ROADWORKS SUMMARY
N22 4YF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for N22 4YF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to N22 4YF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Transport for London (TfL) logo
LONG TERM
Between
19 Dec 2022 and 26 Aug 2024
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2022 and could run through until 26 August 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 2 Jan 2024 at 11:17.

Transport for London (TfL) logo
LONG TERM
Until
28 Jun 2024
Details
View Map
Share
Follow
Stoke Newington High Street

Transport for London (TfL) are carrying out roadworks on Stoke Newington High Street, Hackney, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2023 at 08:00 and could run through until 28 June 2024. The works will impact the footway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2024 at 13:29.

London Borough Of Hackney logo
LONG TERM
Between
4 Jul 2023 and 12 May 2024
Details
View Map
Share
Follow
Lea Bridge Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 July 2023 and could run through until 12 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 3 May 2023 at 10:19.

London Borough Of Enfield logo
LONG TERM
Until
7 Jun 2024
Details
View Map
Share
Follow
Stockton Road

London Borough Of Enfield are carrying out Section 50 on Stockton Road, Edmonton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 July 2023 at 09:00 and could run through until 7 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 27 Mar 2024 at 16:17.

London Borough Of Enfield logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Claremont Street

London Borough Of Enfield are carrying out Section 50 on Claremont Street, Edmonton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 July 2023 at 08:00 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 27 Mar 2024 at 10:00.

Thames Water logo
LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Finsbury Park Road

Thames Water are carrying out Utility repair and maintenance works on Finsbury Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 07:30 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2023 at 14:31.

Thames Water logo
LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Myddleton Avenue

Thames Water are carrying out Utility repair and maintenance works on Myddleton Avenue, Hackney, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 July 2023 at 08:30 and could run through until 16 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Nov 2023 at 14:29.

London Borough Of Hackney logo
LONG TERM
Until
2 Jun 2024
Details
View Map
Share
Follow
Lea Bridge Road

London Borough Of Hackney are carrying out Highway improvement works on Lea Bridge Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 July 2023 at 08:05 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 24 Jul 2023 at 08:05.

London Borough Of Enfield logo
LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are carrying out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

The works started on 1 August 2023 at 08:00 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 27 Mar 2024 at 16:35.

Thames Water logo
LONG TERM
Between
13 Aug 2023 and 11 Jul 2024
Details
View Map
Share
Follow
Arnos Grove

Thames Water are proposing to carry out Utility asset works on Arnos Grove, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 August 2023 and could run through until 11 July 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 29 Jun 2023 at 15:01.

London Borough Of Enfield logo
LONG TERM
Until
31 Jul 2024
Details
View Map
Share
Follow
Hertford Road

London Borough Of Enfield are carrying out Section 50 on Hertford Road, Edmonton.

These works are categorised as Major.

The works started on 1 September 2023 at 08:00 and could run through until 31 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 27 Mar 2024 at 16:40.

Thames Water logo
LONG TERM
Until
19 Sep 2024
Details
View Map
Share
Follow
Pert Close

Thames Water are carrying out Utility asset works on Pert Close, Muswell Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 11:00 and could run through until 19 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Oct 2023 at 11:55.

Thames Water logo
LONG TERM
Until
19 Sep 2024
Details
View Map
Share
Follow
Alexandra Road

Thames Water are carrying out Utility asset works on Alexandra Road, Muswell Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 October 2023 at 11:00 and could run through until 19 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Oct 2023 at 11:55.

Thames Water logo
LONG TERM
Until
22 Sep 2024
Details
View Map
Share
Follow
Atlas Road

Thames Water are carrying out Utility asset works on Atlas Road, New Southgate, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 October 2023 at 09:20 and could run through until 22 September 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Thames Water on 20 Oct 2023 at 10:16.

London Borough Of Camden logo
LONG TERM
Until
29 Jun 2024
Details
View Map
Share
Follow
York Way

London Borough Of Camden are carrying out Highway improvement works on York Way, St Pancras And Somers Town, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 October 2023 at 10:00 and could run through until 29 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 26 Mar 2024 at 07:15.

Network Rail logo
LONG TERM
Until
1 May 2024
Details
View Map
Share
Follow
St Jude Street

Network Rail are carrying out Works for Rail Purposes on St Jude Street, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Nov 2023 at 08:33.

London Borough Of Enfield logo
LONG TERM
Between
1 Jan and 1 Aug 2024
Details
View Map
Share
Follow
High Street

London Borough Of Enfield are proposing to carry out Section 50 on High Street, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2024 and could run through until 1 August 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 3 Jul 2023 at 09:39.

UK Power Networks Eastern & London logo
LONG TERM
Until
25 Oct 2024
Details
View Map
Share
Follow
Low Hall Lane

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Low Hall Lane, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 January 2024 at 09:00 and could run through until 25 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 15:38.

London Borough Of Camden logo
LONG TERM
Until
30 Oct 2024
Details
View Map
Share
Follow
Chalk Farm Road

London Borough Of Camden are carrying out Highway repair and maintenance works on Chalk Farm Road, Camden Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2024 at 12:30 and could run through until 30 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 28 Mar 2024 at 16:23.

Cadent Gas logo
LONG TERM
Finishing
Wednesday
Details
View Map
Share
Follow
Burtonhole Lane

Cadent Gas are carrying out Utility asset works on Burtonhole Lane, Mill Hill, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 January 2024 at 09:54 and could run through until 24 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Mar 2024 at 10:37.

London Borough Of Enfield logo
LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Angel Walk

London Borough Of Enfield are carrying out Section 50 on Angel Walk, London.

These works are categorised as Major.

The works started on 13 January 2024 at 09:00 and could run through until 30 April 2024. The works will impact the verge, cycleway and footpath.

This roadwork event was last updated by London Borough Of Enfield on 26 Mar 2024 at 17:05.

London Borough Of Hackney logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Wayland Avenue

London Borough Of Hackney are carrying out Highway improvement works on Wayland Avenue, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:17 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:38.

London Borough Of Hackney logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Sigdon Road

London Borough Of Hackney are carrying out Highway improvement works on Sigdon Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:17 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:45.

London Borough Of Hackney logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Sandringham Road

London Borough Of Hackney are carrying out Highway improvement works on Sandringham Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 14:44 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 21 Mar 2024 at 15:27.

London Borough Of Haringey logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Highgate High Street

London Borough Of Haringey are proposing to carry out Highway improvement works on Highgate High Street, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 21 Dec 2023 at 12:50.

London Borough Of Haringey logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Southwood Lane

London Borough Of Haringey are proposing to carry out Highway improvement works on Southwood Lane, Hornsey, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Haringey on 21 Dec 2023 at 12:50.

London Borough Of Enfield logo
LONG TERM
Between
15 Jan and 12 Jul 2024
Details
View Map
Share
Follow
Warwick Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Warwick Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Enfield on 11 Jan 2024 at 13:58.

London Borough Of Enfield logo
LONG TERM
Until
12 Jul 2024
Details
View Map
Share
Follow
Maidstone Road

London Borough Of Enfield are carrying out Highway improvement works on Maidstone Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 08:00 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 19 Jan 2024 at 08:40.

London Borough Of Enfield logo
LONG TERM
Until
4 May 2024
Details
View Map
Share
Follow
Advent Way

London Borough Of Enfield are carrying out Section 50 on Advent Way, Edmonton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 January 2024 at 08:00 and could run through until 4 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 28 Mar 2024 at 16:17.

Thames Water logo
LONG TERM
Between
24 Jan and 16 Jun 2024
Details
View Map
Share
Follow
Erskine Road

Thames Water are proposing to carry out Utility asset works on Erskine Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2024 and could run through until 16 June 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 12 Dec 2023 at 09:19.

London Borough Of Waltham Forest logo
LONG TERM
Until
23 Sep 2024
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Waltham Forest are carrying out Highway repair and maintenance works on Sutherland Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 31 January 2024 at 08:00 and could run through until 23 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by London Borough Of Waltham Forest on 2 Feb 2024 at 14:09.

London Borough Of Haringey logo
LONG TERM
Until
29 Apr 2024
Details
View Map
Share
Follow
Burdock Road

London Borough Of Haringey are carrying out Highway improvement works on Burdock Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2024 at 08:00 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 25 Mar 2024 at 11:53.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
South Access Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on South Access Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 February 2024 at 08:00 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 15:29.

