Jul 2024
Details
View Map
Share
Follow
Swan Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Swan Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 23 Feb 2024 at 10:38.

City Of Westminster logo
Between
20 and 23 May 2024
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Apr 2024 at 11:15.

UK Power Networks Eastern & London logo
Between
20 May and 18 Jun 2024
Details
View Map
Share
Follow
Whiston Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Whiston Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2024 at 17:35.

Thames Water logo
Between
20 and 23 May 2024
Details
View Map
Share
Follow
Windmill Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Windmill Lane, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 15:45.

Transport for London (TfL) logo
Between
21 and 23 May 2024
Details
View Map
Share
Follow
Upper Thames Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Upper Thames Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Feb 2024 at 14:46.

City Of Westminster logo
Between
22 and 24 May 2024
Details
View Map
Share
Follow
Regent Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Regent Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Apr 2024 at 11:19.

London Borough Of Wandsworth logo
Between
23 and 28 May 2024
Details
View Map
Share
Follow
Queenstown Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Queenstown Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 1 Mar 2024 at 13:40.

UK Power Networks Eastern & London logo
Between
23 and 28 May 2024
Details
View Map
Share
Follow
Doric Way

UK Power Networks Eastern & London are proposing to carry out New service connection on Doric Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Feb 2024 at 16:03.

BT logo
On
24 May 2024
Details
View Map
Share
Follow
Manwood Road

BT are proposing to carry out Utility asset works on Manwood Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works are scheduled for 24 May 2024 and are due to last for only one day. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 22 Feb 2024 at 13:30.

Thames Water logo
Between
24 May and 17 Jun 2024
Details
View Map
Share
Follow
Bishopsgate

Thames Water are proposing to carry out Utility repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 12:29.

Thames Water logo
Between
24 May and 17 Jun 2024
Details
View Map
Share
Follow
Threadneedle Street

Thames Water are proposing to carry out Utility asset works on Threadneedle Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Mar 2024 at 11:25.

Thames Water logo
Between
25 and 28 May 2024
Details
View Map
Share
Follow
Dartmouth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dartmouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 10:22.

Thames Water logo
Between
25 and 28 May 2024
Details
View Map
Share
Follow
Dartmouth Road

Thames Water are proposing to carry out Utility repair and maintenance works on Dartmouth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 10:37.

London Borough Of Southwark logo
Between
25 and 27 May 2024
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2024 at 17:12.

Cadent Gas logo
LONG TERM
Between
26 May and 31 Aug 2024
Details
View Map
Share
Follow
Old Seacoal Lane

Cadent Gas are proposing to carry out Utility asset works on Old Seacoal Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 31 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Apr 2024 at 10:35.

Cadent Gas logo
LONG TERM
Between
26 May and 31 Aug 2024
Details
View Map
Share
Follow
Farringdon Street

Cadent Gas are proposing to carry out Utility asset works on Farringdon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 31 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 08:00.

Cadent Gas logo
LONG TERM
Between
26 May and 31 Aug 2024
Details
View Map
Share
Follow
Charterhouse Street

Cadent Gas are proposing to carry out Utility asset works on Charterhouse Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 31 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 09:56.

BT logo
Between
26 and 30 May 2024
Details
View Map
Share
Follow
Northiam Street

BT are proposing to carry out Utility repair and maintenance works on Northiam Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Apr 2024 at 19:06.

BT logo
Between
26 and 30 May 2024
Details
View Map
Share
Follow
Well Street

BT are proposing to carry out Utility repair and maintenance works on Well Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Mar 2024 at 00:26.

Murphy Power Distribution logo
Between
27 May and 14 Jun 2024
Details
View Map
Share
Follow
Westwood Hill

Murphy Power Distribution are proposing to carry out Utility asset works on Westwood Hill, Anerley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 14 June 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Murphy Power Distribution on 4 Mar 2024 at 18:15.

Murphy Power Distribution logo
Between
27 May and 14 Jun 2024
Details
View Map
Share
Follow
Crystal Palace Parade

Murphy Power Distribution are proposing to carry out Utility asset works on Crystal Palace Parade, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 14 June 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Murphy Power Distribution on 11 Mar 2024 at 09:17.

Murphy Power Distribution logo
Between
27 May and 14 Jun 2024
Details
View Map
Share
Follow
Fountain Drive

Murphy Power Distribution are proposing to carry out Utility asset works on Fountain Drive, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 14 June 2024. The works will impact the footway and cycleway.

This roadwork event was last updated by Murphy Power Distribution on 11 Mar 2024 at 09:24.

UK Power Networks Eastern & London logo
Between
27 May and 12 Jun 2024
Details
View Map
Share
Follow
Victoria Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Victoria Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 09:53.

UK Power Networks Eastern & London logo
Between
27 and 31 May 2024
Details
View Map
Share
Follow
Palace Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 14 Mar 2024 at 10:45.

Thames Water logo
LONG TERM
Between
27 May and 19 Jul 2024
Details
View Map
Share
Follow
East Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on East Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:34.

Thames Water logo
LONG TERM
Between
27 May and 19 Jul 2024
Details
View Map
Share
Follow
East Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on East Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 06:07.

Cornerstone Telecommunications Infrastructure logo
Between
27 and 29 May 2024
Details
View Map
Share
Follow
William Street

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on William Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 27 Mar 2024 at 12:03.

UK Power Networks Eastern & London logo
Between
27 May and 9 Jun 2024
Details
View Map
Share
Follow
Portman Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:08.

Thames Water logo
Between
27 May and 1 Jun 2024
Details
View Map
Share
Follow
Glasshouse Yard

Thames Water are proposing to carry out New service connection on Glasshouse Yard, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Mar 2024 at 08:31.

Hyperoptic logo
Between
27 and 29 May 2024
Details
View Map
Share
Follow
Wakeham Street

Hyperoptic are proposing to carry out Utility asset works on Wakeham Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 4 Mar 2024 at 14:52.

Thames Water logo
Between
28 May and 1 Jun 2024
Details
View Map
Share
Follow
Crystal Palace Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2023 at 17:23.

Thames Water logo
Between
28 May and 1 Jun 2024
Details
View Map
Share
Follow
Westwood Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Westwood Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2023 at 15:43.

Thames Water logo
Between
28 May and 3 Jun 2024
Details
View Map
Share
Follow
Millmark Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Millmark Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Mar 2024 at 13:07.

Transport for London (TfL) logo
LONG TERM
Between
28 May and 7 Jul 2024
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 7 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Mar 2024 at 08:49.

Transport for London (TfL) logo
LONG TERM
Between
28 May and 25 Jul 2024
Details
View Map
Share
Follow
Horseferry Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 25 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Feb 2024 at 08:56.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 May and 20 Jul 2024
Details
View Map
Share
Follow
Gomm Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 20 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Feb 2024 at 15:05.

Thames Water logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Snowsfields

Thames Water are proposing to carry out Utility repair and maintenance works on Snowsfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 13:25.

Thames Water logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
St Thomas Street

Thames Water are proposing to carry out Utility repair and maintenance works on St Thomas Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 13:23.

Thames Water logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Collins Yard

Thames Water are proposing to carry out Remedial works on Collins Yard, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:15.

Thames Water logo
Between
28 and 30 May 2024
Details
View Map
Share
Collins Yard

Thames Water were proposing to carry out Remedial works on Collins Yard, Islington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 May 2024 and run through until 30 May 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 09:11.

Thames Water logo
Between
30 May and 1 Jun 2024
Details
View Map
Share
Follow
Ebor Street

Thames Water are proposing to carry out Utility repair and maintenance works on Ebor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 14:28.

