ROADWORKS SUMMARY
Lodge Avenue, DAGENHAM, RM8 2HY
Introduction
View current and future planned roadworks and road closures for Lodge Avenue, RM8 2HY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Lodge Avenue, DAGENHAM, RM8 2HY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lodge Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Aug 2024
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 March 2023 at 08:00 and could run through until 31 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 1 Mar 2024 at 12:19.
Tuesday
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Stratford, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 June 2023 at 08:00 and could run through until 30 April 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 19 Mar 2024 at 14:57.
19 Sep 2024
Thames Water are carrying out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 July 2023 at 17:03 and could run through until 19 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Dec 2023 at 09:11.
13 May 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Nathan Way, Thamesmead.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 September 2023 at 08:30 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Apr 2024 at 15:01.
31 Jul 2024
London Borough Of Newham are carrying out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 September 2023 at 07:00 and could run through until 31 July 2024. The works will impact the footway, carriageway, verge, cycleway and footpath.
This roadwork event was last updated by London Borough Of Newham on 18 Apr 2024 at 13:39.
13 Aug 2024
London Borough Of Newham are carrying out Highway improvement works on Queens Market, Upton Park, London.
These works are categorised as Major.
The works should not impact the carriageway.
The works started on 12 September 2023 at 22:00 and could run through until 13 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 5 Mar 2024 at 12:41.
31 Aug 2024
London Borough Of Newham are carrying out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 September 2023 at 12:00 and could run through until 31 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 30 Jan 2024 at 09:28.
23 May 2024
Thames Water are carrying out Utility asset works on Southchurch Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 October 2023 at 08:00 and could run through until 23 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2023 at 11:38.
6 Nov 2024
Royal Borough Of Greenwich are carrying out Highway repair and maintenance works on Plumstead High Street, Plumstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2023 at 11:00 and could run through until 6 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 12 Mar 2024 at 10:28.
6 Nov 2023 and 5 May 2024
London Borough Of Newham are proposing to carry out Highway improvement works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 17:57.
31 Aug 2024
London Borough Of Newham are carrying out Highway improvement works on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 6 November 2023 at 08:00 and could run through until 31 August 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 30 Jan 2024 at 09:56.
6 Nov 2023 and 5 May 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 17:58.
6 Nov 2023 and 5 May 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Connaught Bridge, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 18:01.
6 Nov 2023 and 5 May 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Connaught Road, Silvertown, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2023 and could run through until 5 May 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 14 Aug 2023 at 18:01.
31 May 2024
London Borough Of Newham are carrying out Highway improvement works on High Street, Plaistow, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 08:00 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 24 Jan 2024 at 16:21.
31 Aug 2024
London Borough Of Newham are carrying out Highway improvement works on Silvertown Way, Canning Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 08:00 and could run through until 31 August 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Newham on 30 Jan 2024 at 14:19.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Thames Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 4 Jan 2024 at 09:37.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Booth Road, Silvertown, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:22.
19 Dec 2024
London Borough Of Newham are carrying out Section 50 on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
The works started on 4 January 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Newham on 15 Apr 2024 at 13:12.
23 Dec 2024
London Borough Of Newham are carrying out Section 50 on Burt Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 January 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 10 Jan 2024 at 09:26.
2 Jan and 19 Dec 2024
London Borough Of Newham are proposing to carry out Section 50 on Charles Street, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2024 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 3 Jan 2024 at 11:20.
Tuesday
London Borough Of Newham are carrying out Highway improvement works on Dyson Road, Stratford, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 January 2024 at 08:00 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 13 Mar 2024 at 13:17.
30 Sep 2024
Thames Water are carrying out Utility asset works on High Street North, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 10:00 and could run through until 30 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Apr 2024 at 09:13.
11 Jan and 31 May 2024
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Claps Gate Lane, Beckton, London.
These works are categorised as Major.
The works will start on or after 11 January 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 22 Sep 2023 at 12:49.
30 May 2024
London Borough Of Newham are carrying out Highway improvement works on Park Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 08:00 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 5 Apr 2024 at 08:54.
