ROADWORKS SUMMARY
The Green, CHESTERFIELD, S41 0JU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Green, S41 0JU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to The Green, CHESTERFIELD, S41 0JU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Green are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Derbyshire County Council logo
LONG TERM
Until
6 Jul 2025
Details
View Map
Share
Follow
Station Back Lane

Derbyshire County Council are carrying out roadworks on Station Back Lane, Chesterfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 07:10 and could run through until 6 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 16 Oct 2023 at 08:23.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Hasland Road

Cadent Gas are carrying out Utility asset works on Hasland Road, Hasland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 February 2024 at 07:30 and could run through until 26 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Feb 2024 at 07:30.

Derbyshire County Council logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Ashford Avenue

Derbyshire County Council are carrying out roadworks on Ashford Avenue, North Wingfield, Chesterfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 February 2024 at 09:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 19 Feb 2024 at 09:22.

Derbyshire County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Harris Way

Derbyshire County Council are proposing to carry out Highway improvement works on Harris Way, Clay Cross.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Derbyshire County Council on 19 Feb 2024 at 10:29.

Cadent Gas logo
LONG TERM
Until
6 May 2024
Details
View Map
Share
Follow
St Johns Road

Cadent Gas are carrying out Utility asset works on St Johns Road, Staveley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 13:25 and could run through until 6 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2024 at 13:26.

Derbyshire County Council logo
LONG TERM
Between
2 Apr and 12 May 2024
Details
View Map
Share
Follow
Farndale Road

Derbyshire County Council are proposing to carry out Highway improvement works on Farndale Road, Staveley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 18 Mar 2024 at 14:57.

Derbyshire County Council logo
Between
3 Apr and 1 May 2024
Details
View Map
Share
Follow
Linacre Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Linacre Road, Holme Hall, Chesterfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 1 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Derbyshire County Council on 4 Mar 2024 at 12:59.

Derbyshire County Council logo
LONG TERM
Until
12 Jun 2024
Details
View Map
Share
Follow
Church Way

Derbyshire County Council are carrying out Highway improvement works on Church Way, Chesterfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 09:15 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 8 Apr 2024 at 09:20.

Derbyshire County Council logo
LONG TERM
Between
8 Apr and 2 Aug 2024
Details
View Map
Share
Follow
Narrowleys Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Narrowleys Lane, Ashover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 2 Apr 2024 at 14:53.

Cadent Gas logo
LONG TERM
Until
19 May 2024
Details
View Map
Share
Follow
Middlecroft Road

Cadent Gas are carrying out Utility asset works on Middlecroft Road, Staveley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 10:00 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 10:30.

Derbyshire County Council logo
LONG TERM
Between
15 Apr and 30 Aug 2024
Details
View Map
Share
Follow
Newbold Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Newbold Road, Newbold.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
15 Apr and 30 Aug 2024
Details
View Map
Share
Follow
Blacksmith Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Blacksmith Lane, Calow, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
15 Apr and 30 Aug 2024
Details
View Map
Share
Follow
Brockwell Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Brockwell Lane, Brockwell, Chesterfield.

These works are categorised as Major.

The works will start on or after 15 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 16:30.

Cadent Gas logo
LONG TERM
Until
22 May 2024
Details
View Map
Share
Follow
Manor Road

Cadent Gas are carrying out Utility asset works on Manor Road, Brimington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 09:00 and could run through until 22 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 09:39.

Derbyshire County Council logo
LONG TERM
Between
15 Apr and 30 Aug 2024
Details
View Map
Share
Follow
Whittington Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Whittington Lane, Unstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
15 Apr and 30 Aug 2024
Details
View Map
Share
Follow
School Hill

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on School Hill, Cutthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
15 Apr and 30 Aug 2024
Details
View Map
Share
Follow
South Terrace

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on South Terrace, Cutthorpe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
15 Apr and 30 Aug 2024
Details
View Map
Share
Follow
South Street North

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on South Street North, New Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
15 Apr and 30 Aug 2024
Details
View Map
Share
Follow
Unstone Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Unstone Road, Old Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
15 Apr and 30 Aug 2024
Details
View Map
Share
Follow
Springvale Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Springvale Road, Danesmoor, Clay Cross.

These works are categorised as Major.

The works will start on or after 15 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 16:30.