Thames Water logo
Between
30 May and 1 Jun 2024
Details
View Map
Share
Follow
Ebor Street

Thames Water are proposing to carry out Utility repair and maintenance works on Ebor Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:47.

Thames Water logo
Between
30 May and 1 Jun 2024
Details
View Map
Share
Follow
Chance Street

Thames Water are proposing to carry out Utility repair and maintenance works on Chance Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 15:11.

Transport for London (TfL) logo
Between
31 May and 3 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 14:21.

Transport for London (TfL) logo
Between
31 May and 3 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 13:29.

Transport for London (TfL) logo
Between
31 May and 3 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 14:23.

London Borough Of Southwark logo
Between
31 May and 2 Jun 2024
Details
View Map
Share
Follow
Colombo Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Mar 2024 at 12:24.

Transport for London (TfL) logo
Between
31 May and 3 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:32.

Transport for London (TfL) logo
Between
31 May and 3 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:52.

Transport for London (TfL) logo
Between
31 May and 3 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:31.

Transport for London (TfL) logo
Between
31 May and 3 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:48.

Transport for London (TfL) logo
Between
31 May and 3 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:30.

Transport for London (TfL) logo
Between
31 May and 3 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:50.

UK Power Networks Eastern & London logo
Between
31 May and 6 Jun 2024
Details
View Map
Share
Follow
Fetter Lane

UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Fetter Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 1 Feb 2024 at 13:15.

Transport for London (TfL) logo
Between
31 May and 10 Jun 2024
Details
View Map
Share
Follow
Sandringham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2024 at 11:33.

Transport for London (TfL) logo
Between
1 and 30 Jun 2024
Details
View Map
Share
Follow
Trafalgar Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Trafalgar Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:38.

Transport for London (TfL) logo
Between
1 and 30 Jun 2024
Details
View Map
Share
Follow
Aspen Way

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Aspen Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:42.

Transport for London (TfL) logo
Between
1 and 30 Jun 2024
Details
View Map
Share
Follow
Prestons Road Roundabout

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prestons Road Roundabout, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:27.

Transport for London (TfL) logo
Between
1 and 30 Jun 2024
Details
View Map
Share
Follow
Prestons Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prestons Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Oct 2023 at 14:45.

Thames Water logo
Between
2 and 6 Jun 2024
Details
View Map
Share
Follow
Pimlico Road

Thames Water are proposing to carry out New service connection on Pimlico Road, Churchill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 13:45.

London Borough Of Southwark logo
Between
2 and 7 Jun 2024
Details
View Map
Share
Follow
Mill Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Mill Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Mar 2024 at 07:30.

Thames Water logo
Between
2 and 6 Jun 2024
Details
View Map
Share
Follow
Park Street

Thames Water are proposing to carry out New service connection on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 14:29.

Cadent Gas logo
Between
2 and 6 Jun 2024
Details
View Map
Share
Follow
Mount Street

Cadent Gas are proposing to carry out Remedial works on Mount Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 14:05.

Thames Water logo
Between
2 and 6 Jun 2024
Details
View Map
Share
Follow
Artillery Lane

Thames Water are proposing to carry out New service connection on Artillery Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Apr 2024 at 08:34.

Cadent Gas logo
Between
2 and 6 Jun 2024
Details
View Map
Share
Follow
Plough Yard

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Plough Yard, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 00:22.

Virgin Media logo
Between
2 and 4 Jun 2024
Details
View Map
Share
Follow
Vale Royal

Virgin Media are proposing to carry out Utility asset works on Vale Royal, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Feb 2024 at 13:55.

Thames Water logo
Between
2 Jun and 2 Jul 2024
Details
View Map
Share
Follow
Manbey Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Manbey Grove, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 2 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jan 2024 at 10:37.

Thames Water logo
Between
2 and 6 Jun 2024
Details
View Map
Share
Follow
Collins Road

Thames Water are proposing to carry out New service connection on Collins Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 09:44.

Thames Water logo
Between
3 and 9 Jun 2024
Details
View Map
Share
Follow
Downham Way

Thames Water are proposing to carry out Utility repair and maintenance works on Downham Way, Bromley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2024 at 09:56.

Between
3 and 28 Jun 2024
Details
View Map
Share
Follow
Ilderton Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Mar 2024 at 11:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Grove Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Grove Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 31 Jan 2024 at 03:27.

Thames Water logo
LONG TERM
Between
3 Jun and 16 Jul 2024
Details
View Map
Share
Follow
Janeway Place

Thames Water are proposing to carry out Disconnection or alteration of supply on Janeway Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 12:04.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Jun and 6 Jul 2024
Details
View Map
Share
Follow
Trafalgar Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Trafalgar Way, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 6 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Mar 2024 at 10:49.

UK Power Networks Eastern & London logo
LONG TERM
Between
3 Jun and 13 Jul 2024
Details
View Map
Share
Follow
Blackwall Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Blackwall Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Mar 2024 at 10:17.

City Of London Corporation logo
LONG TERM
Between
3 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Queen Victoria Street

City Of London Corporation are proposing to carry out Remedial works on Queen Victoria Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 8 Apr 2024 at 11:55.

UK Power Networks Eastern & London logo
Between
3 and 17 Jun 2024
Details
View Map
Share
Follow
Vere Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Vere Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2024 at 08:06.

Vodafone logo
Between
3 and 5 Jun 2024
Details
View Map
Share
Follow
Pentonville Road

Vodafone are proposing to carry out Utility asset works on Pentonville Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 6 Mar 2024 at 11:30.

Network Rail logo
Between
3 and 28 Jun 2024
Details
View Map
Share
Follow
Montfichet Road

Network Rail are proposing to carry out Works for Rail Purposes on Montfichet Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Feb 2024 at 12:33.

Thames Water logo
Between
4 and 6 Jun 2024
Details
View Map
Share
Follow
Bolton Crescent

Thames Water are proposing to carry out Utility asset works on Bolton Crescent, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Mar 2024 at 13:46.

Thames Water logo
Between
4 and 6 Jun 2024
Details
View Map
Share
Follow
Sylvan Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Sylvan Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 14:30.

UK Power Networks Eastern & London logo
Between
4 and 17 Jun 2024
Details
View Map
Share
Follow
Wardour Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Wardour Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:46.

Between
4 and 11 Jun 2024
Details
View Map
Share
Follow
Thayer Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Thayer Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2024 and could run through until 11 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Mar 2024 at 17:11.

Thames Water logo
LONG TERM
Between
5 Jun and 10 Oct 2024
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 10 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jul 2023 at 12:08.

Thames Water logo
LONG TERM
Between
5 Jun and 8 Sep 2024
Details
View Map
Share
Follow
Grosvenor Gardens

Thames Water are proposing to carry out Utility asset works on Grosvenor Gardens, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 8 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Jul 2023 at 12:08.

City Of Westminster logo
Between
5 and 19 Jun 2024
Details
View Map
Share
Follow
St George Street

City Of Westminster are proposing to carry out Highway improvement works on St George Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Apr 2024 at 15:47.

City Of Westminster logo
Between
5 and 7 Jun 2024
Details
View Map
Share
Follow
Kingsway

City Of Westminster are proposing to carry out Highway repair and maintenance works on Kingsway, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 28 Mar 2024 at 08:44.

London Borough Of Hackney logo
LONG TERM
Between
5 Jun and 7 Jul 2024
Details
View Map
Share
Follow
Lower Clapton Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Lower Clapton Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 14 Mar 2024 at 10:58.