London Borough Of Hackney logo
LONG TERM
Between
15 Feb 2024 and 12 Jul 2026
Details
View Map
Share
Follow
Dalston Lane

London Borough Of Hackney are proposing to carry out Highway improvement works on Dalston Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2024 and could run through until 12 July 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Hackney on 12 Dec 2023 at 10:17.

UK Power Networks Eastern & London logo
LONG TERM
Until
12 Jul 2024
Details
View Map
Share
Follow
Queens Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Queens Road, Walthamstow.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 13:00 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 19 Feb 2024 at 13:17.

Thames Water logo
LONG TERM
Sunday
Details
View Map
Share
Ainslie Wood Gardens

Thames Water carried out Utility asset works on Ainslie Wood Gardens, Chingford.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 19 Feb 2024 and 21 Apr 2024 and were actually completed between 19 Feb 2024 (15:00) and 18 Apr 2024 (15:15). The works impacted the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 15:17.

Thames Water logo
LONG TERM
Until
25 Feb 2025
Details
View Map
Share
Follow
Station Road

Thames Water are carrying out Utility asset works on Station Road, Southgate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2024 at 12:00 and could run through until 25 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Feb 2024 at 06:44.

LONG TERM
Until
14 Jun 2024
Details
View Map
Share
Follow
Northchurch Road

London Borough Of Islington are carrying out Highway improvement works on Northchurch Road, Islington, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Apr 2024 at 14:39.

London Borough Of Hackney logo
LONG TERM
Until
14 Jun 2024
Details
View Map
Share
Follow
Southgate Road

London Borough Of Hackney are carrying out Highway improvement works on Southgate Road, Hackney, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:40 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 15 Apr 2024 at 08:45.

Cadent Gas logo
LONG TERM
Until
29 Apr 2024
Details
View Map
Share
Follow
The Avenue

Cadent Gas are carrying out Utility asset works on The Avenue, Hornsey, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 10:22 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2024 at 10:25.

London Borough Of Haringey logo
LONG TERM
Until
24 May 2024
Details
View Map
Share
Follow
Fryatt Road

London Borough Of Haringey are carrying out Highway improvement works on Fryatt Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:41 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 26 Feb 2024 at 08:45.

Thames Water logo
LONG TERM
Until
10 Aug 2024
Details
View Map
Share
Follow
Arnos Grove

Thames Water are carrying out Utility asset works on Arnos Grove, Southgate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 08:00 and could run through until 10 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Feb 2024 at 08:37.

Network Rail logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Bodney Road

Network Rail are carrying out Works for Rail Purposes on Bodney Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 09:23.

Network Rail logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Downs Park Road

Network Rail are carrying out Works for Rail Purposes on Downs Park Road, Hackney, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 10:30 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Mar 2024 at 10:47.

UK Power Networks Eastern & London logo
LONG TERM
Until
30 Sep 2024
Details
View Map
Share
Follow
Edinburgh Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Edinburgh Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2024 at 13:00 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Mar 2024 at 13:22.

Thames Water logo
LONG TERM
Until
10 May 2024
Details
View Map
Share
Follow
Mansfield Road

Thames Water are carrying out Utility asset works on Mansfield Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 14:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Mar 2024 at 09:54.

London Borough Of Camden logo
LONG TERM
Between
5 Mar and 26 Apr 2024
Details
View Map
Share
Follow
Georgiana Street

London Borough Of Camden are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Camden on 5 Mar 2024 at 08:05.

London Borough Of Camden logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Goldhurst Terrace

London Borough Of Camden are carrying out Highway repair and maintenance works on Goldhurst Terrace, Swiss Cottage, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2024 at 10:00 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Camden on 11 Apr 2024 at 09:33.

Thames Water logo
LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Cleveland Park Crescent

Thames Water are carrying out Utility asset works on Cleveland Park Crescent, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 March 2024 at 12:30 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2024 at 10:46.

Thames Water logo
LONG TERM
Between
11 Mar and 19 May 2024
Details
View Map
Share
Follow
Cedars Avenue

Thames Water are proposing to carry out Utility asset works on Cedars Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 31 Oct 2023 at 15:28.

Cadent Gas logo
LONG TERM
Between
12 Mar and 20 May 2024
Details
View Map
Share
Follow
Eleanor Crescent

Cadent Gas are proposing to carry out Utility asset works on Eleanor Crescent, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 4 Mar 2024 at 16:30.

Thames Water logo
LONG TERM
Until
26 Apr 2024
Details
View Map
Share
Follow
Torrington Park

Thames Water are carrying out Utility repair and maintenance works on Torrington Park, North Finchley, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 March 2024 at 08:00 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 16:24.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Lorne Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Lorne Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 March 2024 at 13:00 and could run through until 19 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2024 at 12:18.

London Borough Of Haringey logo
LONG TERM
Until
24 May 2024
Details
View Map
Share
Follow
Jellicoe Road

London Borough Of Haringey are carrying out Highway improvement works on Jellicoe Road, Tottenham, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2024 at 08:00 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 20 Mar 2024 at 08:13.

Transport for London (TfL) logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Finchley Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Finchley Road, Frognal And Fitzjohns, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2024 and could run through until 19 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Feb 2024 at 11:02.

London Borough Of Enfield logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Ladysmith Road

London Borough Of Enfield are carrying out Section 50 on Ladysmith Road, Edmonton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 08:00 and could run through until 19 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 2 Apr 2024 at 12:58.

London Borough Of Enfield logo
LONG TERM
Between
26 Mar and 29 Apr 2024
Details
View Map
Share
Follow
Footpath From Plevna Road To Montagu Road

London Borough Of Enfield are proposing to carry out Section 50 on Footpath From Plevna Road To Montagu Road, Edmonton.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 26 March 2024 and could run through until 29 April 2024. The works will impact the verge and footpath.

This roadwork event was last updated by London Borough Of Enfield on 25 Mar 2024 at 15:06.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Somerfield Road

Thames Water are carrying out Utility repair and maintenance works on Somerfield Road, Hackney, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 10:00 and could run through until 20 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2024 at 14:07.

Thames Water logo
Until
26 Apr 2024
Details
View Map
Share
Follow
Seven Sisters Road

Thames Water are carrying out Statutory Infrastructure Works on Seven Sisters Road, Hackney, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 March 2024 at 09:49 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Mar 2024 at 10:07.

London Borough Of Hackney logo
LONG TERM
Between
31 Mar and 29 Aug 2024
Details
View Map
Share
Follow
Marvin Street

London Borough Of Hackney are proposing to carry out Highway improvement works on Marvin Street, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 29 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 6 Dec 2023 at 10:05.

London Borough Of Camden logo
LONG TERM
Until
2 Aug 2024
Details
View Map
Share
Follow
Camden Mews

London Borough Of Camden are carrying out Highway improvement works on Camden Mews, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 08:00 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 1 Apr 2024 at 08:06.

Transport for London (TfL) logo
Between
1 and 29 Apr 2024
Details
View Map
Share
Follow
Seven Sisters Road

Transport for London (TfL) are proposing to carry out roadworks on Seven Sisters Road, Hackney, London.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 11:12.

Thames Water logo
LONG TERM
Until
13 May 2024
Details
View Map
Share
Follow
Inverforth Road

Thames Water are carrying out Utility asset works on Inverforth Road, Southgate.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 18:15 and could run through until 13 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 05:32.

Until
26 Apr 2024
Details
View Map
Share
Follow
Hungerford Road

London Borough Of Islington are carrying out Highway improvement works on Hungerford Road, Islington, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:00 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 5 Apr 2024 at 09:18.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lea Bridge Road

Thames Water are carrying out Utility repair and maintenance works on Lea Bridge Road, Hackney, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 10:45 and could run through until 19 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 09:45.

UK Power Networks Eastern & London logo
LONG TERM
Until
23 Sep 2024
Details
View Map
Share
Follow
Shrubland Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Shrubland Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 April 2024 at 14:40 and could run through until 23 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Apr 2024 at 14:45.

Thames Water logo
LONG TERM
Until
20 May 2024
Details
View Map
Share
Follow
Rosebank Grove

Thames Water are carrying out Utility asset works on Rosebank Grove, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 11:00 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 11:01.