27 May 2024
London Borough Of Waltham Forest are carrying out Highway repair and maintenance works on Harrow Road, Leytonstone.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 January 2024 at 08:00 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Waltham Forest on 20 Mar 2024 at 13:19.
Monday
Thames Water are carrying out Utility asset works on Poulett Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 January 2024 at 09:00 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Apr 2024 at 07:58.
29 Jan and 19 May 2024
Thames Water are proposing to carry out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 24 Nov 2023 at 09:11.
20 May 2024
Thames Water are carrying out Utility asset works on High Street South, East Ham, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 January 2024 at 08:00 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Feb 2024 at 23:05.
13 May 2024
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 16:30 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 17 Apr 2024 at 11:18.
3 May 2024
Thames Water are carrying out Utility asset works on Landstead Road, Plumstead.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 February 2024 at 08:40 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Feb 2024 at 09:21.
19 Feb and 8 Sep 2024
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2024 and could run through until 8 September 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 17 Nov 2023 at 09:11.
Tomorrow
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Great Eastern Road, Stratford, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2024 and could run through until 26 April 2024. The works will impact the footway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 7 Feb 2024 at 16:31.
28 Feb and 31 May 2024
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on Clegg Street, Plaistow, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 February 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 28 Feb 2024 at 16:06.
2 May 2024
Thames Water are carrying out Utility repair and maintenance works on Davis Street, Plaistow, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 18:00 and could run through until 2 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 9 Apr 2024 at 08:21.
14 Mar and 8 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Clova Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 March 2024 and could run through until 8 May 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 18 Dec 2023 at 11:15.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Clements Lane, Ilford.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 March 2024 at 15:15 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 11:49.
14 Mar and 6 May 2024
London Borough Of Redbridge are proposing to carry out Highway repair and maintenance works on Balfour Road, Ilford.
These works are categorised as Major.
The works will start on or after 14 March 2024 and could run through until 6 May 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Redbridge on 19 Mar 2024 at 11:09.
10 May 2024
London Borough Of Newham are carrying out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 March 2024 at 08:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 21 Mar 2024 at 10:09.
Wednesday
London Borough Of Barking And Dagenham are carrying out Highway improvement works on Rainham Road South, Dagenham.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:30 and could run through until 1 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 18 Mar 2024 at 09:36.
Tomorrow
London Borough Of Havering are carrying out Highway improvement works on South Street, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 09:30 and could run through until 26 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 18 Mar 2024 at 09:30.
20 Mar and 3 May 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Worcester Road, Manor Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 March 2024 and could run through until 3 May 2024. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Newham on 20 Dec 2023 at 10:03.
Tomorrow
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ripple Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2024 and could run through until 26 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Apr 2024 at 11:38.
20 May 2024
Thames Water are carrying out Utility asset works on Arragon Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 09:00 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 15:45.
25 Mar and 3 May 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 20 Dec 2023 at 10:03.
14 Oct 2024
UK Power Networks Eastern & London are carrying out New service connection on Ightham Road, Erith.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 March 2024 at 08:00 and could run through until 14 October 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 2 Apr 2024 at 14:34.
8 May 2024
Thames Water are carrying out Utility repair and maintenance works on Lakedale Road, Plumstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 March 2024 at 09:00 and could run through until 8 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 11:37.
13 May 2024
Cadent Gas are carrying out Utility asset works on Movers Lane, Barking.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 April 2024 at 07:27 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 14:02.
5 May 2024
Thames Water are carrying out Utility asset works on Clements Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:30 and could run through until 5 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Apr 2024 at 10:47.
24 May 2024
London Borough Of Barking And Dagenham are carrying out roadworks on Thames Road, Barking.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 09:30 and could run through until 24 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 18 Apr 2024 at 11:29.
14 Jun 2024
Transport for London (TfL) are carrying out Highway improvement works on Lower Lea Crossing, Canning Town, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 4 April 2024 at 20:00 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 09:51.
19 May 2024
Thames Water are carrying out Utility asset works on Thorpe Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 April 2024 at 13:30 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Apr 2024 at 13:42.