London Borough Of Hackney logo
LONG TERM
Between
5 Jun and 7 Jul 2024
Details
View Map
Share
Follow
Lower Clapton Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Lower Clapton Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Apr 2024 at 10:16.

London Borough Of Southwark logo
Between
6 and 8 Jun 2024
Details
View Map
Share
Follow
Ayres Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Ayres Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Apr 2024 at 17:27.

London Borough Of Southwark logo
Between
6 and 8 Jun 2024
Details
View Map
Share
Follow
Union Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Union Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Apr 2024 at 17:21.

London Borough Of Southwark logo
Between
6 and 8 Jun 2024
Details
View Map
Share
Follow
Redcross Way

London Borough Of Southwark are proposing to carry out Highway improvement works on Redcross Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Apr 2024 at 17:08.

London Borough Of Southwark logo
Between
6 and 8 Jun 2024
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 2 Apr 2024 at 17:54.

London Borough Of Southwark logo
Between
7 and 9 Jun 2024
Details
View Map
Share
Follow
Deal Porter Square

London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2024 at 21:31.

Transport for London (TfL) logo
Between
7 and 10 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 14:22.

Transport for London (TfL) logo
Between
7 and 10 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 13:32.

Transport for London (TfL) logo
Between
7 and 10 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 14:30.

London Borough Of Southwark logo
Between
7 and 9 Jun 2024
Details
View Map
Share
Follow
Colombo Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Mar 2024 at 12:31.

London Borough Of Southwark logo
Between
7 and 9 Jun 2024
Details
View Map
Share
Follow
Colombo Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Mar 2024 at 12:37.

Transport for London (TfL) logo
Between
7 and 10 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:38.

Transport for London (TfL) logo
Between
7 and 10 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:52.

Transport for London (TfL) logo
Between
7 and 10 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:37.

Transport for London (TfL) logo
Between
7 and 10 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:49.

Transport for London (TfL) logo
Between
7 and 10 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:35.

Transport for London (TfL) logo
Between
7 and 10 Jun 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:50.

Thames Water logo
Between
7 and 24 Jun 2024
Details
View Map
Share
Follow
Bishopsgate

Thames Water are proposing to carry out Utility repair and maintenance works on Bishopsgate, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 15:19.

London Borough Of Southwark logo
Between
8 and 10 Jun 2024
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2024 at 17:25.

Virgin Media logo
Between
9 and 11 Jun 2024
Details
View Map
Share
Follow
Ashley Crescent

Virgin Media are proposing to carry out Utility asset works on Ashley Crescent, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 11 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 15 Mar 2024 at 08:44.

Thames Water logo
Between
9 and 13 Jun 2024
Details
View Map
Share
Follow
Strutton Ground

Thames Water are proposing to carry out New service connection on Strutton Ground, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 07:52.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 17 Oct 2024
Details
View Map
Share
Follow
Upper Grosvenor Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Grosvenor Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 15:15.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 17 Oct 2024
Details
View Map
Share
Follow
Brook Gate

Transport for London (TfL) are proposing to carry out Highway improvement works on Brook Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Mar 2024 at 17:56.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 17 Oct 2024
Details
View Map
Share
Follow
Upper Brook Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Brook Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Mar 2024 at 15:19.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 17 Oct 2024
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Mar 2024 at 17:55.

Transport for London (TfL) logo
LONG TERM
Between
9 Jun and 17 Oct 2024
Details
View Map
Share
Follow
Cumberland Gate

Transport for London (TfL) are proposing to carry out Highway improvement works on Cumberland Gate, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 October 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 24 Mar 2024 at 17:55.

London Borough Of Hackney logo
Between
9 and 13 Jun 2024
Details
View Map
Share
Follow
Plough Yard

London Borough Of Hackney are proposing to carry out Highway improvement works on Plough Yard, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 3 Apr 2024 at 12:41.

London Borough Of Hackney logo
Between
9 and 13 Jun 2024
Details
View Map
Share
Follow
Plough Yard

London Borough Of Hackney are proposing to carry out Highway improvement works on Plough Yard, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 10 Apr 2024 at 08:28.

London Borough Of Hackney logo
Between
9 and 13 Jun 2024
Details
View Map
Share
Follow
Hearn Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Hearn Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 3 Apr 2024 at 12:38.

London Borough Of Hackney logo
Between
9 and 13 Jun 2024
Details
View Map
Share
Follow
Hearn Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Hearn Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hackney on 10 Apr 2024 at 08:23.

Thames Water logo
Between
9 and 17 Jun 2024
Details
View Map
Share
Follow
Chance Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Chance Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 08:02.

Thames Water logo
Between
9 and 12 Jun 2024
Details
View Map
Share
Follow
Francis Street

Thames Water are proposing to carry out New service connection on Francis Street, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 12 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 10:12.

London Borough Of Southwark logo
Between
10 Jun and 9 Jul 2024
Details
View Map
Share
Follow
Fenham Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Fenham Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 9 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2024 at 13:54.

London Borough Of Southwark logo
Between
10 Jun and 9 Jul 2024
Details
View Map
Share
Follow
Friary Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Friary Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Mar 2024 at 13:54.

London Borough Of Southwark logo
LONG TERM
Between
10 Jun and 13 Jul 2024
Details
View Map
Share
Follow
Ambergate Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Ambergate Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 13 Mar 2024 at 08:04.

London Borough Of Southwark logo
Between
10 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Southwark Park Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southwark Park Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 15 Apr 2024 at 14:11.

Thames Water logo
Between
10 and 23 Jun 2024
Details
View Map
Share
Follow
Great Suffolk Street

Thames Water are proposing to carry out Utility repair and maintenance works on Great Suffolk Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 09:58.

Thames Water logo
Between
10 and 23 Jun 2024
Details
View Map
Share
Follow
Great Suffolk Street

Thames Water are proposing to carry out Utility repair and maintenance works on Great Suffolk Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 10:19.

Between
10 and 21 Jun 2024
Details
View Map
Share
Follow
Market Mews

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Market Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 10 Apr 2024 at 09:58.

Between
10 and 14 Jun 2024
Details
View Map
Share
Follow
Spring Gardens

Squire Energy are proposing to carry out Remedial works on Spring Gardens, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Squire Energy on 4 Mar 2024 at 09:13.

UK Power Networks Eastern & London logo
Between
10 and 15 Jun 2024
Details
View Map
Share
Follow
Fitzhardinge Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Fitzhardinge Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 15 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:06.

UK Power Networks Eastern & London logo
Between
10 and 19 Jun 2024
Details
View Map
Share
Follow
Grape Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Grape Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Apr 2024 at 08:33.

UK Power Networks Eastern & London logo
Between
10 and 19 Jun 2024
Details
View Map
Share
Follow
Grape Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Grape Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Apr 2024 at 16:45.

UK Power Networks Eastern & London logo
Between
10 and 21 Jun 2024
Details
View Map
Share
Follow
Bartholomew Close

UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Bartholomew Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 14:53.

Thames Water logo
Between
10 and 14 Jun 2024
Details
View Map
Share
Follow
Mirabelle Gardens

Thames Water are proposing to carry out New service connection on Mirabelle Gardens, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 10:05.

Thames Water logo
Between
11 and 13 Jun 2024
Details
View Map
Share
Follow
Holbein Mews

Thames Water are proposing to carry out Utility repair and maintenance works on Holbein Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 12:58.