London Borough Of Enfield logo
Until
27 Apr 2024
Details
View Map
Share
Follow
Footpath From Plevna Road To Montagu Road

London Borough Of Enfield are carrying out Section 50 on Footpath From Plevna Road To Montagu Road, Edmonton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:00 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 16 Apr 2024 at 14:24.

Cadent Gas logo
Finishing
Sunday
Details
View Map
Share
Follow
Burtonhole Lane

Cadent Gas are carrying out Utility repair and maintenance works on Burtonhole Lane, Mill Hill, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 07:53 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 08:12.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Access Road From Bincote Road To 146 Enfield Road

Cadent Gas are proposing to carry out Utility asset works on Access Road From Bincote Road To 146 Enfield Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 22 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Mar 2024 at 00:10.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Enfield Road

Cadent Gas are proposing to carry out Utility asset works on Enfield Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 22 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 14 Mar 2024 at 00:10.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Bittacy Hill

Thames Water are carrying out Utility repair and maintenance works on Bittacy Hill, Mill Hill, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 April 2024 at 09:42 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Apr 2024 at 11:26.

London Borough Of Barnet logo
Until
4 May 2024
Details
View Map
Share
Follow
Eastville Avenue

London Borough Of Barnet are carrying out Highway improvement works on Eastville Avenue, Golders Green, London.

These works are categorised as Major.

The works started on 5 April 2024 at 08:00 and could run through until 4 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 5 Apr 2024 at 10:58.

London Borough Of Barnet logo
Until
26 Apr 2024
Details
View Map
Share
Follow
Stapylton Road

London Borough Of Barnet are carrying out Highway improvement works on Stapylton Road, Barnet.

These works are categorised as Major.

The works started on 5 April 2024 at 08:00 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 5 Apr 2024 at 10:58.

Thames Water logo
LONG TERM
Until
10 May 2024
Details
View Map
Share
Follow
Palmerston Road

Thames Water are carrying out Utility asset works on Palmerston Road, Walthamstow.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 April 2024 at 09:00 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 08:47.

London Borough Of Hackney logo
Until
25 Apr 2024
Details
View Map
Share
Follow
Graham Road

London Borough Of Hackney are carrying out Highway improvement works on Graham Road, Hackney, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 April 2024 at 07:38 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 16 Apr 2024 at 09:35.

London Borough Of Barnet logo
LONG TERM
Between
7 Apr and 12 May 2024
Details
View Map
Share
Follow
Park Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Park Road, New Barnet, Barnet.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Jan 2024 at 11:03.

Transport for London (TfL) logo
Finishing
Monday
Details
View Map
Share
Follow
Monument Way

Transport for London (TfL) are carrying out Highway improvement works on Monument Way, Tottenham, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 08:00 and could run through until 22 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 8 Apr 2024 at 09:29.

Thames Water logo
Until
28 Apr 2024
Details
View Map
Share
Follow
Friern Barnet Lane

Thames Water are carrying out Utility repair and maintenance works on Friern Barnet Lane, Friern Barnet, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 10:00 and could run through until 28 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 12:25.

Network Rail logo
Until
30 Apr 2024
Details
View Map
Share
Follow
St Pancras Way

Network Rail are carrying out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 April 2024 at 10:00 and could run through until 30 April 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Network Rail on 9 Apr 2024 at 10:25.

Thames Water logo
Until
9 May 2024
Details
View Map
Share
Follow
Somers Road

Thames Water are carrying out Utility asset works on Somers Road, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2024 at 08:15 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 08:20.

Cadent Gas logo
Until
30 Apr 2024
Details
View Map
Share
Follow
Brigadier Avenue

Cadent Gas are carrying out Utility asset works on Brigadier Avenue, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 07:30 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Apr 2024 at 11:27.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Camden Road

Thames Water are carrying out Utility repair and maintenance works on Camden Road, Cantelowes, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 April 2024 at 08:00 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 09:47.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Priory Road

Thames Water are carrying out Utility repair and maintenance works on Priory Road, Hornsey, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 April 2024 at 11:00 and could run through until 20 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 11:57.

Cadent Gas logo
Between
11 and 29 Apr 2024
Details
View Map
Share
Follow
Brigadier Hill

Cadent Gas are proposing to carry out Utility asset works on Brigadier Hill, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 16 Apr 2024 at 15:42.

Thames Water logo
Until
11 May 2024
Details
View Map
Share
Follow
Kentish Town Road

Thames Water are carrying out New service connection on Kentish Town Road, Camden Town, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 April 2024 at 07:04 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Apr 2024 at 08:30.

Thames Water logo
Until
11 May 2024
Details
View Map
Share
Follow
Gaisford Street

Thames Water are carrying out roadworks on Gaisford Street, Cantelowes, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 April 2024 at 07:04 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Apr 2024 at 08:31.

London Borough Of Barnet logo
LONG TERM
Until
10 Jun 2024
Details
View Map
Share
Follow
The Vale

London Borough Of Barnet are carrying out Highway improvement works on The Vale, Childs Hill, London.

These works are categorised as Major.

The works started on 15 April 2024 at 08:30 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 16 Apr 2024 at 15:15.

Thames Water logo
LONG TERM
Between
14 Apr and 30 Jun 2024
Details
View Map
Share
Follow
Mansfield Road

Thames Water are proposing to carry out Utility asset works on Mansfield Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2023 at 16:30.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
The Drive

Thames Water are carrying out New service connection on The Drive, Walthamstow.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 06:55 and could run through until 18 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:00.

London Borough Of Barnet logo
Finishing
Monday
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 10:49.

London Borough Of Barnet logo
Until
27 Apr 2024
Details
View Map
Share
Follow
Ballards Lane

London Borough Of Barnet are carrying out Highway improvement works on Ballards Lane, Finchley, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 08:30 and could run through until 27 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 15 Apr 2024 at 10:23.

Cadent Gas logo
LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Alma Road

Cadent Gas are carrying out Utility asset works on Alma Road, Enfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:32 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 09:37.

Thames Water logo
LONG TERM
Until
16 May 2024
Details
View Map
Share
Follow
Mildmay Grove South

Thames Water are carrying out Utility repair and maintenance works on Mildmay Grove South, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 09:00 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 11:34.

London Borough Of Camden logo
LONG TERM
Until
27 Jun 2024
Details
View Map
Share
Follow
Baynes Mews

London Borough Of Camden are carrying out Highway repair and maintenance works on Baynes Mews, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2024 at 09:04 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 16 Apr 2024 at 09:04.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Upper Clapton Road

Cadent Gas are carrying out Utility repair and maintenance works on Upper Clapton Road, Hackney, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 10:19 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 11:45.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Winchelsea Road

Thames Water are carrying out Utility repair and maintenance works on Winchelsea Road, Tottenham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:52 and could run through until 22 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 10:29.

London Borough Of Barnet logo
Between
15 and 26 Apr 2024
Details
View Map
Share
Follow
Dudley Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Dudley Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Mar 2024 at 11:46.

Thames Water logo
Until
12 May 2024
Details
View Map
Share
Follow
Pegasus Way

Thames Water are carrying out Utility asset works on Pegasus Way, New Southgate, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 April 2024 at 07:20 and could run through until 12 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 Apr 2024 at 07:31.

Cadent Gas logo
Between
15 Apr and 1 May 2024
Details
View Map
Share
Follow
Brigadier Hill

Cadent Gas are proposing to carry out Utility asset works on Brigadier Hill, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Feb 2024 at 14:00.

Cadent Gas logo
Between
15 Apr and 1 May 2024
Details
View Map
Share
Follow
Brigadier Avenue

Cadent Gas are proposing to carry out Utility asset works on Brigadier Avenue, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 15 Feb 2024 at 14:30.

Cadent Gas logo
Between
15 Apr and 3 May 2024
Details
View Map
Share
Follow
Brigadier Avenue

Cadent Gas are proposing to carry out Utility asset works on Brigadier Avenue, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Apr 2024 at 09:40.

Transport for London (TfL) logo
Today
Details
View Map
Share
Lea Bridge Road

Transport for London (TfL) carried out Highway improvement works on Lea Bridge Road, Hackney, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 16 Apr 2024 and 18 Apr 2024 and were actually completed between 16 Apr 2024 (21:00) and 18 Apr 2024 (05:00). The works impacted the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Apr 2024 at 09:45.

