ROADWORKS SUMMARY
IP11 8JY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for IP11 8JY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to IP11 8JY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

Cadent Gas logo

Tomorrow
Details
View Map
Share
Thornley Road

Cadent Gas carried out Utility asset works on Thornley Road, Felixstowe.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 21 Mar 2024 and 29 Mar 2024 and were actually completed between 21 Mar 2024 (08:00) and 28 Mar 2024 (10:56). The works impacted the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 12:57.

Cadent Gas logo

Finishing
Wednesday
Details
View Map
Share
Garfield Road

Cadent Gas are carrying out Utility asset works on Garfield Road, Felixstowe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 05:47 and could run through until 3 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 09:04.

Cadent Gas logo

Between
1 and 11 Apr 2024
Details
View Map
Share
Croutel Road

Cadent Gas are proposing to carry out Utility asset works on Croutel Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 11 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Mar 2024 at 11:49.

Cadent Gas logo

Finishing
Wednesday
Details
View Map
Share
Fronks Road Service Road

Cadent Gas are proposing to carry out New service connection on Fronks Road Service Road, Harwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 31 Jan 2024 at 07:59.

Cadent Gas logo

LONG TERM
Between
3 Apr and 9 May 2024
Details
View Map
Share
Foxgrove Lane

Cadent Gas are proposing to carry out Utility asset works on Foxgrove Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2024 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 11:08.

Essex County Council logo

Between
6 and 26 Apr 2024
Details
View Map
Share
High Street

Essex County Council are proposing to carry out Highway improvement works on High Street, Harwich.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 26 Feb 2024 at 15:03.

Cadent Gas logo

Between
7 and 18 Apr 2024
Details
View Map
Share
Marcus Road

Cadent Gas are proposing to carry out Utility asset works on Marcus Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2024 and could run through until 18 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 13:34.

Suffolk County Council logo

LONG TERM
Between
14 Apr and 18 May 2024
Details
View Map
Share
Candlet Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Candlet Road, Felixstowe.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 28 Mar 2024 at 10:02.

Suffolk County Council logo

LONG TERM
Between
14 Apr and 18 May 2024
Details
View Map
Share
Candlet Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Candlet Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2024 and could run through until 18 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Suffolk County Council on 18 Mar 2024 at 08:09.

Suffolk County Council logo

LONG TERM
Between
15 Apr and 17 May 2024
Details
View Map
Share
Picketts Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Picketts Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 29 Feb 2024 at 14:37.

Cadent Gas logo

Between
16 and 25 Apr 2024
Details
View Map
Share
Maybush Lane

Cadent Gas are proposing to carry out Utility asset works on Maybush Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 25 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Feb 2024 at 08:25.

Cadent Gas logo

Between
16 and 29 Apr 2024
Details
View Map
Share
Falcon Street

Cadent Gas are proposing to carry out Utility asset works on Falcon Street, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Mar 2024 at 09:32.

Affinity Water logo

Between
21 and 23 Apr 2024
Details
View Map
Share
Hordle Street

Affinity Water are proposing to carry out Utility repair and maintenance works on Hordle Street, Dovercourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 23 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 27 Feb 2024 at 15:20.

Cadent Gas logo

Between
21 Apr and 16 May 2024
Details
View Map
Share
Princes Road

Cadent Gas are proposing to carry out Utility asset works on Princes Road, Felixstowe.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 13:49.

Cadent Gas logo

Between
22 and 28 Apr 2024
Details
View Map
Share
Brook Lane

Cadent Gas are proposing to carry out Utility asset works on Brook Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 28 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Feb 2024 at 10:45.

Cadent Gas logo

Between
24 Apr and 3 May 2024
Details
View Map
Share
St Andrews Road

Cadent Gas are proposing to carry out Utility asset works on St Andrews Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Feb 2024 at 10:30.

Cadent Gas logo

Between
28 Apr and 22 May 2024
Details
View Map
Share
Ranelagh Road

Cadent Gas are proposing to carry out Utility asset works on Ranelagh Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 22 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Mar 2024 at 13:44.

Essex County Council logo

Between
28 Apr and 18 May 2024
Details
View Map
Share
High Street

Essex County Council are proposing to carry out Highway improvement works on High Street, Harwich.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 18 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Feb 2024 at 10:56.

Essex County Council logo

Between
28 Apr and 18 May 2024
Details
View Map
Share
Kingsway

Essex County Council are proposing to carry out Highway improvement works on Kingsway, Dovercourt.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2024 and could run through until 18 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Essex County Council on 29 Feb 2024 at 10:59.

Cadent Gas logo

Between
29 Apr and 10 May 2024
Details
View Map
Share
Rosebery Road

Cadent Gas are proposing to carry out Utility asset works on Rosebery Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Feb 2024 at 14:47.

Anglian Water logo

Between
29 Apr and 3 May 2024
Details
View Map
Share
Garrison Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Garrison Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Jan 2024 at 14:25.

Cadent Gas logo

Between
6 and 19 May 2024
Details
View Map
Share
Princes Road

Cadent Gas are proposing to carry out Utility asset works on Princes Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 10:58.