UK Power Networks Eastern & London logo
Between
11 and 18 Jun 2024
Details
View Map
Share
Follow
Berwick Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Berwick Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 18 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Mar 2024 at 14:48.

Electricity Network Company logo
Between
12 and 26 Jun 2024
Details
View Map
Share
Follow
Pascal Street

Electricity Network Company are proposing to carry out Utility asset works on Pascal Street, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 17 Jan 2024 at 08:19.

City Of Westminster logo
Between
12 Jun and 2 Jul 2024
Details
View Map
Share
Follow
New Cavendish Street

City Of Westminster are proposing to carry out Highway improvement works on New Cavendish Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Mar 2024 at 10:04.

City Of Westminster logo
Between
12 Jun and 2 Jul 2024
Details
View Map
Share
Follow
New Cavendish Street

City Of Westminster are proposing to carry out Highway improvement works on New Cavendish Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Apr 2024 at 12:55.

Between
13 and 17 Jun 2024
Details
View Map
Share
Follow
Credon Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Credon Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Mar 2024 at 07:38.

Network Rail logo
Between
14 and 17 Jun 2024
Details
View Map
Share
Follow
Trundleys Road

Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Mar 2024 at 15:57.

London Borough Of Southwark logo
Between
14 and 16 Jun 2024
Details
View Map
Share
Follow
Deal Porter Square

London Borough Of Southwark are proposing to carry out Highway improvement works on Deal Porter Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 31 Mar 2024 at 21:37.

Thames Water logo
Between
14 and 16 Jun 2024
Details
View Map
Share
Follow
Carlisle Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Carlisle Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Mar 2024 at 15:27.

Thames Water logo
Between
14 and 17 Jun 2024
Details
View Map
Share
Follow
City Road

Thames Water are proposing to carry out Utility repair and maintenance works on City Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2024 at 12:00.

London Borough Of Southwark logo
Between
15 and 17 Jun 2024
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 05:02.

London Borough Of Southwark logo
Between
15 and 17 Jun 2024
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 05:09.

London Borough Of Southwark logo
Between
15 and 17 Jun 2024
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 05:09.

London Borough Of Southwark logo
Between
15 and 17 Jun 2024
Details
View Map
Share
Follow
Montague Close

London Borough Of Southwark are proposing to carry out Highway improvement works on Montague Close, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2024 and could run through until 17 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 05:09.

Thames Water logo
Between
15 Jun and 13 Jul 2024
Details
View Map
Share
Follow
Faringford Road

Thames Water are proposing to carry out Utility asset works on Faringford Road, Stratford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 June 2024 and could run through until 13 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Feb 2024 at 16:03.

London Borough Of Southwark logo
Between
16 and 21 Jun 2024
Details
View Map
Share
Follow
Sumner Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Sumner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Mar 2024 at 06:41.

Thames Water logo
Between
16 and 20 Jun 2024
Details
View Map
Share
Follow
Regeneration Road

Thames Water are proposing to carry out Utility repair and maintenance works on Regeneration Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 09:34.

London Borough Of Southwark logo
Between
16 and 22 Jun 2024
Details
View Map
Share
Follow
Grange Walk

London Borough Of Southwark are proposing to carry out Highway improvement works on Grange Walk, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 15 Mar 2024 at 14:37.

Transport for London (TfL) logo
Between
16 and 28 Jun 2024
Details
View Map
Share
Follow
Grosvenor Place

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Grosvenor Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Apr 2024 at 09:52.

Transport for London (TfL) logo
Between
16 and 28 Jun 2024
Details
View Map
Share
Follow
Park Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Park Lane, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Apr 2024 at 09:58.

Transport for London (TfL) logo
Between
16 and 28 Jun 2024
Details
View Map
Share
Follow
Hyde Park Corner

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hyde Park Corner, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Apr 2024 at 10:25.

Transport for London (TfL) logo
Between
16 and 28 Jun 2024
Details
View Map
Share
Follow
Duke Of Wellington Place

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Duke Of Wellington Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Apr 2024 at 09:43.

Transport for London (TfL) logo
Between
16 and 28 Jun 2024
Details
View Map
Share
Follow
Piccadilly

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Piccadilly, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Apr 2024 at 10:01.

Thames Water logo
Between
16 and 18 Jun 2024
Details
View Map
Share
Follow
Emerson Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Emerson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 08:30.

Thames Water logo
Between
16 and 18 Jun 2024
Details
View Map
Share
Follow
Emerson Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Emerson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 06:53.

Thames Water logo
Between
16 and 22 Jun 2024
Details
View Map
Share
Follow
Tant Avenue

Thames Water are proposing to carry out roadworks on Tant Avenue, Canning Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Mar 2024 at 14:02.

UK Power Networks Eastern & London logo
Between
16 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Manchester Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Manchester Square, Marylebone High Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:12.

Thames Water logo
Between
16 and 23 Jun 2024
Details
View Map
Share
Follow
Brady Street

Thames Water are proposing to carry out New service connection on Brady Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 06:45.

Thames Water logo
Between
16 and 23 Jun 2024
Details
View Map
Share
Follow
Brady Street

Thames Water are proposing to carry out New service connection on Brady Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 09:33.

Thames Water logo
Between
16 and 20 Jun 2024
Details
View Map
Share
Follow
Stokes Road

Thames Water are proposing to carry out New service connection on Stokes Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 15:15.

Thames Water logo
Between
16 and 20 Jun 2024
Details
View Map
Share
Follow
Stokes Road

Thames Water are proposing to carry out New service connection on Stokes Road, East Ham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 08:13.

Thames Water logo
Between
16 and 19 Jun 2024
Details
View Map
Share
Follow
Cheshire Street

Thames Water are proposing to carry out New service connection on Cheshire Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
17 Jun and 26 Jul 2024
Details
View Map
Share
Follow
Queenstown Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Queenstown Road, Wandsworth, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Feb 2024 at 09:22.

Thames Water logo
Between
17 and 23 Jun 2024
Details
View Map
Share
Follow
Penton Place

Thames Water are proposing to carry out Utility repair and maintenance works on Penton Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 13:10.

UK Power Networks Eastern & London logo
Between
17 Jun and 8 Jul 2024
Details
View Map
Share
Follow
Frankland Close

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Frankland Close, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 8 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Mar 2024 at 08:12.

UK Power Networks Eastern & London logo
Between
17 and 28 Jun 2024
Details
View Map
Share
Follow
Duke Street St James's

UK Power Networks Eastern & London are proposing to carry out New service connection on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2024 at 07:25.

UK Power Networks Eastern & London logo
Between
17 and 28 Jun 2024
Details
View Map
Share
Follow
Duke Street St James's

UK Power Networks Eastern & London are proposing to carry out New service connection on Duke Street St James's, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Apr 2024 at 09:20.

City Of Westminster logo
Between
17 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Charing Cross Road

City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 28 Mar 2024 at 08:52.

Thames Water logo
Between
17 and 26 Jun 2024
Details
View Map
Share
Follow
Cannon Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 08:37.

City Of Westminster logo
Between
17 and 19 Jun 2024
Details
View Map
Share
Follow
Brown Hart Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Brown Hart Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 19 Mar 2024 at 13:40.

City Of Westminster logo
Between
17 and 19 Jun 2024
Details
View Map
Share
Follow
Brown Hart Gardens

City Of Westminster are proposing to carry out Highway repair and maintenance works on Brown Hart Gardens, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 15 Apr 2024 at 12:55.

Vodafone logo
Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
Oxford Street

Vodafone are proposing to carry out Utility repair and maintenance works on Oxford Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 8 Apr 2024 at 11:02.