Derbyshire County Council logo
LONG TERM
Between
15 Apr and 30 Aug 2024
Details
View Map
Share
Follow
Chesterfield Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Doe Lea.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 27 Mar 2024 at 16:30.

Cadent Gas logo
LONG TERM
Between
21 Apr and 16 Jun 2024
Details
View Map
Share
Follow
Main Road

Cadent Gas are proposing to carry out Utility asset works on Main Road, Stretton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 16 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 14:32.

Cadent Gas logo
Until
11 May 2024
Details
View Map
Share
Follow
Chander Hill Lane

Cadent Gas are carrying out Utility asset works on Chander Hill Lane, Chander Hill, Holymoorside.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 April 2024 at 12:45 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 12:54.

Derbyshire County Council logo
LONG TERM
Between
22 Apr and 2 Aug 2024
Details
View Map
Share
Follow
Unnamed Section Of B6014 From Junction With B6036 To South Hill

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Unnamed Section Of B6014 From Junction With B6036 To South Hill, Woolley Moor, Alfreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 2 Apr 2024 at 14:50.

Derbyshire County Council logo
LONG TERM
Between
22 Apr and 2 Aug 2024
Details
View Map
Share
Follow
Unnamed Section Of B6014 From A61 At Stretton To Junction With B6036

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Unnamed Section Of B6014 From A61 At Stretton To Junction With B6036, Stretton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 2 Apr 2024 at 14:49.

Yorkshire Water logo
LONG TERM
Between
22 Apr and 23 Dec 2024
Details
View Map
Share
Follow
Station Lane

Yorkshire Water are proposing to carry out New service connection on Station Lane, Old Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 23 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 20 Mar 2024 at 10:06.

Derbyshire County Council logo
LONG TERM
Between
22 Apr and 2 Aug 2024
Details
View Map
Share
Follow
Hockley Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Hockley Lane, Milltown, Ashover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 2 Apr 2024 at 14:51.

Cadent Gas logo
Between
24 Apr and 12 May 2024
Details
View Map
Share
Follow
Cotton Mill Hill

Cadent Gas are proposing to carry out Utility asset works on Cotton Mill Hill, Holymoorside.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 15:30.

Cadent Gas logo
LONG TERM
Between
28 Apr and 23 Jun 2024
Details
View Map
Share
Follow
Pennywell Drive

Cadent Gas are proposing to carry out Utility asset works on Pennywell Drive, Holymoorside.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 08:42.

Derbyshire County Council logo
Between
28 Apr and 26 May 2024
Details
View Map
Share
Follow
Knifesmithgate

Derbyshire County Council are proposing to carry out Remedial works on Knifesmithgate, Chesterfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 26 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 16 Apr 2024 at 10:25.

Derbyshire County Council logo
Between
29 Apr and 19 May 2024
Details
View Map
Share
Follow
Chesterfield Road

Derbyshire County Council are proposing to carry out Highway improvement works on Chesterfield Road, Brimington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 19 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Derbyshire County Council on 26 Mar 2024 at 10:35.

Derbyshire County Council logo
Between
2 and 30 May 2024
Details
View Map
Share
Follow
Linacre Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Linacre Road, Holme Hall, Chesterfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 30 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Derbyshire County Council on 29 Mar 2024 at 06:41.

Cadent Gas logo
LONG TERM
Between
6 May and 17 Jun 2024
Details
View Map
Share
Follow
Fern Avenue

Cadent Gas are proposing to carry out Utility asset works on Fern Avenue, Staveley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 08:16.

Cadent Gas logo
Between
12 May and 2 Jun 2024
Details
View Map
Share
Follow
Newbridge Lane

Cadent Gas are proposing to carry out Utility asset works on Newbridge Lane, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Apr 2024 at 06:59.

Cadent Gas logo
Between
12 and 28 May 2024
Details
View Map
Share
Follow
Layton Drive

Cadent Gas are proposing to carry out Utility asset works on Layton Drive, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 28 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 08:41.

BT logo
Between
15 and 17 May 2024
Details
View Map
Share
Follow
Longedge Lane

BT are proposing to carry out Utility repair and maintenance works on Longedge Lane, Wingerworth, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 17 May 2024. The works will impact the verge only.

This roadwork event was last updated by BT on 5 Mar 2024 at 14:20.