Cadent Gas logo

Between
6 and 19 May 2024
Details
View Map
Share
Wolsey Gardens

Cadent Gas are proposing to carry out Utility asset works on Wolsey Gardens, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 10:58.

Cadent Gas logo

Between
6 and 19 May 2024
Details
View Map
Share
South Hill

Cadent Gas are proposing to carry out Utility asset works on South Hill, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 10:58.

Cadent Gas logo

Between
12 and 23 May 2024
Details
View Map
Share
Felix Road

Cadent Gas are proposing to carry out Utility asset works on Felix Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 23 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 11:49.

Cadent Gas logo

Between
19 and 27 May 2024
Details
View Map
Share
Quilter Road

Cadent Gas are proposing to carry out Utility asset works on Quilter Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 14:04.

Cadent Gas logo

Between
19 May and 2 Jun 2024
Details
View Map
Share
Queen Street

Cadent Gas are proposing to carry out Utility asset works on Queen Street, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 2 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2024 at 13:00.

Cadent Gas logo

Between
19 and 27 May 2024
Details
View Map
Share
Brook Lane

Cadent Gas are proposing to carry out Utility asset works on Brook Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 09:59.

Cadent Gas logo

Between
19 and 27 May 2024
Details
View Map
Share
Constable Road

Cadent Gas are proposing to carry out Utility asset works on Constable Road, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 09:59.

Suffolk County Council logo

Between
9 and 30 Jun 2024
Details
View Map
Share
Garrison Lane

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Garrison Lane, Felixstowe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 30 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Suffolk County Council on 28 Mar 2024 at 08:12.

Anglian Water logo

Between
9 and 11 Jun 2024
Details
View Map
Share
Tenth Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Tenth Road, Bucklesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 11 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 18 Mar 2024 at 10:26.

Suffolk County Council logo

Between
13 Jun and 3 Jul 2024
Details
View Map
Share
Ferry Road

Suffolk County Council are proposing to carry out Highway repair and maintenance works on Ferry Road, Bawdsey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 June 2024 and could run through until 3 July 2024. The works will impact the verge only.

This roadwork event was last updated by Suffolk County Council on 28 Mar 2024 at 17:33.

Independent Water Networks logo

LONG TERM
Between
23 Jun and 28 Jul 2024
Details
View Map
Share
High Road

Independent Water Networks are proposing to carry out New service connection on High Road, Trimley St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 28 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Independent Water Networks on 25 Mar 2024 at 16:05.

LONG TERM
Between
23 Jun and 28 Jul 2024
Details
View Map
Share
High Road

GTC Pipelines are proposing to carry out New service connection on High Road, Trimley St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 28 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by GTC Pipelines on 25 Mar 2024 at 16:05.


Roadworks Map near to IP11 8JY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Mar 2024 21:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.

Roadworks Listing near to IP11 8JY (23 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Suffolk County Council logo
MAJOR
  
GRANGE ROAD (0.1 miles)
Suffolk County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 27 Mar 2024 - 28 Mar 2024
0.1
Share
2
BT logo
GRANGE ROAD (0.2 miles), SUFFOLK
BT
Remedial works - Footway, Verge - Some carriageway incursion
In Progress
Since: 27 Mar 2024 09:30
(Scheduled: 26 Mar 2024 - 28 Mar 2024)
0.2
Share
3
Suffolk County Council logo
MAJOR
  
MAIDSTONE ROAD (0.2 miles)
Suffolk County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 27 Mar 2024 - 28 Mar 2024
0.2
Share
4
BT logo
KING STREET (0.4 miles), SUFFOLK
BT
Permanent reinstatement - Footway - Give and take
In Progress
Since: 27 Mar 2024 16:32
(Scheduled: 26 Mar 2024 - 28 Mar 2024)
0.4
Share
5
Cadent Gas logo
EMERGENCY
  
THE WALK (0.4 miles)
Cadent Gas
Utility repair and maintenance works - Footpath - No carriageway incursion
In Progress
Since: 27 Mar 2024 15:38
(Scheduled: 27 Mar 2024 - 7 Apr 2024)
0.4
Share
6
BT logo
MILL LANE (0.5 miles), SUFFOLK
BT
Permanent reinstatement - Footway - Give and take
Planned
Scheduled: 28 Mar 2024 - 3 Apr 2024
0.5
Share
7
Anglian Water logo
GARRISON LANE (0.5 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 25 Mar 2024 - 28 Mar 2024
0.5
Share
8
Cadent Gas logo
MAJOR
  
GARFIELD ROAD (0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
In Progress
Since: 25 Mar 2024 05:47
(Scheduled: 25 Mar 2024 - 3 Apr 2024)
0.6
Share
9
BT logo
CHURCH LANE (0.6 miles), SUFFOLK
BT
Utility asset works - Footway - Multi-way signals
Planned
Scheduled: 26 Mar 2024 - 28 Mar 2024
0.6
Share
10
Cadent Gas logo
VICTORIA ROAD (0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 25 Mar 2024 05:43
(Scheduled: 25 Mar 2024 - 3 Apr 2024)
0.6
Share
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.