Thames Water logo
Between
17 and 20 Jun 2024
Details
View Map
Share
Follow
Gate Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Gate Street, Holborn And Covent Garden, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 15:12.

City Of Westminster logo
LONG TERM
Between
17 Jun and 22 Nov 2024
Details
View Map
Share
Follow
Great Titchfield Street

City Of Westminster are proposing to carry out Highway improvement works on Great Titchfield Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 22 November 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by City Of Westminster on 23 Mar 2024 at 13:59.

Murphy Power Distribution logo
LONG TERM
Between
17 Jun and 19 Jul 2024
Details
View Map
Share
Follow
East Road

Murphy Power Distribution are proposing to carry out Utility asset works on East Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 9 Apr 2024 at 13:26.

Murphy Power Distribution logo
LONG TERM
Between
17 Jun and 19 Jul 2024
Details
View Map
Share
Follow
Silbury Street

Murphy Power Distribution are proposing to carry out Utility asset works on Silbury Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 9 Apr 2024 at 13:33.

BT logo
Between
19 and 21 Jun 2024
Details
View Map
Share
Follow
Record Street

BT are proposing to carry out Utility asset works on Record Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Mar 2024 at 07:56.

City Of Westminster logo
Between
19 and 24 Jun 2024
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 20 Mar 2024 at 13:26.

Virgin Media logo
Between
19 Jun and 3 Jul 2024
Details
View Map
Share
Follow
Berners Street

Virgin Media are proposing to carry out Utility asset works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 18 Mar 2024 at 16:30.

Virgin Media logo
Between
19 Jun and 3 Jul 2024
Details
View Map
Share
Follow
Berners Street

Virgin Media are proposing to carry out Utility asset works on Berners Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Apr 2024 at 12:46.

Virgin Media logo
Between
19 Jun and 3 Jul 2024
Details
View Map
Share
Follow
Mortimer Street

Virgin Media are proposing to carry out Utility asset works on Mortimer Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 18 Mar 2024 at 16:35.

Virgin Media logo
Between
19 Jun and 3 Jul 2024
Details
View Map
Share
Follow
Mortimer Street

Virgin Media are proposing to carry out Utility asset works on Mortimer Street, West End, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 15 Apr 2024 at 12:50.

UK Power Networks Eastern & London logo
Between
19 and 23 Jun 2024
Details
View Map
Share
Follow
Whiston Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Whiston Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2024 at 17:31.

Sky UK logo
Between
20 and 22 Jun 2024
Details
View Map
Share
Follow
London Wall

Sky UK are proposing to carry out Utility repair and maintenance works on London Wall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2024 and could run through until 22 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sky UK on 25 Mar 2024 at 14:28.

UK Power Networks Eastern & London logo
LONG TERM
Between
21 Jun and 12 Aug 2024
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2024 and could run through until 12 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Apr 2024 at 12:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
21 Jun and 12 Aug 2024
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Surrey Quays Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2024 and could run through until 12 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2024 at 15:07.

City Of London Corporation logo
Between
22 and 25 Jun 2024
Details
View Map
Share
Follow
Eastcheap

City Of London Corporation are proposing to carry out Highway improvement works on Eastcheap, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of London Corporation on 25 Jan 2024 at 09:30.

Virgin Media logo
Between
23 and 25 Jun 2024
Details
View Map
Share
Follow
Jasper Road

Virgin Media are proposing to carry out Utility asset works on Jasper Road, Gipsy Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 19 Mar 2024 at 07:52.

Southern Gas Networks logo
Between
23 Jun and 17 Jul 2024
Details
View Map
Share
Follow
Sunderland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sunderland Road, Forest Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 17 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2024 at 09:45.

Southern Gas Networks logo
Between
23 Jun and 17 Jul 2024
Details
View Map
Share
Follow
Sunderland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sunderland Road, Forest Hill, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 17 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 3 Apr 2024 at 15:16.

London Borough Of Southwark logo
Between
23 and 28 Jun 2024
Details
View Map
Share
Follow
Sumner Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Sumner Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 16:45.

Virgin Media logo
Between
23 and 25 Jun 2024
Details
View Map
Share
Follow
Hamilton Place

Virgin Media are proposing to carry out Utility asset works on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 12 Mar 2024 at 10:50.

Virgin Media logo
Between
23 and 25 Jun 2024
Details
View Map
Share
Follow
Hamilton Place

Virgin Media are proposing to carry out Utility asset works on Hamilton Place, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 8 Apr 2024 at 14:38.

Virgin Media logo
Between
23 and 25 Jun 2024
Details
View Map
Share
Follow
Borough High Street

Virgin Media are proposing to carry out Utility asset works on Borough High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 19 Mar 2024 at 07:16.

Virgin Media logo
Between
23 and 25 Jun 2024
Details
View Map
Share
Follow
Borough High Street

Virgin Media are proposing to carry out Utility asset works on Borough High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Apr 2024 at 13:24.

Southern Gas Networks logo
Between
23 and 27 Jun 2024
Details
View Map
Share
Follow
America Street

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on America Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 8 Apr 2024 at 09:56.

Virgin Media logo
Between
23 and 25 Jun 2024
Details
View Map
Share
Follow
Johnson Street

Virgin Media are proposing to carry out Utility asset works on Johnson Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 15 Mar 2024 at 09:17.

Thames Water logo
Between
23 and 27 Jun 2024
Details
View Map
Share
Follow
Dean Street

Thames Water are proposing to carry out New service connection on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Mar 2024 at 13:15.

London Borough Of Southwark logo
LONG TERM
Between
24 Jun and 12 Oct 2024
Details
View Map
Share
Follow
Knatchbull Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Knatchbull Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.

London Borough Of Southwark logo
LONG TERM
Between
24 Jun and 12 Oct 2024
Details
View Map
Share
Follow
Station Terrace

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Station Terrace, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.

London Borough Of Southwark logo
LONG TERM
Between
24 Jun and 12 Oct 2024
Details
View Map
Share
Follow
Camberwell Station Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 26 Mar 2024 at 09:36.

London Borough Of Southwark logo
LONG TERM
Between
24 Jun and 12 Oct 2024
Details
View Map
Share
Follow
Camberwell New Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell New Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 12 October 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 25 Mar 2024 at 16:28.

London Borough Of Southwark logo
LONG TERM
Between
24 Jun and 12 Oct 2024
Details
View Map
Share
Camberwell New Road

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Camberwell New Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 June 2024 and run through until 12 October 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 09:55.

London Borough Of Southwark logo
LONG TERM
Between
24 Jun and 24 Jul 2024
Details
View Map
Share
Follow
Southampton Way

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Southampton Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 24 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 10 Apr 2024 at 14:52.

Thames Tideway Tunnel logo
LONG TERM
Between
24 Jun and 30 Sep 2024
Details
View Map
Share
Follow
Deptford Church Street

Thames Tideway Tunnel are proposing to carry out Highway improvement works on Deptford Church Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 30 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 13 Mar 2024 at 16:21.

Thames Tideway Tunnel logo
LONG TERM
Between
24 Jun and 30 Sep 2024
Details
View Map
Share
Follow
Creek Road

Thames Tideway Tunnel are proposing to carry out roadworks on Creek Road, Deptford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 15 Mar 2024 at 06:58.

Transport for London (TfL) logo
Between
24 Jun and 22 Jul 2024
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Mar 2024 at 14:29.

Thames Water logo
Between
24 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Lucey Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lucey Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 1 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 14:01.