Derbyshire County Council logo
Between
16 and 21 May 2024
Details
View Map
Share
Follow
Chesterfield Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Chesterfield Road, Doe Lea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 10 Apr 2024 at 15:30.

Derbyshire County Council logo
Between
16 and 30 May 2024
Details
View Map
Share
Follow
Park Road

Derbyshire County Council are proposing to carry out Section 50 on Park Road, Holmewood, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Derbyshire County Council on 18 Apr 2024 at 10:03.

Derbyshire County Council logo
Between
17 and 22 May 2024
Details
View Map
Share
Follow
Jawbones Hill

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Jawbones Hill, St Augustines, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 12 Feb 2024 at 13:41.

Derbyshire County Council logo
Between
17 and 19 May 2024
Details
View Map
Share
Follow
Nethermoor Road

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Nethermoor Road, New Tupton, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 12 Apr 2024 at 10:22.

Cadent Gas logo
Between
19 May and 13 Jun 2024
Details
View Map
Share
Follow
Dade Avenue

Cadent Gas are proposing to carry out Utility asset works on Dade Avenue, Inkersall.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 06:19.

Cadent Gas logo
Between
19 May and 4 Jun 2024
Details
View Map
Share
Follow
Green Street

Cadent Gas are proposing to carry out Utility asset works on Green Street, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Apr 2024 at 06:59.

Cadent Gas logo
Between
19 May and 4 Jun 2024
Details
View Map
Share
Follow
Newbridge Street

Cadent Gas are proposing to carry out roadworks on Newbridge Street, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Apr 2024 at 06:58.

Cadent Gas logo
LONG TERM
Between
19 May and 18 Aug 2024
Details
View Map
Share
Follow
Stretton Road

Cadent Gas are proposing to carry out Utility asset works on Stretton Road, Clay Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 18 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 15:30.

Cadent Gas logo
Between
19 May and 4 Jun 2024
Details
View Map
Share
Follow
Newbridge Lane

Cadent Gas are proposing to carry out Utility asset works on Newbridge Lane, Old Whittington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Apr 2024 at 06:59.

Cadent Gas logo
Between
19 May and 3 Jun 2024
Details
View Map
Share
Follow
Whitting Valley Road

Cadent Gas are proposing to carry out Utility asset works on Whitting Valley Road, Old Whittington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 06:21.

Derbyshire County Council logo
Between
20 and 31 May 2024
Details
View Map
Share
Follow
Press Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Press Lane, Old Tupton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 4 Apr 2024 at 17:26.

Cadent Gas logo
Between
20 May and 5 Jun 2024
Details
View Map
Share
Follow
Inkersall Green Road

Cadent Gas are proposing to carry out Utility asset works on Inkersall Green Road, Inkersall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2024 at 12:40.

Cadent Gas logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Longedge Lane

Cadent Gas are proposing to carry out New service connection on Longedge Lane, Wingerworth, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Mar 2024 at 10:17.

BT logo
Between
22 and 24 May 2024
Details
View Map
Share
Follow
Dunston Road

BT are proposing to carry out Utility asset works on Dunston Road, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 9 Feb 2024 at 08:31.

Derbyshire County Council logo
Between
2 and 14 Jun 2024
Details
View Map
Share
Follow
Claypit Lane

Derbyshire County Council are proposing to carry out Highway repair and maintenance works on Claypit Lane, Upper Loads, Holymoorside.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Derbyshire County Council on 17 Apr 2024 at 10:32.

Cadent Gas logo
Between
2 and 18 Jun 2024
Details
View Map
Share
Follow
Chesterfield Road

Cadent Gas are proposing to carry out Utility asset works on Chesterfield Road, Staveley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 18 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 10:39.

Cadent Gas logo
Between
3 and 19 Jun 2024
Details
View Map
Share
Follow
Winster Road

Cadent Gas are proposing to carry out Utility asset works on Winster Road, Staveley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2024 at 09:39.

Cadent Gas logo
Between
5 and 21 Jun 2024
Details
View Map
Share
Follow
Loads Road

Cadent Gas are proposing to carry out Utility asset works on Loads Road, Holymoorside.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2024 at 09:56.

Cadent Gas logo
LONG TERM
Between
10 Jun and 12 Aug 2024
Details
View Map
Share
Follow
Middlecroft Road

Cadent Gas are proposing to carry out Utility asset works on Middlecroft Road, Staveley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 12 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Mar 2024 at 11:26.