Virgin Media logo
Finishing
Today
Details
View Map
Share
Follow
Vale Of Health

Virgin Media are carrying out Utility asset works on Vale Of Health, Hampstead Town, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 07:20 and could run through until 18 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 17 Apr 2024 at 07:31.

Hyperoptic logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Compton Avenue

Hyperoptic are proposing to carry out Utility asset works on Compton Avenue, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 27 Feb 2024 at 14:29.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Cornwallis Grove

BT are proposing to carry out Utility asset works on Cornwallis Grove, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Feb 2024 at 14:19.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Elstree Gardens

BT are proposing to carry out Utility asset works on Elstree Gardens, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Feb 2024 at 14:24.

UK Power Networks Eastern & London logo
Until
1 May 2024
Details
View Map
Share
Follow
Chase Road

UK Power Networks Eastern & London are carrying out New service connection on Chase Road, Southgate.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 09:39 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Apr 2024 at 09:39.

Between
17 Apr and 3 May 2024
Details
View Map
Share
Follow
Cockfosters Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Cockfosters Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 19 Mar 2024 at 16:09.

Finishing
Tuesday
Details
View Map
Share
Follow
Cockfosters Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Cockfosters Road, Enfield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 April 2024 at 20:00 and could run through until 23 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Apr 2024 at 07:32.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Dartmouth Park Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Dartmouth Park Hill, Highgate, London.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 April 2024 and run through until 24 April 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 10:00.

Thames Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Dartmouth Park Hill

Thames Water are carrying out Utility repair and maintenance works on Dartmouth Park Hill, Islington, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 April 2024 at 09:24 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 10:00.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
St Anns Road

Thames Water are carrying out Utility repair and maintenance works on St Anns Road, Tottenham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 18 April 2024 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 09:48.

BT logo
Today
Details
View Map
Share
Belmont Avenue

BT carried out Utility repair and maintenance works on Belmont Avenue, East Barnet, Barnet.

Two-way signals were in place for some or all of the period.

The works were completed on 18 April 2024 The works impacted the carriageway and verge.

This roadwork event was last updated by BT on 18 Apr 2024 at 16:21.

Hyperoptic logo
Finishing
Tuesday
Details
View Map
Share
Follow
Camden Street

Hyperoptic are proposing to carry out Utility asset works on Camden Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 23 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 10 Apr 2024 at 13:48.

LONG TERM
Between
21 Apr and 23 May 2024
Details
View Map
Share
Follow
Hungerford Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hungerford Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Apr 2024 at 06:21.

LONG TERM
Between
21 Apr and 23 May 2024
Details
View Map
Share
Follow
Hillmarton Road

London Borough Of Islington are proposing to carry out Highway improvement works on Hillmarton Road, Islington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 12 Apr 2024 at 06:51.

London Borough Of Barnet logo
Between
21 and 25 Apr 2024
Details
View Map
Share
Follow
Lullington Garth

London Borough Of Barnet are proposing to carry out Highway improvement works on Lullington Garth, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 10:56.

London Borough Of Barnet logo
Between
21 Apr and 3 May 2024
Details
View Map
Share
Follow
High Road

London Borough Of Barnet are proposing to carry out Highway improvement works on High Road, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 2 Jan 2024 at 10:55.

Between
22 Apr and 3 May 2024
Details
View Map
Share
Follow
Albion Road

G. Network Communications are proposing to carry out Remedial works on Albion Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by G. Network Communications on 3 Apr 2024 at 16:28.

Transport for London (TfL) logo
LONG TERM
Between
22 Apr and 15 Jun 2024
Details
View Map
Share
Follow
Bobby Moore Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Bobby Moore Way, Muswell Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 22 Jan 2024 at 12:51.

Thames Water logo
Between
22 and 26 Apr 2024
Details
View Map
Share
Follow
Myddleton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Myddleton Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 26 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 14:43.

Transport for London (TfL) logo
LONG TERM
Between
22 Apr and 15 Jun 2024
Details
View Map
Share
Follow
Colney Hatch Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 15 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Jan 2024 at 15:33.

London Borough Of Enfield logo
LONG TERM
Between
22 Apr and 31 May 2024
Details
View Map
Share
Follow
Middlesborough Road

London Borough Of Enfield are proposing to carry out Section 50 on Middlesborough Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 16 Apr 2024 at 15:19.

London Borough Of Enfield logo
Between
22 Apr and 19 May 2024
Details
View Map
Share
Follow
Kenninghall Road

London Borough Of Enfield are proposing to carry out Section 50 on Kenninghall Road, Edmonton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 13 Mar 2024 at 14:16.

Transport for London (TfL) logo
LONG TERM
Between
22 Apr and 31 May 2024
Details
View Map
Share
Follow
Meridian Way

Transport for London (TfL) are proposing to carry out Highway improvement works on Meridian Way, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 19 Mar 2024 at 11:17.

Transport for London (TfL) logo
LONG TERM
Between
22 Apr and 31 May 2024
Details
View Map
Share
Follow
Ardra Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ardra Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2024 at 14:54.

London Borough Of Enfield logo
Between
22 and 26 Apr 2024
Details
View Map
Share
Follow
Lea Valley Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Lea Valley Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 26 Jan 2024 at 11:41.

Thames Water logo
Between
23 Apr and 19 May 2024
Details
View Map
Share
Follow
Coleridge Road

Thames Water are proposing to carry out Utility asset works on Coleridge Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2024 at 10:25.

Thames Water logo
Between
23 Apr and 19 May 2024
Details
View Map
Share
Follow
Wolsey Avenue

Thames Water are proposing to carry out Utility asset works on Wolsey Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2024 at 10:24.

London Borough Of Haringey logo
Between
24 Apr and 2 May 2024
Details
View Map
Share
Follow
Ossian Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Ossian Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 5 Apr 2024 at 08:22.

BT logo
Between
25 and 29 Apr 2024
Details
View Map
Share
Follow
Grove Road

BT are proposing to carry out Utility asset works on Grove Road, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Apr 2024 at 14:07.

BT logo
Between
25 and 29 Apr 2024
Details
View Map
Share
Follow
St Anns Road

BT are proposing to carry out Utility asset works on St Anns Road, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Apr 2024 at 10:20.

London Borough Of Barnet logo
Between
25 Apr and 8 May 2024
Details
View Map
Share
Follow
Great North Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Great North Road, Underhill, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 17 Apr 2024 at 07:20.

Thames Water logo
Between
28 Apr and 1 May 2024
Details
View Map
Share
Follow
Perrin's Lane

Thames Water are proposing to carry out New service connection on Perrin's Lane, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 13:29.

Thames Water logo
Between
28 Apr and 2 May 2024
Details
View Map
Share
Follow
Lower Terrace

Thames Water are proposing to carry out Disconnection or alteration of supply on Lower Terrace, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 13:21.

London Borough Of Haringey logo
Between
28 Apr and 17 May 2024
Details
View Map
Share
Follow
Western Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Western Road, Wood Green, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 17 Apr 2024 at 11:08.

London Borough Of Haringey logo
Between
28 Apr and 3 May 2024
Details
View Map
Share
Follow
High Road

London Borough Of Haringey are proposing to carry out Highway repair and maintenance works on High Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 11 Apr 2024 at 15:54.

London Borough Of Barnet logo
Between
28 Apr and 1 May 2024
Details
View Map
Share
Follow
Trott Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Trott Road, Muswell Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 10:56.

London Borough Of Barnet logo
Between
28 and 30 Apr 2024
Details
View Map
Share
Follow
Osidge Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Osidge Lane, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 10:56.

Thames Water logo
Between
29 Apr and 3 May 2024
Details
View Map
Share
Follow
Parolles Road

Thames Water are proposing to carry out New service connection on Parolles Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 06:14.

Thames Water logo
LONG TERM
Between
29 Apr and 31 May 2024
Details
View Map
Share
Follow
Palmerston Road

Thames Water are proposing to carry out Utility asset works on Palmerston Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 08:48.

Thames Water logo
Between
29 Apr and 10 May 2024
Details
View Map
Share
Follow
Talbot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Talbot Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Feb 2024 at 12:11.

London Borough Of Haringey logo
Between
29 Apr and 2 May 2024
Details
View Map
Share
Follow
Tower Gardens Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Tower Gardens Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 17 Apr 2024 at 14:09.

Thames Water logo
Between
29 Apr and 17 May 2024
Details
View Map
Share
Follow
Fore Street

Thames Water are proposing to carry out Utility repair and maintenance works on Fore Street, Edmonton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 10:12.