Thames Water logo
Between
24 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Thurland Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Thurland Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 1 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 13:53.

Thames Water logo
Between
24 and 28 Jun 2024
Details
View Map
Share
Follow
Cannon Street Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cannon Street Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Mar 2024 at 14:28.

UK Power Networks Eastern & London logo
Between
24 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Morwell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 09:36.

UK Power Networks Eastern & London logo
Between
24 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Morwell Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Apr 2024 at 10:09.

Virgin Media logo
Between
26 Jun and 10 Jul 2024
Details
View Map
Share
Follow
Hans Place

Virgin Media are proposing to carry out Utility asset works on Hans Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 Mar 2024 at 16:41.

Between
26 Jun and 10 Jul 2024
Details
View Map
Share
Follow
Richard House Drive

London Borough Of Newham are proposing to carry out Highway improvement works on Richard House Drive, West Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 28 Mar 2024 at 19:06.

BT logo
Between
26 and 28 Jun 2024
Details
View Map
Share
Follow
Mason's Arms Mews

BT are proposing to carry out New service connection on Mason's Arms Mews, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Mar 2024 at 12:15.

London Borough Of Southwark logo
Between
27 and 30 Jun 2024
Details
View Map
Share
Follow
Jasper Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Jasper Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 15 Mar 2024 at 12:27.

Thames Water logo
Between
27 and 30 Jun 2024
Details
View Map
Share
Follow
Euston Road

Thames Water are proposing to carry out Utility repair and maintenance works on Euston Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Mar 2024 at 16:41.

Transport for London (TfL) logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 14:23.

Transport for London (TfL) logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 13:43.

Transport for London (TfL) logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Apr 2024 at 14:31.

Transport for London (TfL) logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:43.

Transport for London (TfL) logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:53.

Transport for London (TfL) logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:41.

Transport for London (TfL) logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:49.

Transport for London (TfL) logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:40.

Transport for London (TfL) logo
Between
28 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:51.

UK Power Networks Eastern & London logo
Between
28 Jun and 2 Jul 2024
Details
View Map
Share
Follow
Pritchards Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Pritchards Road, Hackney, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Feb 2024 at 17:38.

Between
30 Jun and 2 Jul 2024
Details
View Map
Share
Follow
Thorne Road

G. Network Communications are proposing to carry out Utility asset works on Thorne Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 2 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 2 Apr 2024 at 12:51.

Thames Water logo
Between
30 Jun and 7 Jul 2024
Details
View Map
Share
Follow
Billiter Street

Thames Water are proposing to carry out New service connection on Billiter Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Apr 2024 at 08:38.

Thames Water logo
Between
30 Jun and 4 Jul 2024
Details
View Map
Share
Follow
New Bond Street

Thames Water are proposing to carry out New service connection on New Bond Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 13:35.

Thames Water logo
LONG TERM
Between
1 Jul and 7 Sep 2024
Details
View Map
Share
Follow
Tarbert Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Tarbert Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 7 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Dec 2023 at 12:17.

Thames Water logo
LONG TERM
Between
1 Jul 2024 and 30 Oct 2025
Details
View Map
Share
Follow
Dylways

Thames Water are proposing to carry out Disconnection or alteration of supply on Dylways, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 30 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 3 Apr 2024 at 14:58.

Thames Water logo
LONG TERM
Between
1 Jul 2024 and 7 Feb 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Gresham Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 12:34.

Thames Water logo
Between
1 and 29 Jul 2024
Details
View Map
Share
Follow
Moreton Place

Thames Water are proposing to carry out Utility repair and maintenance works on Moreton Place, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 08:19.

Thames Water logo
Between
1 and 29 Jul 2024
Details
View Map
Share
Follow
Moreton Place

Thames Water are proposing to carry out Utility repair and maintenance works on Moreton Place, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 08:42.

Southern Gas Networks logo
LONG TERM
Between
1 Jul and 20 Aug 2024
Details
View Map
Share
Follow
Clements Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Clements Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 20 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Apr 2024 at 11:06.

Southern Gas Networks logo
LONG TERM
Between
1 Jul and 20 Aug 2024
Details
View Map
Share
Follow
Storks Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Storks Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 20 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Apr 2024 at 10:12.

City Of Westminster logo
LONG TERM
Between
1 Jul and 4 Aug 2024
Details
View Map
Share
Follow
Rochester Row

City Of Westminster are proposing to carry out Highway repair and maintenance works on Rochester Row, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Apr 2024 at 10:08.

City Of Westminster logo
LONG TERM
Between
1 Jul and 4 Aug 2024
Details
View Map
Share
Follow
Rochester Row

City Of Westminster are proposing to carry out Highway repair and maintenance works on Rochester Row, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 10 Apr 2024 at 07:41.

City Of Westminster logo
LONG TERM
Between
1 Jul and 4 Aug 2024
Details
View Map
Share
Follow
Greycoat Place

City Of Westminster are proposing to carry out Highway improvement works on Greycoat Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 8 Apr 2024 at 12:23.

City Of Westminster logo
LONG TERM
Between
1 Jul and 4 Aug 2024
Details
View Map
Share
Follow
Greycoat Place

City Of Westminster are proposing to carry out Highway improvement works on Greycoat Place, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 9 Apr 2024 at 08:48.

Thames Water logo
Between
1 and 4 Jul 2024
Details
View Map
Share
Follow
Parker Street

Thames Water are proposing to carry out New service connection on Parker Street, North Woolwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:08.

UK Power Networks Eastern & London logo
Between
1 and 13 Jul 2024
Details
View Map
Share
Follow
Baffin Way

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Baffin Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Mar 2024 at 10:44.

City Of London Corporation logo
LONG TERM
Between
1 Jul 2024 and 30 Apr 2026
Details
View Map
Share
Follow
King William Street

City Of London Corporation are proposing to carry out Highway repair and maintenance works on King William Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 30 April 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 28 Mar 2024 at 15:22.

Between
1 and 12 Jul 2024
Details
View Map
Share
Follow
Exeter Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Exeter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Apr 2024 at 09:34.

City Of Westminster logo
LONG TERM
Between
1 Jul and 2 Aug 2024
Details
View Map
Share
Follow
Davies Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Davies Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 2 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 4 Apr 2024 at 11:39.

Between
1 and 19 Jul 2024
Details
View Map
Share
Follow
Cavendish Square

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Cavendish Square, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Mar 2024 at 11:23.

Between
1 and 19 Jul 2024
Details
View Map
Share
Follow
Margaret Street

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Margaret Street, West End, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 19 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 25 Mar 2024 at 11:35.

Thames Water logo
Between
1 and 4 Jul 2024
Details
View Map
Share
Follow
Rushmore Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rushmore Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 14:25.

UK Power Networks Eastern & London logo
Between
2 and 5 Jul 2024
Details
View Map
Share
Follow
Hinde Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Hinde Street, Marylebone High Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 14:11.

Thames Water logo
Between
2 and 4 Jul 2024
Details
View Map
Share
Follow
Chisenhale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chisenhale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 11:12.

Thames Water logo
Between
2 and 4 Jul 2024
Details
View Map
Share
Follow
Chisenhale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Chisenhale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 09:07.

London Borough Of Southwark logo
LONG TERM
Between
3 Jul and 8 Aug 2024
Details
View Map
Share
Follow
Bianca Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Bianca Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 8 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Apr 2024 at 10:46.

London Borough Of Southwark logo
LONG TERM
Between
3 Jul and 8 Aug 2024
Details
View Map
Share
Follow
Glengall Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Glengall Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 8 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Apr 2024 at 09:49.