Cadent Gas logo
Between
16 Jun and 4 Jul 2024
Details
View Map
Share
Follow
Dark Lane

Cadent Gas are proposing to carry out Utility asset works on Dark Lane, Calow, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 09:40.

Cadent Gas logo
Between
16 Jun and 2 Jul 2024
Details
View Map
Share
Follow
Vicarage Gardens

Cadent Gas are proposing to carry out Utility asset works on Vicarage Gardens, Clay Cross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 2 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 11:30.

Cadent Gas logo
Between
16 Jun and 7 Jul 2024
Details
View Map
Share
Follow
Works Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Works Road, Hollingwood.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 7 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 10:37.

Cadent Gas logo
Between
17 Jun and 15 Jul 2024
Details
View Map
Share
Follow
Hardwick Avenue

Cadent Gas are proposing to carry out Utility asset works on Hardwick Avenue, New Whittington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 15 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2024 at 12:31.

Cadent Gas logo
Between
23 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Calow, Chesterfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 09:25.

Cadent Gas logo
Between
24 Jun and 10 Jul 2024
Details
View Map
Share
Follow
Highstairs Lane

Cadent Gas are proposing to carry out Utility asset works on Highstairs Lane, Stretton, Alfreton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 10 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2024 at 15:16.

Cadent Gas logo
Between
30 Jun and 11 Jul 2024
Details
View Map
Share
Follow
Pilsley Road

Cadent Gas are proposing to carry out Utility asset works on Pilsley Road, Lower Pilsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 08:57.

Severn Trent Water logo
Between
3 and 5 Jul 2024
Details
View Map
Share
Follow
Park View

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Park View, Hasland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Apr 2024 at 08:11.

Cadent Gas logo
LONG TERM
Between
7 Jul and 29 Aug 2024
Details
View Map
Share
Follow
Top Road

Cadent Gas are proposing to carry out Utility asset works on Top Road, Calow, Chesterfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Apr 2024 at 10:53.

Cadent Gas logo
Between
8 and 29 Jul 2024
Details
View Map
Share
Follow
Frecheville Street

Cadent Gas are proposing to carry out Utility asset works on Frecheville Street, Staveley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 29 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Mar 2024 at 11:21.

Severn Trent Water logo
Between
9 and 11 Jul 2024
Details
View Map
Share
Follow
Woodhouse Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Woodhouse Lane, Bolsover.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Apr 2024 at 12:52.

Severn Trent Water logo
Between
15 and 19 Jul 2024
Details
View Map
Share
Follow
Postmans Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Postmans Lane, Temple Normanton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 19 July 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Apr 2024 at 11:43.

Severn Trent Water logo
Between
19 and 24 Jul 2024
Details
View Map
Share
Follow
Dark Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Dark Lane, Calow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 July 2024 and could run through until 24 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Apr 2024 at 11:29.

Cadent Gas logo
Between
22 Jul and 7 Aug 2024
Details
View Map
Share
Follow
Ashcroft Drive

Cadent Gas are proposing to carry out Utility asset works on Ashcroft Drive, Old Whittington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 7 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Mar 2024 at 13:21.

Cadent Gas logo
Between
22 Jul and 7 Aug 2024
Details
View Map
Share
Follow
Chesterfield Road

Cadent Gas are proposing to carry out Utility asset works on Chesterfield Road, Staveley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 7 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2024 at 11:23.


Roadworks Map near to The Green, CHESTERFIELD, S41 0JU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Apr 2024 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Green, CHESTERFIELD, S41 0JU (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nexfibre Networks Limited logo
OADBY DRIVE 
(0.2 miles)
Nexfibre Networks Limited
Remedial works - Footway - Give and take
Planned
Scheduled: 23 Apr 2024 - 25 Apr 2024
0.2
Details
Share
Follow
2
Virgin Media logo
CHALLANDS WAY 
(0.6 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 24 Apr 2024 - 28 Apr 2024
0.6
Details
Share
Follow
3
Virgin Media logo
ST JAMES CLOSE 
(0.8 miles)
Virgin Media
Utility asset works - Footway - Give and take
Planned
Scheduled: 24 Apr 2024 - 28 Apr 2024
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.