19 May 2024
Thames Water are carrying out Utility asset works on Myrtle Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 April 2024 at 13:30 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 9 Apr 2024 at 13:38.
7 Apr and 14 May 2024
Cadent Gas are proposing to carry out Utility asset works on Parkstone Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Jan 2024 at 09:26.
2 May 2024
Thames Water are carrying out Utility asset works on Admaston Road, Plumstead.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 08:00 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Apr 2024 at 09:51.
Tomorrow
London Borough Of Bromley are proposing to carry out Highway improvement works on Plumstead High Street, Plumstead.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bromley on 4 Apr 2024 at 16:27.
Tomorrow
Royal Borough Of Greenwich are carrying out Highway improvement works on Plumstead High Street, Plumstead.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:00 and could run through until 26 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Greenwich on 8 Apr 2024 at 09:43.
8 Apr and 17 May 2024
London Borough Of Bexley are proposing to carry out Section 50 on Church Manorway, Erith.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Bexley on 5 Mar 2024 at 15:32.
19 Aug 2024
London Borough Of Newham are carrying out Highway improvement works on Frobisher Road, Beckton, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 07:00 and could run through until 19 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 8 Apr 2024 at 16:42.
3 May 2024
London Borough Of Havering are carrying out Highway repair and maintenance works on Rosewood Avenue, Hornchurch.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 April 2024 at 08:00 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 8 Apr 2024 at 08:56.
8 Apr and 10 May 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Eighth Avenue, Manor Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 8 Jan 2024 at 11:00.
8 Apr and 10 May 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 8 Jan 2024 at 12:31.
8 Apr and 10 May 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 8 Jan 2024 at 11:00.
8 Apr and 10 May 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Romford Road, Manor Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 8 Jan 2024 at 12:32.
8 Apr and 11 May 2024
National Highways are proposing to carry out Highway improvement works on North Circular Road, Wanstead, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 22 Mar 2024 at 14:03.
8 Apr and 11 May 2024
National Highways are proposing to carry out Highway improvement works on Eastern Avenue, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 11 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 22 Mar 2024 at 14:04.
9 Apr and 13 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Wellington Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Dec 2023 at 10:24.
10 Apr and 3 May 2024
London Borough Of Newham are proposing to carry out Section 50 on Barking Road, East Ham, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 9 Apr 2024 at 09:06.
Today
Southern Gas Networks are carrying out Utility repair and maintenance works on Plumstead High Street, Plumstead.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 10:00 and could run through until 25 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 17 Apr 2024 at 15:18.
Today
Southern Gas Networks are carrying out Utility repair and maintenance works on Woodhurst Road, Abbey Wood.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 10:00 and could run through until 25 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 15 Apr 2024 at 11:42.
12 May 2024
Thames Water are carrying out Utility asset works on Cabot Way, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 08:30 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:53.
16 May 2024
Thames Water are carrying out Disconnection or alteration of supply on Herongate Road, Wanstead, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:00 and could run through until 16 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Apr 2024 at 07:02.
Monday
Cadent Gas are proposing to carry out Utility asset works on Ripple Road, Dagenham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Jan 2024 at 15:27.
14 May 2024
Thames Water are carrying out Utility asset works on Wakefield Street, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 April 2024 at 09:00 and could run through until 14 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 07:58.
16 Apr and 12 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Avenue Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Dec 2023 at 10:25.
6 Jun 2024
Boldyn Networks are carrying out Utility asset works on Stephenson Street, Canning Town, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 April 2024 at 10:45 and could run through until 6 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Boldyn Networks on 19 Apr 2024 at 10:53.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Heathway, Dagenham.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 April 2024 at 09:00 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 14:41.
Thames Water carried out Utility repair and maintenance works on Godwin Road, Forest Gate, London.
The road was closed for some or all of the period.
The works were originally planned between 19 Apr 2024 and 25 Apr 2024 and were actually completed between 19 Apr 2024 (08:29) and 25 Apr 2024 (06:30). The works impacted the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 07:10.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Vansittart Road, Forest Gate.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 April 2024 at 11:23 and could run through until 26 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 09:06.