London Borough Of Southwark logo
Between
3 and 5 Jul 2024
Details
View Map
Share
Follow
Southwark Bridge Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Southwark Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 10:41.

London Borough Of Southwark logo
Between
3 and 5 Jul 2024
Details
View Map
Share
Follow
Southwark Bridge Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Southwark Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 10:41.

London Borough Of Southwark logo
Between
3 and 5 Jul 2024
Details
View Map
Share
Follow
Southwark Bridge Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Southwark Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 10:41.

London Borough Of Southwark logo
Between
3 and 5 Jul 2024
Details
View Map
Share
Follow
Southwark Bridge Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Southwark Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 10:42.

London Borough Of Southwark logo
LONG TERM
Between
3 Jul and 8 Aug 2024
Details
View Map
Share
Follow
Park Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Park Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 8 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Apr 2024 at 15:12.

Virgin Media logo
Between
3 and 5 Jul 2024
Details
View Map
Share
Follow
Dean Street

Virgin Media are proposing to carry out Utility asset works on Dean Street, West End, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Virgin Media on 21 Mar 2024 at 15:47.

UK Power Networks Eastern & London logo
Between
3 and 30 Jul 2024
Details
View Map
Share
Follow
Pritchards Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Pritchards Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Mar 2024 at 18:02.

Transport for London (TfL) logo
Between
4 and 9 Jul 2024
Details
View Map
Share
Follow
Sidcup Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sidcup Road, Eltham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 10:11.

ESP Electricity logo
Between
5 and 18 Jul 2024
Details
View Map
Share
Follow
Stepney Green

ESP Electricity are proposing to carry out Utility asset works on Stepney Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 11 Apr 2024 at 09:33.

ESP Electricity logo
Between
5 and 18 Jul 2024
Details
View Map
Share
Follow
Stepney Green

ESP Electricity are proposing to carry out Utility asset works on Stepney Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 11 Apr 2024 at 14:33.

ESP Electricity logo
Between
5 and 18 Jul 2024
Details
View Map
Share
Follow
Stepney Green

ESP Electricity are proposing to carry out Utility asset works on Stepney Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 15 Apr 2024 at 10:52.

ESP Electricity logo
Between
5 and 19 Jul 2024
Details
View Map
Share
Follow
Hayfield Passage

ESP Electricity are proposing to carry out Utility asset works on Hayfield Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 11 Apr 2024 at 09:28.

ESP Electricity logo
Between
5 and 19 Jul 2024
Details
View Map
Share
Follow
Hayfield Passage

ESP Electricity are proposing to carry out Utility asset works on Hayfield Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 11 Apr 2024 at 14:28.

ESP Electricity logo
Between
5 and 19 Jul 2024
Details
View Map
Share
Follow
Hayfield Passage

ESP Electricity are proposing to carry out Utility asset works on Hayfield Passage, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ESP Electricity on 15 Apr 2024 at 10:52.

Southern Gas Networks logo
Between
7 and 11 Jul 2024
Details
View Map
Share
Follow
Kellett Road

Southern Gas Networks are proposing to carry out New service connection on Kellett Road, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Apr 2024 at 10:54.

London Borough Of Wandsworth logo
Between
7 and 9 Jul 2024
Details
View Map
Share
Follow
Taybridge Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Taybridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 12 Apr 2024 at 07:58.

London Borough Of Wandsworth logo
Between
7 and 9 Jul 2024
Details
View Map
Share
Follow
Taybridge Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Taybridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 12 Apr 2024 at 08:09.

Thames Water logo
Between
7 and 9 Jul 2024
Details
View Map
Share
Follow
The Grange

Thames Water are proposing to carry out Utility repair and maintenance works on The Grange, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 9 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 12:49.

Cadent Gas logo
Between
7 and 29 Jul 2024
Details
View Map
Share
Follow
Abingdon Street

Cadent Gas are proposing to carry out Utility asset works on Abingdon Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Apr 2024 at 11:00.

Cadent Gas logo
Between
7 and 29 Jul 2024
Details
View Map
Share
Follow
Abingdon Street

Cadent Gas are proposing to carry out Utility asset works on Abingdon Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 06:09.

Cadent Gas logo
Between
7 and 15 Jul 2024
Details
View Map
Share
Follow
White Horse Road

Cadent Gas are proposing to carry out Utility asset works on White Horse Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 15 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 14:30.

Thames Water logo
Between
7 and 9 Jul 2024
Details
View Map
Share
Follow
Midland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Midland Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 11:53.

Thames Water logo
Between
7 and 9 Jul 2024
Details
View Map
Share
Follow
Midland Road

Thames Water are proposing to carry out Utility repair and maintenance works on Midland Road, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 13:18.

BT logo
Between
7 and 11 Jul 2024
Details
View Map
Share
Follow
Shepherds Lane

BT are proposing to carry out Utility repair and maintenance works on Shepherds Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Apr 2024 at 19:07.

Thames Water logo
LONG TERM
Between
8 Jul and 22 Nov 2024
Details
View Map
Share
Follow
Heber Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Heber Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 22 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Feb 2024 at 16:30.

Thames Water logo
LONG TERM
Between
8 Jul and 20 Aug 2024
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 20 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Feb 2024 at 15:54.

Thames Water logo
LONG TERM
Between
8 Jul and 20 Aug 2024
Details
View Map
Share
Follow
Townley Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Townley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 20 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Feb 2024 at 15:48.

London Borough Of Southwark logo
LONG TERM
Between
8 Jul and 4 Oct 2024
Details
View Map
Share
Follow
Knatchbull Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Knatchbull Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 4 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 10:15.

Vodafone logo
Between
8 and 12 Jul 2024
Details
View Map
Share
Follow
Harton Street

Vodafone are proposing to carry out Utility repair and maintenance works on Harton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 8 Apr 2024 at 12:45.

Vodafone logo
Between
8 and 12 Jul 2024
Details
View Map
Share
Follow
Harton Street

Vodafone are proposing to carry out Utility repair and maintenance works on Harton Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Vodafone on 8 Apr 2024 at 13:41.

London Borough Of Southwark logo
LONG TERM
Between
8 Jul and 4 Nov 2024
Details
View Map
Share
Follow
Station Terrace

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Station Terrace, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 10:20.

London Borough Of Southwark logo
LONG TERM
Between
8 Jul and 4 Nov 2024
Details
View Map
Share
Follow
Camberwell Station Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 4 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 10:06.

London Borough Of Southwark logo
LONG TERM
Between
8 Jul and 4 Nov 2024
Details
View Map
Share
Follow
Camberwell New Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell New Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 4 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 16 Apr 2024 at 10:02.

Thames Water logo
Between
8 and 10 Jul 2024
Details
View Map
Share
Follow
Ormonde Gate

Thames Water are proposing to carry out Utility repair and maintenance works on Ormonde Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 16:39.

Thames Water logo
Between
8 and 10 Jul 2024
Details
View Map
Share
Follow
Ormonde Gate

Thames Water are proposing to carry out Utility repair and maintenance works on Ormonde Gate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 17:41.

UK Power Networks Eastern & London logo
Between
8 and 22 Jul 2024
Details
View Map
Share
Follow
Banyard Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Banyard Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Mar 2024 at 11:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Jul and 16 Aug 2024
Details
View Map
Share
Follow
Surrey Quays Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Surrey Quays Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 16 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2024 at 06:25.