Thames Water logo
Between
29 Apr and 17 May 2024
Details
View Map
Share
Follow
Shrubbery Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shrubbery Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Apr 2024 at 10:13.

Network Rail logo
Between
30 Apr and 20 May 2024
Details
View Map
Share
Follow
Baynes Street

Network Rail are proposing to carry out Works for Rail Purposes on Baynes Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 20 May 2024. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Network Rail on 11 Mar 2024 at 07:42.

London Borough Of Haringey logo
Between
30 Apr and 2 May 2024
Details
View Map
Share
Follow
Tower Gardens Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Tower Gardens Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 18 Apr 2024 at 12:27.

London Borough Of Barnet logo
Between
30 Apr and 2 May 2024
Details
View Map
Share
Follow
Osidge Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Osidge Lane, Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 10:56.

London Borough Of Waltham Forest logo
LONG TERM
Between
2 May and 1 Nov 2024
Details
View Map
Share
Follow
Sutherland Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Sutherland Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 2 Feb 2024 at 12:57.

Thames Water logo
LONG TERM
Between
2 May and 28 Jun 2024
Details
View Map
Share
Follow
Upper Park Road

Thames Water are proposing to carry out Utility asset works on Upper Park Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 May 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 11:03.

London Borough Of Barnet logo
Between
4 and 6 May 2024
Details
View Map
Share
Follow
Woodville Gardens

London Borough Of Barnet are proposing to carry out Highway improvement works on Woodville Gardens, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 May 2024 and could run through until 6 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Dec 2023 at 13:27.

Thames Water logo
LONG TERM
Between
4 May and 23 Jun 2024
Details
View Map
Share
Follow
Second Avenue

Thames Water are proposing to carry out Utility asset works on Second Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 May 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2023 at 14:03.

London Borough Of Barnet logo
Between
4 and 7 May 2024
Details
View Map
Share
Follow
Colney Hatch Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Colney Hatch Lane, Colney Hatch, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 May 2024 and could run through until 7 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jan 2024 at 13:05.

BT logo
Between
5 May and 2 Jun 2024
Details
View Map
Share
Follow
Agar Grove

BT are proposing to carry out Diversionary works on Agar Grove, Cantelowes, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Apr 2024 at 08:09.

Thames Water logo
Between
6 and 27 May 2024
Details
View Map
Share
Follow
Royal College Street

Thames Water are proposing to carry out Utility repair and maintenance works on Royal College Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Feb 2024 at 16:25.

Thames Water logo
Between
6 and 9 May 2024
Details
View Map
Share
Follow
Willow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Willow Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Apr 2024 at 09:38.

Transport for London (TfL) logo
Between
6 and 8 May 2024
Details
View Map
Share
Follow
Crowland Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Crowland Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 17 Apr 2024 at 12:34.

Cadent Gas logo
LONG TERM
Between
6 May and 13 Jul 2024
Details
View Map
Share
Follow
High Road

Cadent Gas are proposing to carry out Utility asset works on High Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 12:30.

Thames Water logo
Between
6 and 13 May 2024
Details
View Map
Share
Follow
Mount Pleasant Road

Thames Water are proposing to carry out Utility repair and maintenance works on Mount Pleasant Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 07:39.

Thames Water logo
Between
6 and 12 May 2024
Details
View Map
Share
Follow
Napier Road

Thames Water are proposing to carry out Statutory Infrastructure Works on Napier Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 09:57.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 26 Jul 2024
Details
View Map
Share
Follow
Clive Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Clive Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 13:59.

Transport for London (TfL) logo
LONG TERM
Between
6 May and 26 Jul 2024
Details
View Map
Share
Follow
Access Road From Southbury Road To 188-204 Southbury Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Access Road From Southbury Road To 188-204 Southbury Road, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 29 Feb 2024 at 13:58.

Thames Water logo
Between
6 and 10 May 2024
Details
View Map
Share
Follow
Little Park Gardens

Thames Water are proposing to carry out New service connection on Little Park Gardens, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Feb 2024 at 17:00.

UK Power Networks Eastern & London logo
Between
7 May and 5 Jun 2024
Details
View Map
Share
Follow
Crossfield Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Crossfield Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:30.

Thames Water logo
Between
7 and 13 May 2024
Details
View Map
Share
Follow
Queen Elizabeths Walk

Thames Water are proposing to carry out New service connection on Queen Elizabeths Walk, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Mar 2024 at 09:14.

London Borough Of Waltham Forest logo
Between
7 and 20 May 2024
Details
View Map
Share
Follow
Grove Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Grove Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 12 Mar 2024 at 16:28.

Cadent Gas logo
LONG TERM
Between
7 May and 14 Jul 2024
Details
View Map
Share
Follow
West Green Road

Cadent Gas are proposing to carry out Utility asset works on West Green Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 14 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Apr 2024 at 14:00.

Cadent Gas logo
LONG TERM
Between
7 May and 14 Jul 2024
Details
View Map
Share
Follow
Westerfield Road

Cadent Gas are proposing to carry out Utility asset works on Westerfield Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 14 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Apr 2024 at 14:00.

Cadent Gas logo
Between
7 and 11 May 2024
Details
View Map
Share
Follow
Montagu Road

Cadent Gas are proposing to carry out Utility repair and maintenance works on Montagu Road, Edmonton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Apr 2024 at 14:56.

Affinity Water logo
Between
7 and 9 May 2024
Details
View Map
Share
Follow
Great Bushey Drive

Affinity Water are proposing to carry out Utility repair and maintenance works on Great Bushey Drive, Whetstone, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 6 Feb 2024 at 12:38.

Thames Water logo
Between
7 and 13 May 2024
Details
View Map
Share
Follow
Little Park Gardens

Thames Water are proposing to carry out New service connection on Little Park Gardens, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 07:44.

London Borough Of Barnet logo
Between
9 and 11 May 2024
Details
View Map
Share
Follow
Friern Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 May 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Apr 2024 at 08:52.

Virgin Media logo
Between
10 and 24 May 2024
Details
View Map
Share
Follow
Hendon Way

Virgin Media are proposing to carry out Utility asset works on Hendon Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2024 and could run through until 24 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Virgin Media on 23 Feb 2024 at 16:24.

London Borough Of Barnet logo
Between
12 and 14 May 2024
Details
View Map
Share
Follow
Nether Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Nether Street, Ballards Lane To High Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Jan 2024 at 12:13.

Between
13 and 15 May 2024
Details
View Map
Share
Follow
Georgiana Street

G. Network Communications are proposing to carry out Remedial works on Georgiana Street, Camden Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by G. Network Communications on 10 Apr 2024 at 16:16.

Thames Water logo
Between
13 and 17 May 2024
Details
View Map
Share
Follow
Waterloo Terrace

Thames Water are proposing to carry out New service connection on Waterloo Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Feb 2024 at 13:51.

London Borough Of Camden logo
Between
13 and 15 May 2024
Details
View Map
Share
Follow
Grafton Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grafton Road, Gospel Oak, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 21 Feb 2024 at 11:54.

Transport for London (TfL) logo
Between
13 and 30 May 2024
Details
View Map
Share
Follow
Sandringham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Mar 2024 at 14:56.

Thames Water logo
Between
13 May and 3 Jun 2024
Details
View Map
Share
Follow
Chesterford Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Chesterford Gardens, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Feb 2024 at 09:31.

London Borough Of Camden logo
Between
13 and 15 May 2024
Details
View Map
Share
Follow
Willoughby Road

London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Willoughby Road, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Camden on 20 Feb 2024 at 17:00.

Thames Water logo
LONG TERM
Between
13 May and 18 Aug 2024
Details
View Map
Share
Follow
Holly Bush Hill

Thames Water are proposing to carry out Utility asset works on Holly Bush Hill, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 18 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Mar 2024 at 15:20.

London Borough Of Enfield logo
LONG TERM
Between
13 May and 31 Jul 2024
Details
View Map
Share
Follow
Brownlow Road

London Borough Of Enfield are proposing to carry out Highway improvement works on Brownlow Road, Southgate.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 31 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Enfield on 12 Apr 2024 at 07:54.

Network Rail logo
LONG TERM
Between
13 May and 12 Jul 2024
Details
View Map
Share
Follow
Bridport Road

Network Rail are proposing to carry out Works for Rail Purposes on Bridport Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 6 Mar 2024 at 16:06.