21 Apr and 12 May 2024
Cadent Gas are proposing to carry out Utility asset works on Wennington Road, Rainham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 10:53.
27 May 2024
Cadent Gas are carrying out Utility asset works on Rainham Road, Rainham.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 07:15 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:02.
Tuesday
Thames Water are carrying out Utility asset works on Lodge Hill, Ilford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 April 2024 at 08:10 and could run through until 30 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 10:39.
Thames Water carried out Utility repair and maintenance works on Strata Road, Erith.
The road was closed for some or all of the period.
The works were originally planned between 22 Apr 2024 and 25 Apr 2024 and were actually completed between 22 Apr 2024 (11:27) and 25 Apr 2024 (09:02). The works impacted the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 15:30.
22 Apr and 14 Jun 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Green Street, Forest Gate, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 14 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 27 Mar 2024 at 07:35.
22 Apr and 5 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Pevensey Road, Forest Gate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Jan 2024 at 14:04.
22 Apr and 5 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Harvey Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 5 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Mar 2024 at 14:36.
Monday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Springfield Drive, Barkingside, Ilford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 07:30 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 23 Apr 2024 at 08:47.
Tomorrow
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Angel Way, Romford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 April 2024 at 07:00 and could run through until 26 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Apr 2024 at 07:43.
22 Apr and 20 May 2024
Transport for London (TfL) are proposing to carry out roadworks on Eastern Avenue West, Chadwell Heath.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Apr 2024 at 10:02.
Sunday
Thames Water are carrying out Utility repair and maintenance works on Alabama Street, Plumstead.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 April 2024 at 08:15 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 09:34.
Sunday
Thames Water are carrying out Utility repair and maintenance works on Lower Road, Erith.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 April 2024 at 09:28 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 11:08.
22 May 2024
Thames Water are carrying out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
The works started on 24 April 2024 at 08:00 and could run through until 22 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 09:12.
Sunday
Thames Water are carrying out Utility asset works on Myrtle Road, East Ham, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 April 2024 at 08:20 and could run through until 28 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 08:20.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Aldersbrook Road, Wanstead, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 April 2024 at 11:56 and could run through until 29 April 2024. The works will impact the carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 13:03.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Melbourne Road, East Ham, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 April 2024 at 11:24 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 13:49.
28 Apr 2024 and 29 Apr 2025
London Borough Of Newham are proposing to carry out Highway repair and maintenance works on North Woolwich Road, Silvertown, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 23 Apr 2024 at 15:59.
28 Apr and 4 May 2024
Thames Water are proposing to carry out New service connection on Windmill Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 4 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:23.
29 Apr and 19 May 2024
Thames Water are proposing to carry out Utility asset works on Hinstock Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Mar 2024 at 11:01.
29 Apr and 20 May 2024
Cadent Gas are proposing to carry out Utility asset works on Kennedy Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Feb 2024 at 10:46.
29 Apr and 20 May 2024
Cadent Gas are proposing to carry out Utility asset works on Movers Lane, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Feb 2024 at 12:49.
29 Apr and 20 May 2024
Cadent Gas are proposing to carry out Utility asset works on Ripple Road, Barking.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Feb 2024 at 15:20.
Monday
London Borough Of Havering are proposing to carry out Highway improvement works on Cavendish Avenue, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 29 April 2024 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Havering on 15 Mar 2024 at 14:13.
29 Apr and 3 May 2024
BT are proposing to carry out Utility repair and maintenance works on Loxford Lane, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Feb 2024 at 12:53.
29 Apr and 17 May 2024
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Oxlow Lane, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 12 Apr 2024 at 14:01.
30 Apr and 19 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on St James Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2024 and could run through until 19 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Dec 2023 at 14:38.
1 May and 26 Jun 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Choats Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 26 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 28 Feb 2024 at 16:08.
2 and 13 May 2024
Thames Water are proposing to carry out Utility asset works on Katherine Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 15:09.
2 and 13 May 2024
Thames Water are proposing to carry out Utility asset works on Wakefield Street, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 15:09.