UK Power Networks Eastern & London logo
Between
8 and 27 Jul 2024
Details
View Map
Share
Follow
Prestons Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Prestons Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 27 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Mar 2024 at 10:44.

LONG TERM
Between
8 Jul and 26 Aug 2024
Details
View Map
Share
Follow
Green Street

London Borough Of Newham are proposing to carry out Highway improvement works on Green Street, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 26 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 9 Apr 2024 at 07:57.

LONG TERM
Between
8 Jul and 26 Aug 2024
Details
View Map
Share
Follow
Green Street

London Borough Of Newham are proposing to carry out Highway improvement works on Green Street, Forest Gate, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 26 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 16 Apr 2024 at 08:52.

London Borough Of Wandsworth logo
Between
9 and 11 Jul 2024
Details
View Map
Share
Follow
Forthbridge Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Forthbridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 12 Apr 2024 at 07:39.

London Borough Of Wandsworth logo
Between
9 and 11 Jul 2024
Details
View Map
Share
Follow
Forthbridge Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Forthbridge Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 12 Apr 2024 at 08:06.

Thames Water logo
Between
9 and 11 Jul 2024
Details
View Map
Share
Follow
Hermitage Wall

Thames Water are proposing to carry out Utility repair and maintenance works on Hermitage Wall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 14:39.

Thames Water logo
Between
9 and 11 Jul 2024
Details
View Map
Share
Follow
Gray's Inn Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gray's Inn Road, King's Cross, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 09:38.

BT logo
Between
9 and 12 Jul 2024
Details
View Map
Share
Follow
Granary Street

BT are proposing to carry out Utility asset works on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Apr 2024 at 09:19.

Thames Water logo
Between
9 and 11 Jul 2024
Details
View Map
Share
Follow
Rothbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rothbury Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 14:06.

Thames Water logo
Between
9 and 11 Jul 2024
Details
View Map
Share
Follow
Rothbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rothbury Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 09:09.

Between
10 and 30 Jul 2024
Details
View Map
Share
Follow
Woolmore Street

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Woolmore Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 10 Apr 2024 at 14:30.

Between
10 and 30 Jul 2024
Details
View Map
Share
Follow
Robin Hood Lane

London Borough Of Tower Hamlets are proposing to carry out Highway improvement works on Robin Hood Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Tower Hamlets on 15 Apr 2024 at 10:46.

Between
11 and 22 Jul 2024
Details
View Map
Share
Follow
Richard House Drive

London Borough Of Newham are proposing to carry out Highway improvement works on Richard House Drive, West Beckton, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Newham on 12 Apr 2024 at 11:18.

Transport for London (TfL) logo
Between
12 and 15 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, Greenwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 00:25.

Transport for London (TfL) logo
Between
12 and 15 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Apr 2024 at 13:05.

Transport for London (TfL) logo
Between
12 and 15 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Apr 2024 at 06:46.

Transport for London (TfL) logo
Between
12 and 15 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:47.

Transport for London (TfL) logo
Between
12 and 15 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:54.

Transport for London (TfL) logo
Between
12 and 15 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:47.

Transport for London (TfL) logo
Between
12 and 15 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:50.

Transport for London (TfL) logo
Between
12 and 15 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 2 Apr 2024 at 15:46.

Transport for London (TfL) logo
Between
12 and 15 Jul 2024
Details
View Map
Share
Follow
Blackwall Tunnel Northern Approach

Transport for London (TfL) are proposing to carry out Highway improvement works on Blackwall Tunnel Northern Approach, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 July 2024 and could run through until 15 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 3 Apr 2024 at 11:51.

Thames Water logo
Between
14 and 18 Jul 2024
Details
View Map
Share
Follow
Jerningham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Jerningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 13:42.

Thames Water logo
Between
14 and 18 Jul 2024
Details
View Map
Share
Follow
Jerningham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Jerningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 13:44.

Thames Water logo
Between
14 and 18 Jul 2024
Details
View Map
Share
Follow
Jerningham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Jerningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 13:49.

Thames Water logo
Between
14 and 18 Jul 2024
Details
View Map
Share
Follow
Jerningham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Jerningham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 13:56.

UK Power Networks Eastern & London logo
Between
14 and 27 Jul 2024
Details
View Map
Share
Follow
Victoria Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 27 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Apr 2024 at 15:10.

Thames Water logo
Between
14 and 18 Jul 2024
Details
View Map
Share
Follow
Henriques Street

Thames Water are proposing to carry out New service connection on Henriques Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 13:30.

Thames Water logo
Between
14 and 18 Jul 2024
Details
View Map
Share
Follow
Henriques Street

Thames Water are proposing to carry out New service connection on Henriques Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 08:39.

Thames Water logo
LONG TERM
Between
14 Jul and 20 Dec 2024
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 07:45.

Thames Water logo
LONG TERM
Between
14 Jul and 20 Dec 2024
Details
View Map
Share
Follow
Manor Road

Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 15:39.


Roadworks Map near to SE16 2QS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Apr 2024 10:14
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.

Roadworks Listing near to SE16 2QS (234 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Lewisham logo
URGENT
  
CONCORDE WAY 
(0.1 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 12 Apr 2024 08:28
(Scheduled: 12 Apr 2024 - 16 Apr 2024)
0.1
Details
Share
Follow
2
London Borough Of Lewisham logo
URGENT
  
CONCORDE WAY 
(0.1 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 12 Apr 2024 08:28
(Scheduled: 12 Apr 2024 - 16 Apr 2024)
0.1
Details
Share
Follow
3
London Borough Of Southwark logo
MAJOR
  
WARNDON STREET 
(0.1 miles)
London Borough Of Southwark
Highway improvement works - Carriageway - Road closure
In Progress
Since: 6 Jul 2023 23:00
(Scheduled: 6 Jul 2023 - 24 Jul 2024)
0.1
Details
Share
Follow
4
London Borough Of Southwark logo
URGENT
  
ROTHERHITHE NEW ROAD 
(0.1 miles)
London Borough Of Southwark
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 8 Apr 2024 13:22
(Scheduled: 8 Apr 2024 - 10 May 2024)
0.1
Details
Share
Follow
5
London Borough Of Lewisham logo
TRUNDLEYS ROAD 
(0.2 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 12 Apr 2024 08:43
(Scheduled: 11 Apr 2024 - 16 Apr 2024)
0.2
Details
Share
Follow
6
London Borough Of Lewisham logo
TRUNDLEYS ROAD 
(0.2 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 11 Apr 2024 - 16 Apr 2024
0.2
Details
Share
Follow
7
London Borough Of Lewisham logo
TRUNDLEYS ROAD 
(0.2 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 11 Apr 2024 - 16 Apr 2024
0.2
Details
Share
Follow
8
London Borough Of Lewisham logo
TRUNDLEYS ROAD 
(0.2 miles)
London Borough Of Lewisham
Highway repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 11 Apr 2024 - 16 Apr 2024
0.2
Details
Share
Follow
9
London Borough Of Southwark logo
URGENT
  
LOWER ROAD 
(0.3 miles)
London Borough Of Southwark
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 30 Jan 2024 12:12
(Scheduled: 30 Jan 2024 - 29 Apr 2024)
0.3
Details
Share
Follow
10
London Borough Of Southwark logo
MAJOR
  
LOWER ROAD 
(0.3 miles)
London Borough Of Southwark
Highway improvement works - Carriageway - No carriageway incursion
In Progress
Since: 11 Jul 2023 23:00
(Scheduled: 11 Jul 2023 - 13 Jul 2024)
0.3
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data