London Borough Of Barnet logo
Between
13 and 16 May 2024
Details
View Map
Share
Follow
Friern Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Apr 2024 at 08:42.

Thames Water logo
Between
13 and 16 May 2024
Details
View Map
Share
Follow
River Front

Thames Water are proposing to carry out New service connection on River Front, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Apr 2024 at 08:43.

BT logo
Between
14 and 18 May 2024
Details
View Map
Share
Follow
Sutton Place

BT are proposing to carry out Utility repair and maintenance works on Sutton Place, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 18 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Feb 2024 at 22:52.

London Borough Of Barnet logo
Between
14 and 16 May 2024
Details
View Map
Share
Follow
Nether Street

London Borough Of Barnet are proposing to carry out Highway improvement works on Nether Street, Ballards Lane To Dollis Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 3 Jan 2024 at 13:44.

Hyperoptic logo
Between
15 and 17 May 2024
Details
View Map
Share
Follow
Dagmar Terrace

Hyperoptic are proposing to carry out Utility asset works on Dagmar Terrace, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 15 Mar 2024 at 09:01.

Between
16 May and 4 Jun 2024
Details
View Map
Share
Follow
Thorpedale Road

London Borough Of Islington are proposing to carry out Highway improvement works on Thorpedale Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 4 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 16 Feb 2024 at 09:55.

London Borough Of Barnet logo
Between
16 and 21 May 2024
Details
View Map
Share
Follow
Friern Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Apr 2024 at 08:45.

London Borough Of Barnet logo
Between
18 and 21 May 2024
Details
View Map
Share
Follow
Wildwood Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Wildwood Road, Golders Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 22 Dec 2023 at 13:28.

Thames Water logo
Between
18 and 20 May 2024
Details
View Map
Share
Follow
Fiveways Corner

Thames Water are proposing to carry out roadworks on Fiveways Corner, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 09:55.

Cadent Gas logo
Between
18 May and 9 Jun 2024
Details
View Map
Share
Follow
Mollison Avenue

Cadent Gas are proposing to carry out Utility asset works on Mollison Avenue, Enfield.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 May 2024 and could run through until 9 June 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Cadent Gas on 25 Jan 2024 at 13:16.

Thames Water logo
LONG TERM
Between
19 May and 21 Jul 2024
Details
View Map
Share
Follow
Elderfield Road

Thames Water are proposing to carry out Utility asset works on Elderfield Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 21 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:55.

Cadent Gas logo
Between
19 and 23 May 2024
Details
View Map
Share
Follow
Crescent Road

Cadent Gas are proposing to carry out New service connection on Crescent Road, Wood Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 10:14.

Thames Water logo
Between
19 and 23 May 2024
Details
View Map
Share
Follow
Uvedale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Uvedale Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 10:16.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 May and 10 Jul 2024
Details
View Map
Share
Follow
Adamson Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adamson Road, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Mar 2024 at 15:13.

Thames Water logo
Between
20 May and 3 Jun 2024
Details
View Map
Share
Follow
Leverton Street

Thames Water are proposing to carry out Utility repair and maintenance works on Leverton Street, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Feb 2024 at 09:19.

London Borough Of Hackney logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Shacklewell Lane

London Borough Of Hackney are proposing to carry out Highway repair and maintenance works on Shacklewell Lane, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 28 Mar 2024 at 10:49.

Thames Water logo
LONG TERM
Between
20 May and 22 Jul 2024
Details
View Map
Share
Follow
Elderfield Road

Thames Water are proposing to carry out Utility asset works on Elderfield Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 12:47.

BT logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
Cazenove Road

BT are proposing to carry out Utility repair and maintenance works on Cazenove Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Feb 2024 at 22:54.

London Borough Of Waltham Forest logo
LONG TERM
Between
20 May and 1 Sep 2024
Details
View Map
Share
Follow
Hoe Street

London Borough Of Waltham Forest are proposing to carry out Works for road purposes on Hoe Street, Walthamstow.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 1 September 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 4 Apr 2024 at 15:22.

London Borough Of Barnet logo
LONG TERM
Between
20 May 2024 and 10 May 2025
Details
View Map
Share
Follow
Golders Green Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Golders Green Road, Golders Green, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Apr 2024 at 12:38.

UK Power Networks Eastern & London logo
Between
20 May and 14 Jun 2024
Details
View Map
Share
Follow
Exeter Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Exeter Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Feb 2024 at 14:58.

Thames Water logo
Between
20 and 27 May 2024
Details
View Map
Share
Follow
Romney Close

Thames Water are proposing to carry out Utility repair and maintenance works on Romney Close, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 27 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Dec 2023 at 13:01.

National Highways logo
Between
20 and 29 May 2024
Details
View Map
Share
Follow
Hall Lane

National Highways are proposing to carry out Highway repair and maintenance works on Hall Lane, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 9 Apr 2024 at 12:32.

London Borough Of Barnet logo
Between
20 May and 7 Jun 2024
Details
View Map
Share
Follow
Squires Lane

London Borough Of Barnet are proposing to carry out Utility asset works on Squires Lane, Finchley, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 10 Apr 2024 at 10:09.

London Borough Of Barnet logo
Between
21 and 25 May 2024
Details
View Map
Share
Follow
Friern Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2024 and could run through until 25 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Apr 2024 at 08:47.

BT logo
Between
22 and 24 May 2024
Details
View Map
Share
Follow
Greenman Street

BT are proposing to carry out Utility asset works on Greenman Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Feb 2024 at 10:00.

BT logo
Between
22 and 24 May 2024
Details
View Map
Share
Follow
Anglers Lane

BT are proposing to carry out Utility asset works on Anglers Lane, Kentish Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Feb 2024 at 14:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 May and 27 Aug 2024
Details
View Map
Share
Follow
Buckland Crescent

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Buckland Crescent, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 27 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:30.

UK Power Networks Eastern & London logo
LONG TERM
Between
24 May and 27 Aug 2024
Details
View Map
Share
Follow
Belsize Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Belsize Park, Frognal And Fitzjohns, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 27 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Mar 2024 at 10:28.

London Borough Of Barnet logo
Between
24 and 29 May 2024
Details
View Map
Share
Follow
Friern Barnet Lane

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Lane, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 12 Apr 2024 at 08:49.

Transport for London (TfL) logo
Between
26 and 29 May 2024
Details
View Map
Share
Follow
Folly Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Folly Lane, Chingford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 20 Feb 2024 at 15:40.

Thames Water logo
Between
27 May and 21 Jun 2024
Details
View Map
Share
Follow
Palmerston Road

Thames Water are proposing to carry out Utility asset works on Palmerston Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 10:25.

Electricity Network Company logo
Between
27 May and 13 Jun 2024
Details
View Map
Share
Follow
Albert Road

Electricity Network Company are proposing to carry out Utility asset works on Albert Road, New Barnet, Barnet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 27 Mar 2024 at 14:50.

Thames Water logo
Between
27 May and 3 Jun 2024
Details
View Map
Share
Follow
Beech Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Beech Hill, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Feb 2024 at 14:06.

Thames Water logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Collins Yard

Thames Water are proposing to carry out Remedial works on Collins Yard, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 08:15.

BT logo
Between
28 May and 1 Jun 2024
Details
View Map
Share
Follow
Crogsland Road

BT are proposing to carry out Utility asset works on Crogsland Road, Haverstock, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 1 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 18 Apr 2024 at 10:41.

Hyperoptic logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Wakeham Street

Hyperoptic are proposing to carry out Utility asset works on Wakeham Street, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 4 Mar 2024 at 14:52.

UK Power Networks Eastern & London logo
LONG TERM
Between
28 May and 28 Jun 2024
Details
View Map
Share
Follow
Lancaster Grove

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lancaster Grove, Belsize, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Mar 2024 at 09:32.

Murphy Power Distribution logo
Between
28 May and 2 Jun 2024
Details
View Map
Share
Follow
St John's Grove

Murphy Power Distribution are proposing to carry out Utility asset works on St John's Grove, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Murphy Power Distribution on 11 Apr 2024 at 10:00.

London Borough Of Waltham Forest logo
Between
28 May and 7 Jun 2024
Details
View Map
Share
Follow
Livingstone Road

London Borough Of Waltham Forest are proposing to carry out Highway repair and maintenance works on Livingstone Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Waltham Forest on 22 Mar 2024 at 17:46.