6 May and 14 Jul 2024
Thames Water are proposing to carry out Utility asset works on Chaucer Road, Welling.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Feb 2024 at 18:39.
6 May and 3 Jun 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Chequers Lane, Dagenham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 21 Dec 2023 at 12:20.
6 May and 17 Jun 2024
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 17 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:43.
6 and 27 May 2024
Thames Water are proposing to carry out Utility asset works on Wellington Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:45.
6 and 27 May 2024
Thames Water are proposing to carry out Utility asset works on Streatfeild Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:44.
6 and 27 May 2024
Thames Water are proposing to carry out Utility asset works on Didsbury Close, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:47.
6 and 27 May 2024
Thames Water are proposing to carry out Utility asset works on Latimer Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Feb 2024 at 11:46.
6 and 14 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Great Eastern Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 14 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 07:52.
6 and 22 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Marlborough Road, South Woodford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Feb 2024 at 12:53.
7 and 9 May 2024
BT are proposing to carry out Utility asset works on Woodlands Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 15 Apr 2024 at 13:04.
8 May and 6 Jun 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Cary Road, Leytonstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Jan 2024 at 14:08.
13 May and 21 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Road, Plaistow, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 14:59.
13 May and 21 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Plaistow Road, Plaistow, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 14:59.
13 May and 21 Jun 2024
Thames Water are proposing to carry out Utility asset works on Grangewood Street, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 15:10.
13 and 27 May 2024
Thames Water are proposing to carry out Utility asset works on West Ham Lane, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Feb 2024 at 15:59.
13 May and 16 Jun 2024
Thames Water are proposing to carry out Utility asset works on Aldworth Road, Stratford, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Feb 2024 at 15:47.
13 and 15 May 2024
BT are proposing to carry out Utility asset works on South Esk Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 22 Apr 2024 at 11:25.
13 May and 13 Jul 2024
London Borough Of Newham are proposing to carry out Works for road purposes on Eighth Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 13 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Newham on 19 Mar 2024 at 12:12.
13 and 24 May 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Barwick Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Jan 2024 at 16:09.
14 May and 15 Jun 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Aldworth Road, Stratford, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 18 Apr 2024 at 10:41.
19 May and 3 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Rainham Road, Rainham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 14:11.
19 May and 25 Jul 2024
Thames Water are proposing to carry out Utility asset works on Katherine Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 25 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Apr 2024 at 11:23.
20 May and 9 Jun 2024
Thames Water are proposing to carry out Utility asset works on Olven Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Mar 2024 at 11:03.
20 and 25 May 2024
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Eastern Way, Thamesmead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 27 Feb 2024 at 12:14.
20 and 24 May 2024
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Eastern Way, Thamesmead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 12 Apr 2024 at 10:25.
20 and 25 May 2024
London Borough Of Bexley are proposing to carry out Highway repair and maintenance works on Carlyle Road, Thamesmead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 27 Feb 2024 at 11:58.
20 and 24 May 2024
Electricity Network Company are proposing to carry out Utility asset works on New Road, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 27 Feb 2024 at 12:48.
20 and 23 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Windmill Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Feb 2024 at 15:45.
20 and 23 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Windmill Lane, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Feb 2024 at 13:58.
20 May and 1 Aug 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Wanstead Park Avenue, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Mar 2024 at 11:24.
22 May and 28 Oct 2024
Thames Water are proposing to carry out Utility asset works on Barking Road, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2024 and could run through until 28 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 13:46.
22 May and 27 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Road, Romford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 May 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 13:29.
25 May and 1 Jun 2024
BT are proposing to carry out Utility asset works on Plumstead High Street, Plumstead.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 1 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 15 Mar 2024 at 09:13.
25 May and 1 Jun 2024
BT are proposing to carry out Utility asset works on Kentmere Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 15 Mar 2024 at 09:12.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Rainham Road South, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Mar 2024 at 14:22.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Foxlands Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Mar 2024 at 12:53.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Cambeys Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Mar 2024 at 12:53.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Bury Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Mar 2024 at 12:53.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Oxlow Lane, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 4 Mar 2024 at 12:52.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Panyers Gardens, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Mar 2024 at 14:22.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Central Park Avenue, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Mar 2024 at 14:22.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Ashbrook Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Mar 2024 at 14:25.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Hardie Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Mar 2024 at 14:25.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Hardie Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Mar 2024 at 14:25.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Park Drive, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Mar 2024 at 14:22.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Stour Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 7 Mar 2024 at 14:23.
25 and 27 May 2024
London Borough Of Barking And Dagenham are proposing to carry out roadworks on Rush Green Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 5 Mar 2024 at 14:00.
27 May and 10 Jun 2024
Thames Water are proposing to carry out Utility asset works on Woolwich Church Street, Woolwich.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Apr 2024 at 14:57.
27 May and 15 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Feb 2024 at 10:16.
27 May and 15 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on King Edward Road, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Feb 2024 at 10:23.
28 May and 3 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Nithdale Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Apr 2024 at 11:07.
28 and 30 May 2024
Thames Water are proposing to carry out Permanent reinstatement on Granville Road, South Woodford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 11:27.
29 and 31 May 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Waldrist Way, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 13 Mar 2024 at 07:49.
2 Jun and 2 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Manbey Grove, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 2 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Jan 2024 at 10:37.
2 and 6 Jun 2024
BT are proposing to carry out Utility repair and maintenance works on Bush Elms Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 25 Apr 2024 at 13:05.
2 and 6 Jun 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Quebec Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 23 Apr 2024 at 12:36.
3 and 6 Jun 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Lessness Park, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 18 Mar 2024 at 11:41.
3 and 8 Jun 2024
Thames Water are proposing to carry out New service connection on Ron Leighton Way, East Ham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Mar 2024 at 10:54.
3 and 8 Jun 2024
Thames Water are proposing to carry out roadworks on Clements Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Mar 2024 at 10:02.
3 Jun and 5 Jul 2024
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Selinas Lane, Dagenham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 22 Apr 2024 at 13:06.
3 and 9 Jun 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Maidstone Avenue, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 11 Apr 2024 at 06:23.
9 and 12 Jun 2024
Thames Water are proposing to carry out New service connection on Francis Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 12 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 08:05.
9 Jun and 20 Jul 2024
Thames Water are proposing to carry out Utility asset works on Turpins Lane, Chigwell Town, Chigwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 20 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Apr 2024 at 10:48.
10 and 30 Jun 2024
Thames Water are proposing to carry out Utility asset works on Upton Road, Plumstead.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Mar 2024 at 10:40.
10 and 13 Jun 2024
Thames Water are proposing to carry out New service connection on Francis Street, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Mar 2024 at 10:12.
11 and 25 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Saxon Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2024 at 13:50.
11 and 25 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Norman Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2024 at 13:50.
11 and 25 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Baden Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2024 at 13:50.
11 and 25 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Hickling Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 25 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2024 at 13:50.
11 Jun and 16 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Mayville Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2024 at 13:50.
12 and 26 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Roman Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2024 and could run through until 26 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 4 Apr 2024 at 10:09.
16 Jun and 14 Jul 2024
Thames Water are proposing to carry out Utility asset works on Faringford Road, Stratford, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Feb 2024 at 16:03.
16 and 20 Jun 2024
BT are proposing to carry out Utility repair and maintenance works on Hornchurch Road, Hornchurch.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 15 Apr 2024 at 09:09.
16 and 18 Jun 2024
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Lodge Lane, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 16 Apr 2024 at 10:17.
17 Jun and 12 Jul 2024
Electricity Network Company are proposing to carry out Utility asset works on West Street, Erith.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 23 Apr 2024 at 11:26.
17 and 23 Jun 2024
Thames Water are proposing to carry out roadworks on Tant Avenue, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Mar 2024 at 10:57.
17 and 21 Jun 2024
Thames Water are proposing to carry out New service connection on Stokes Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 15:15.
17 Jun and 6 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Briscoe Road, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 6 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 15:42.
17 Jun and 8 Jul 2024
Thames Water are proposing to carry out Utility asset works on Kempton Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:55.