Thames Water logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
Fulbourne Road

Thames Water are proposing to carry out Utility repair and maintenance works on Fulbourne Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 13:44.

Virgin Media logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Ashley Lane

Virgin Media are proposing to carry out Utility asset works on Ashley Lane, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 13 Feb 2024 at 14:38.

Cadent Gas logo
Between
28 May and 3 Jun 2024
Details
View Map
Share
Follow
Booker Road

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Booker Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 11:04.

Thames Water logo
Between
28 May and 1 Jun 2024
Details
View Map
Share
Follow
King Edwards Road

Thames Water are proposing to carry out Utility repair and maintenance works on King Edwards Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 1 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 13:19.

Thames Water logo
Between
28 May and 3 Jun 2024
Details
View Map
Share
Follow
King Edwards Road

Thames Water are proposing to carry out Utility repair and maintenance works on King Edwards Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Apr 2024 at 11:40.

Thames Water logo
Between
28 May and 3 Jun 2024
Details
View Map
Share
Follow
King Edwards Road

Thames Water are proposing to carry out Utility repair and maintenance works on King Edwards Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 8 Apr 2024 at 11:27.

Thames Water logo
Between
29 and 31 May 2024
Details
View Map
Share
Follow
Collins Yard

Thames Water are proposing to carry out Remedial works on Collins Yard, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 13:17.

Network Rail logo
Between
29 and 31 May 2024
Details
View Map
Share
Follow
Royal College Street

Network Rail are proposing to carry out Works for Rail Purposes on Royal College Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 12 Feb 2024 at 16:02.

London Borough Of Barnet logo
Between
29 May and 5 Jun 2024
Details
View Map
Share
Follow
Church Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Church Way, Barnet.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 May 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 29 Jan 2024 at 09:28.

Cadent Gas logo
Between
30 May and 9 Jun 2024
Details
View Map
Share
Follow
Talbot Road

Cadent Gas are proposing to carry out Utility asset works on Talbot Road, Wood Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Nov 2023 at 10:34.

Transport for London (TfL) logo
Between
31 May and 10 Jun 2024
Details
View Map
Share
Follow
Sandringham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Sandringham Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2024 and could run through until 10 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Mar 2024 at 11:33.

London Borough Of Barnet logo
Between
2 and 4 Jun 2024
Details
View Map
Share
Follow
Winnington Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Winnington Road, East Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 1 Dec 2023 at 13:46.

Cadent Gas logo
Between
2 and 19 Jun 2024
Details
View Map
Share
Follow
Mollison Avenue

Cadent Gas are proposing to carry out Utility asset works on Mollison Avenue, Enfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 19 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 13:00.

Virgin Media logo
Between
3 and 5 Jun 2024
Details
View Map
Share
Follow
Vale Royal

Virgin Media are proposing to carry out Utility asset works on Vale Royal, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 20 Feb 2024 at 13:55.

UK Power Networks Eastern & London logo
Between
3 and 22 Jun 2024
Details
View Map
Share
Follow
Agar Grove

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Agar Grove, Cantelowes, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 22 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Apr 2024 at 13:43.

Thames Water logo
Between
3 and 7 Jun 2024
Details
View Map
Share
Follow
Collins Road

Thames Water are proposing to carry out New service connection on Collins Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 09:44.

Cadent Gas logo
Between
3 and 14 Jun 2024
Details
View Map
Share
Follow
Boundary Avenue

Cadent Gas are proposing to carry out Utility asset works on Boundary Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 14 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Feb 2024 at 13:15.

Thames Water logo
Between
3 and 23 Jun 2024
Details
View Map
Share
Follow
Talbot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Talbot Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 23 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 11:18.

London Borough Of Barnet logo
Between
3 and 9 Jun 2024
Details
View Map
Share
Follow
Holders Hill Circus

London Borough Of Barnet are proposing to carry out Highway improvement works on Holders Hill Circus, Hendon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 9 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 23 Jan 2024 at 12:21.

Thames Water logo
LONG TERM
Between
3 Jun and 22 Jul 2024
Details
View Map
Share
Follow
Gilda Avenue

Thames Water are proposing to carry out Utility asset works on Gilda Avenue, Enfield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Mar 2024 at 11:25.

London Borough Of Hackney logo
LONG TERM
Between
5 Jun and 7 Jul 2024
Details
View Map
Share
Follow
Lower Clapton Road

London Borough Of Hackney are proposing to carry out Highway improvement works on Lower Clapton Road, Hackney, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Hackney on 11 Apr 2024 at 10:16.

BT logo
Between
5 and 7 Jun 2024
Details
View Map
Share
Follow
Carew Road

BT are proposing to carry out Utility asset works on Carew Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Mar 2024 at 15:23.

Thames Water logo
LONG TERM
Between
7 Jun and 1 Sep 2024
Details
View Map
Share
Follow
Palmers Road

Thames Water are proposing to carry out Utility asset works on Palmers Road, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 1 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Jan 2024 at 11:06.

Cadent Gas logo
Between
9 and 23 Jun 2024
Details
View Map
Share
Follow
Waltham Way

Cadent Gas are proposing to carry out Utility asset works on Waltham Way, Chingford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 23 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 13:07.

UK Power Networks Eastern & London logo
Between
10 and 26 Jun 2024
Details
View Map
Share
Follow
Vale Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Vale Road, Tottenham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 26 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 13 Apr 2024 at 12:53.

London Borough Of Haringey logo
Between
10 and 16 Jun 2024
Details
View Map
Share
Follow
Fairfield Road

London Borough Of Haringey are proposing to carry out Highway improvement works on Fairfield Road, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 16 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Haringey on 9 Apr 2024 at 08:47.

Cadent Gas logo
Between
10 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Elgin Road

Cadent Gas are proposing to carry out Utility asset works on Elgin Road, Hornsey, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 1 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Nov 2023 at 10:50.

Thames Water logo
LONG TERM
Between
13 Jun and 25 Jul 2024
Details
View Map
Share
Follow
Sylvan Road

Thames Water are proposing to carry out Utility asset works on Sylvan Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 25 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Nov 2023 at 15:37.

Thames Water logo
Between
16 and 20 Jun 2024
Details
View Map
Share
Follow
St Andrews Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Andrews Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Apr 2024 at 07:25.

London Borough Of Barnet logo
LONG TERM
Between
17 Jun and 9 Oct 2024
Details
View Map
Share
Follow
Hampstead Way

London Borough Of Barnet are proposing to carry out Highway improvement works on Hampstead Way, Golders Green, London.

These works are categorised as Major.

The works will start on or after 17 June 2024 and could run through until 9 October 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 18 Apr 2024 at 14:34.

Thames Water logo
Between
17 and 19 Jun 2024
Details
View Map
Share
Follow
Cranley Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Cranley Gardens, Hornsey, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Mar 2024 at 08:38.

Thames Water logo
Between
17 and 21 Jun 2024
Details
View Map
Share
Follow
Myddleton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Myddleton Road, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Mar 2024 at 09:54.

UK Power Networks Eastern & London logo
Between
17 and 28 Jun 2024
Details
View Map
Share
Follow
Argon Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Argon Road, Edmonton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2024 at 19:04.

Thames Water logo
Between
17 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Lanercost Gardens

Thames Water are proposing to carry out Utility repair and maintenance works on Lanercost Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Apr 2024 at 09:54.

BT logo
Between
18 and 20 Jun 2024
Details
View Map
Share
Follow
Wellington Road

BT are proposing to carry out Utility repair and maintenance works on Wellington Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Apr 2024 at 14:58.

Thames Water logo
LONG TERM
Between
19 Jun 2024 and 30 Sep 2025
Details
View Map
Share
Follow
Eade Road

Thames Water are proposing to carry out Utility asset works on Eade Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 30 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Apr 2024 at 14:36.

Thames Water logo
Between
23 and 27 Jun 2024
Details
View Map
Share
Follow
Cedars Avenue

Thames Water are proposing to carry out Utility asset works on Cedars Avenue, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2023 at 15:28.

Between
24 and 28 Jun 2024
Details
View Map
Share
Follow
Caledonian Road

London Borough Of Islington are proposing to carry out Highway improvement works on Caledonian Road, Islington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Islington on 2 Apr 2024 at 11:43.

London Borough Of Barnet logo
Between
24 Jun and 22 Jul 2024
Details
View Map
Share
Follow
West Heath Road

London Borough Of Barnet are proposing to carry out Highway improvement works on West Heath Road, Hampstead, London.