17 Jun and 8 Jul 2024
Thames Water are proposing to carry out Utility asset works on Skeffington Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:51.
17 Jun and 8 Jul 2024
Thames Water are proposing to carry out Utility asset works on Caledon Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:51.
17 Jun and 8 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Caulfield Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Mar 2024 at 11:53.
17 and 21 Jun 2024
Thames Water are proposing to carry out New service connection on Sylvan Road, Wanstead, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Mar 2024 at 13:03.
18 and 20 Jun 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Dunkeld Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 9 Apr 2024 at 13:42.
20 Jun and 17 Jul 2024
Electricity Network Company are proposing to carry out Utility asset works on Highbridge Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 25 Apr 2024 at 12:54.
20 Jun and 17 Jul 2024
Electricity Network Company are proposing to carry out Utility asset works on Highbridge Road, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 25 Apr 2024 at 14:53.
21 Jun and 1 Jul 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Hythe Avenue, Bexleyheath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 07:37.
24 Jun and 23 Sep 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Ripley Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 23 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 13:51.
24 Jun and 23 Aug 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Stanmore Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 23 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 13:48.
24 Jun and 26 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Upper Sheridan Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 12:53.
24 Jun and 2 Sep 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Gladeswood Road, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 2 September 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Apr 2024 at 09:20.
24 Jun and 8 Jul 2024
Thames Water are proposing to carry out Utility asset works on Bartle Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Feb 2024 at 15:23.
24 and 28 Jun 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Sprowston Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 09:41.
24 Jun and 1 Jul 2024
Thames Water are proposing to carry out New service connection on Church Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 1 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 13:36.
24 Jun and 1 Jul 2024
Thames Water are proposing to carry out roadworks on Osborne Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Apr 2024 at 14:05.
24 Jun and 1 Jul 2024
Thames Water are proposing to carry out New service connection on Woodgrange Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 1 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Apr 2024 at 14:03.
25 Jun and 12 Jul 2024
London Borough Of Barking And Dagenham are proposing to carry out Highway improvement works on Ripple Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barking And Dagenham on 11 Apr 2024 at 08:24.
26 Jun and 24 Jul 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Choats Road, Dagenham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 June 2024 and could run through until 24 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 7 Mar 2024 at 09:08.
27 Jun and 25 Aug 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Parsonage Manorway, Belvedere.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 25 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Mar 2024 at 07:38.
27 Jun and 11 Jul 2024
London Borough Of Newham are proposing to carry out Highway improvement works on Richard House Drive, West Beckton, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Newham on 28 Mar 2024 at 19:06.
27 Jun and 8 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Hampton Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 8 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 13:30.
30 Jun and 28 Jul 2024
Thames Water are proposing to carry out Utility asset works on Eversleigh Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 14:31.
30 Jun and 28 Jul 2024
Thames Water are proposing to carry out Utility asset works on Lawrence Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 08:27.
30 Jun and 28 Jul 2024
Thames Water are proposing to carry out Utility asset works on Victoria Avenue, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 08:41.
30 Jun and 28 Jul 2024
Thames Water are proposing to carry out Utility asset works on Heigham Road, East Ham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Apr 2024 at 14:30.
30 Jun and 2 Jul 2024
Cadent Gas are proposing to carry out Remedial works on Morris Road, Dagenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 2 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 15:24.
1 Jul and 2 Aug 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Picardy Manorway, Belvedere.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Jan 2024 at 11:23.
1 and 19 Jul 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on River Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Apr 2024 at 09:12.
1 and 19 Jul 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Askwith Road, Rainham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 19 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 4 Apr 2024 at 15:52.
2 and 5 Jul 2024
Thames Water are proposing to carry out New service connection on Parker Street, North Woolwich, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:08.
4 and 8 Jul 2024
BT are proposing to carry out Utility repair and maintenance works on Percy Road, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2024 and could run through until 8 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 17 Apr 2024 at 10:08.
7 and 16 Jul 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Oaklands Avenue, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 10 Apr 2024 at 15:10.
8 and 12 Jul 2024
Thames Water are proposing to carry out New service connection on Michigan Avenue, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Apr 2024 at 12:04.
8 and 14 Jul 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Mill Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 17 Apr 2024 at 10:08.
8 and 16 Jul 2024
BT are proposing to carry out Utility asset works on Morden Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 July 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Apr 2024 at 10:28.
14 Jul and 20 Dec 2024
Thames Water are proposing to carry out Utility asset works on Manor Road, Stratford, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Apr 2024 at 15:39.
14 and 16 Jul 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Halsham Crescent, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 24 Apr 2024 at 10:02.
14 and 16 Jul 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Halsham Crescent, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 25 Apr 2024 at 09:46.
14 Jul and 8 Sep 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Field Road, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 8 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Dec 2023 at 11:14.
15 and 17 Jul 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Church Manorway, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 17 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 17 Apr 2024 at 14:54.
15 and 19 Jul 2024
Cadent Gas are proposing to carry out New service connection on Tweed Way, Romford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Apr 2024 at 13:00.
21 and 25 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Wilmount Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Apr 2024 at 14:31.
21 and 23 Jul 2024
Hutchinson 3G are proposing to carry out Utility asset works on Bronze Age Way, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 23 July 2024. The works will impact the verge only.
This roadwork event was last updated by Hutchinson 3G on 11 Apr 2024 at 13:36.
21 Jul and 1 Aug 2024
Thames Water are proposing to carry out New service connection on Nursery Lane, Forest Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Apr 2024 at 07:57.
21 and 27 Jul 2024
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Water Lane, Seven Kings, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 27 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 23 Apr 2024 at 09:37.
21 and 24 Jul 2024
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Quebec Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Essex And Suffolk Water on 22 Apr 2024 at 09:45.
21 and 25 Jul 2024
BT are proposing to carry out Utility asset works on North Road, Chadwell Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 25 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Apr 2024 at 10:15.
21 Jul and 15 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Woodlands Road, Romford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 15 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 14:28.
22 Jul and 1 Sep 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Wilmount Street, Woolwich.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 1 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Apr 2024 at 14:59.
22 and 24 Jul 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Sedgemere Road, Abbey Wood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 4 Apr 2024 at 09:57.
22 and 30 Jul 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Yarnton Way, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 25 Apr 2024 at 15:04.
22 and 30 Jul 2024
London Borough Of Bexley are proposing to carry out Highway improvement works on Yarnton Way, Erith.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 30 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Bexley on 20 Mar 2024 at 09:06.
22 and 26 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Hermit Road, Canning Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Apr 2024 at 16:06.
22 Jul and 27 Sep 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Renwick Road, Barking.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 27 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Apr 2024 at 09:25.
22 and 26 Jul 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Boundary Road, Plaistow, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Apr 2024 at 16:14.
22 Jul and 14 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Movers Lane, Barking.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 14 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 09:08.
22 and 29 Jul 2024
Thames Water are proposing to carry out New service connection on Church Road, Manor Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 29 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Apr 2024 at 11:47.
22 and 29 Jul 2024
Thames Water are proposing to carry out New service connection on High Street North, Manor Park, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Apr 2024 at 13:12.
23 Jul and 13 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Rainham Road, Rainham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 13 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Apr 2024 at 08:50.
23 Jul and 13 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on South End Road, Rainham.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 13 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 12:23.
23 Jul and 28 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Lowbrook Road, Ilford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 28 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 09:53.
Roadworks Map near to Lodge Avenue, DAGENHAM, RM8 2HY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Lodge Avenue, DAGENHAM, RM8 2HY (34 Events)
(Scheduled Dates)
(miles)
(Scheduled: 22 Apr 2024 - 25 Apr 2024)
(Scheduled: 25 Apr 2024 - 29 Apr 2024)
(Scheduled: 23 Apr 2024 - 28 Apr 2024)
(Scheduled: 14 Apr 2024 - 28 Apr 2024)
(Scheduled: 14 Apr 2024 - 25 Apr 2024)
(Scheduled: 14 Apr 2024 - 28 Apr 2024)
(Scheduled: 14 Apr 2024 - 27 May 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data