These works are categorised as Major.

The works will start on or after 24 June 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Barnet on 2 Apr 2024 at 12:31.

Thames Water logo
Between
24 and 28 Jun 2024
Details
View Map
Share
Follow
Gloucester Road

Thames Water are proposing to carry out Utility repair and maintenance works on Gloucester Road, Tottenham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Mar 2024 at 10:19.

London Borough Of Barnet logo
Between
24 and 27 Jun 2024
Details
View Map
Share
Follow
Friern Barnet Road

London Borough Of Barnet are proposing to carry out Highway improvement works on Friern Barnet Road, Friern Barnet, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 4 Apr 2024 at 10:37.

BT logo
Between
24 and 28 Jun 2024
Details
View Map
Share
Follow
Carpenter Gardens

BT are proposing to carry out New service connection on Carpenter Gardens, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 20 Mar 2024 at 12:29.

Virgin Media logo
Between
25 and 27 Jun 2024
Details
View Map
Share
Follow
Heath Street

Virgin Media are proposing to carry out Utility asset works on Heath Street, Hampstead Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2024 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 12 Mar 2024 at 11:17.

Thames Water logo
Between
1 and 4 Jul 2024
Details
View Map
Share
Follow
Camden Park Road

Thames Water are proposing to carry out New service connection on Camden Park Road, Cantelowes, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 10:08.

Thames Water logo
Between
1 and 4 Jul 2024
Details
View Map
Share
Follow
Rushmore Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rushmore Road, Hackney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 4 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 14:25.

BT logo
Between
1 and 5 Jul 2024
Details
View Map
Share
Follow
Risley Avenue

BT are proposing to carry out Utility asset works on Risley Avenue, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 5 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 4 Apr 2024 at 17:18.

London Borough Of Barnet logo
Between
1 and 6 Jul 2024
Details
View Map
Share
Follow
The Ridgeway

London Borough Of Barnet are proposing to carry out Highway improvement works on The Ridgeway, Mill Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 6 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Barnet on 5 Apr 2024 at 12:40.

Thames Water logo
LONG TERM
Between
1 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Morton Crescent

Thames Water are proposing to carry out Utility asset works on Morton Crescent, Southgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Feb 2024 at 14:47.

Thames Water logo
Between
7 and 21 Jul 2024
Details
View Map
Share
Follow
Erskine Road

Thames Water are proposing to carry out Utility asset works on Erskine Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 21 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Nov 2023 at 14:51.

Cadent Gas logo
Between
7 Jul and 1 Aug 2024
Details
View Map
Share
Follow
Westbury Avenue

Cadent Gas are proposing to carry out Utility asset works on Westbury Avenue, Wood Green, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2024 at 15:40.

Cadent Gas logo
Between
7 Jul and 1 Aug 2024
Details
View Map
Share
Follow
Crawley Road

Cadent Gas are proposing to carry out Utility asset works on Crawley Road, Tottenham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Jan 2024 at 15:47.

Cadent Gas logo
Between
7 and 11 Jul 2024
Details
View Map
Share
Follow
Suez Road

Cadent Gas are proposing to carry out Utility asset works on Suez Road, Enfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 9 Apr 2024 at 14:14.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Jul and 17 Aug 2024
Details
View Map
Share
Follow
Howard Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Howard Road, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 17 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2024 at 14:35.

UK Power Networks Eastern & London logo
LONG TERM
Between
8 Jul and 24 Aug 2024
Details
View Map
Share
Follow
Priory Court

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Priory Court, Walthamstow.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 24 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Apr 2024 at 14:50.

BT logo
Between
9 and 12 Jul 2024
Details
View Map
Share
Follow
Granary Street

BT are proposing to carry out Utility asset works on Granary Street, St Pancras And Somers Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 July 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Apr 2024 at 09:19.

Thames Water logo
LONG TERM
Between
10 Jul and 8 Nov 2024
Details
View Map
Share
Follow
Warner Road

Thames Water are proposing to carry out Utility asset works on Warner Road, Walthamstow.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 8 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Nov 2023 at 15:36.

Thames Water logo
Between
14 and 22 Jul 2024
Details
View Map
Share
Follow
Cheviot Gardens

Thames Water are proposing to carry out New service connection on Cheviot Gardens, Cricklewood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 22 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Apr 2024 at 12:13.

UK Power Networks Eastern & London logo
Between
15 and 25 Jul 2024
Details
View Map
Share
Follow
Balls Pond Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Balls Pond Road, Hackney, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Apr 2024 at 15:05.

Cadent Gas logo
LONG TERM
Between
15 Jul and 13 Sep 2024
Details
View Map
Share
Follow
High Road

Cadent Gas are proposing to carry out Utility asset works on High Road, Tottenham, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 13 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Apr 2024 at 14:00.

Virgin Media logo
Between
15 and 29 Jul 2024
Details
View Map
Share
Follow
East End Road

Virgin Media are proposing to carry out Utility asset works on East End Road, Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 12 Apr 2024 at 15:01.

Affinity Water logo
Between
15 and 18 Jul 2024
Details
View Map
Share
Follow
Fenstanton Avenue

Affinity Water are proposing to carry out Utility repair and maintenance works on Fenstanton Avenue, North Finchley, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 18 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 17 Apr 2024 at 10:28.

Thames Water logo
On
16 Jul 2024
Details
View Map
Share
Follow
Coverdale Road

Thames Water are proposing to carry out Utility repair and maintenance works on Coverdale Road, New Southgate, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 16 July 2024 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 11:53.


Roadworks Map near to N22 4YF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Apr 2024 17:13
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to N22 4YF (43 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
London Borough Of Haringey logo
WHITTINGTON ROAD, WOOD GREEN 
(0.0 miles)
London Borough Of Haringey
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 16 Apr 2024 - 18 Apr 2024
0.0
Details
Share
Follow
2
UK Power Networks Eastern & London logo
MYDDLETON ROAD, WOOD GREEN 
(0.1 miles)
UK Power Networks Eastern & London
New service connection - Footway - Some carriageway incursion
Complete
15 Apr 2024 10:00 - 18 Apr 2024 11:48
0.1
Details
Share
3
London Borough Of Haringey logo
MARLBOROUGH ROAD, WOOD GREEN 
(0.1 miles)
London Borough Of Haringey
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 18 Apr 2024 - 22 Apr 2024
0.1
Details
Share
Follow
4
London Borough Of Haringey logo
PALACE ROAD, WOOD GREEN 
(0.2 miles)
London Borough Of Haringey
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 19 Apr 2024 - 23 Apr 2024
0.2
Details
Share
Follow
5
UK Power Networks Eastern & London logo
BROWNLOW ROAD, WOOD GREEN 
(0.2 miles)
UK Power Networks Eastern & London
New service connection - Footway - Two-way signals
In Progress
Since: 15 Apr 2024 08:31
(Scheduled: 15 Apr 2024 - 19 Apr 2024)
0.2
Details
Share
Follow
6
London Borough Of Enfield logo
MAJOR
  
WARWICK ROAD 
(0.4 miles)
London Borough Of Enfield
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 15 Jan 2024 - 12 Jul 2024
0.4
Details
Share
Follow
7
London Borough Of Haringey logo
BRAEMAR AVENUE, WOOD GREEN 
(0.4 miles)
London Borough Of Haringey
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 18 Apr 2024 - 22 Apr 2024
0.4
Details
Share
Follow
8
London Borough Of Enfield logo
MAJOR
  
MAIDSTONE ROAD 
(0.4 miles)
London Borough Of Enfield
Highway improvement works - Carriageway - Road closure
In Progress
Since: 15 Jan 2024 08:00
(Scheduled: 15 Jan 2024 - 12 Jul 2024)
0.4
Details
Share
Follow
9
BT logo
CRESCENT ROAD, WOOD GREEN 
(0.4 miles)
BT
Utility asset works - Footway, Verge - No carriageway incursion
Complete
17 Apr 2024 09:00 - 16:45
0.4
Details
Share
10
Its Technology Group logo
URGENT
  
EARLHAM GROVE, WOOD GREEN 
(0.4 miles)
Its Technology Group
Utility repair and maintenance works - Footway - Some carriageway incursion
Complete
16 Apr 2024 09:46 - 17:12
0.4
Details
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data