ROADWORKS SUMMARY
Kingsfield Road, HARROW, HA1 3DE
Introduction
View current and future planned roadworks and road closures for Kingsfield Road, HA1 3DE and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Kingsfield Road, HARROW, HA1 3DE
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kingsfield Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
9 Apr 2024
HS2 are carrying out Works for Rail Purposes on Eastcote Lane, Northolt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 July 2023 at 07:00 and could run through until 9 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 18 Mar 2024 at 10:37.
17 May 2024
London Borough Of Ealing are carrying out Highway improvement works on Ealing Road, Northolt.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 August 2023 at 07:00 and could run through until 17 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 11 Mar 2024 at 15:01.
26 Apr 2024
London Borough Of Ealing are carrying out Highway improvement works on Kensington Road, Northolt.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 September 2023 at 07:00 and could run through until 26 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 4 Mar 2024 at 14:43.
21 Apr 2024
HS2 are carrying out Utility asset works on Bennetts Avenue, Greenford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 08:00 and could run through until 21 April 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 11 Mar 2024 at 15:01.
21 Apr 2024
HS2 are carrying out Utility asset works on Uneeda Drive, Greenford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 09:30 and could run through until 21 April 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 11 Mar 2024 at 15:01.
21 Apr 2024
HS2 are carrying out Utility asset works on Rockware Avenue, Greenford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 September 2023 at 07:00 and could run through until 21 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 11 Mar 2024 at 15:01.
21 Apr 2024
HS2 are carrying out Utility asset works on Greenford Road, Greenford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 October 2023 at 05:00 and could run through until 21 April 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 11 Mar 2024 at 15:01.
13 Apr 2024
ESP Electricity are carrying out Utility asset works on St Thomas's Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 November 2023 at 08:54 and could run through until 13 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 28 Mar 2024 at 17:57.
29 Apr 2024
London Borough Of Ealing are carrying out Highway improvement works on Station Parade, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 08:00 and could run through until 29 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 29 Nov 2023 at 11:49.
26 Apr 2024
Affinity Water are carrying out Utility asset works on Rickmansworth Road, Northwood.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 January 2024 at 13:12 and could run through until 26 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 26 Mar 2024 at 15:28.
12 Jul 2024
HS2 are carrying out Utility asset works on Atlas Road, Park Royal.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 05:00 and could run through until 12 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 20 Mar 2024 at 12:47.
14 Apr 2024
Affinity Water are carrying out Utility repair and maintenance works on Preston Road, Wembley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 January 2024 at 10:15 and could run through until 14 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 15 Jan 2024 at 12:13.
15 Apr 2024
London Borough Of Ealing are carrying out Permanent reinstatement on Whitecote Road, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 00:00 and could run through until 15 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 23 Feb 2024 at 15:25.
Tomorrow
London Borough Of Ealing are carrying out Highway improvement works on St Stephens Avenue, West Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:00 and could run through until 29 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 5 Feb 2024 at 08:33.
4 Apr 2024
ESP Electricity are carrying out Utility asset works on Chase Road, Park Royal.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:00 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 22 Feb 2024 at 15:05.
Tuesday
London Borough Of Barnet are carrying out Highway repair and maintenance works on Edgware Road, Kingsbury, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 February 2024 at 08:00 and could run through until 2 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 22:20.
1 Mar 2025
London Borough Of Barnet are carrying out Highway improvement works on Charcot Road, Colindale, London.
These works are categorised as Major.
The works started on 8 February 2024 at 00:00 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 25 Mar 2024 at 09:19.
14 Feb and 12 Jul 2024
HS2 are proposing to carry out Utility asset works on West Gate, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2024 and could run through until 12 July 2024. The works will impact the footway, carriageway, footpath and parking place.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by HS2 on 13 Feb 2024 at 14:03.
Transport for London (TfL) carried out Highway improvement works on Church Road, Hayes.
These works were categorised as Major.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 19 Feb 2024 and 29 Mar 2024 and were actually completed between 19 Feb 2024 (08:01) and 28 Mar 2024 (17:00). The works impacted the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 17:41.
Transport for London (TfL) carried out Highway improvement works on Uxbridge Road, Hayes.
These works were categorised as Major.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 19 Feb 2024 and 29 Mar 2024 and were actually completed between 19 Feb 2024 (08:00) and 28 Mar 2024 (17:00). The works impacted the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 17:41.
11 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on Bridgewater Road, Wembley.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 13:30 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 09:22.
11 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on Whitton Avenue East, Greenford.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 10:15 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 12:06.
9 Apr 2024
Cadent Gas are carrying out Utility asset works on Northolt Road, South Harrow.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 07:30 and could run through until 9 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Feb 2024 at 08:09.
5 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on Edgware Road, Kingsbury, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:01 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:45.
5 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on The Hyde, Colindale, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:01 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:47.
5 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on The Hyde, Colindale, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:01 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:47.
5 Apr 2024
Transport for London (TfL) are carrying out Highway improvement works on Edgware Road, Kingsbury, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:01 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 27 Feb 2024 at 09:46.
Wednesday
Hertfordshire County Council are carrying out Highway repair and maintenance works on Bridlington Road, South Oxhey.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 February 2024 at 08:00 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 20 Mar 2024 at 14:05.
Sunday
City Of London Telecomms are carrying out Utility asset works on Yeading Lane, Hayes.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 March 2024 at 08:00 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 1 Mar 2024 at 09:21.
Sunday
G. Network Communications are proposing to carry out Utility asset works on Yeading Lane, Hayes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 February 2024 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 13 Feb 2024 at 15:00.
1 Mar 2024 and 1 Sep 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 1 March 2024 and could run through until 1 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 26 Mar 2024 at 08:17.
14 Apr 2024
Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 March 2024 at 23:00 and could run through until 14 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Mar 2024 at 20:31.
11 May 2024
Transport for London (TfL) are carrying out Highway improvement works on Western Avenue, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2024 at 07:31 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Mar 2024 at 14:03.
4 Mar and 1 Oct 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Church Road, Northolt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 1 October 2024. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 10 Oct 2023 at 12:15.
5 Apr 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Woodstock Road, Wembley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:00 and could run through until 5 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 4 Mar 2024 at 09:25.
4 Mar and 1 Oct 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Mandeville Road, Northolt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 1 October 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 10 Oct 2023 at 12:15.
28 Jun 2024
London Borough Of Ealing are carrying out Highway improvement works on Uxbridge Road, Southall.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 09:00 and could run through until 28 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 11 Mar 2024 at 09:42.
8 Apr 2024
Cadent Gas are carrying out Utility asset works on Craven Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 March 2024 at 10:40 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 12 Mar 2024 at 10:55.
Monday
Cadent Gas are carrying out Utility asset works on Bonnersfield Lane, Harrow.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 09:06 and could run through until 1 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2024 at 09:11.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on Hale Drive, Mill Hill, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 12:00 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 12:24.
1 May 2024
Affinity Water are carrying out Utility asset works on Hayling Road, Hayling, South Oxhey.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 14 March 2024 at 08:40 and could run through until 1 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 14 Mar 2024 at 08:40.
Tomorrow
Affinity Water are carrying out Utility repair and maintenance works on Heather Park Drive, Wembley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 10:15 and could run through until 29 March 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 18 Mar 2024 at 10:33.
26 Apr 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Sussex Crescent, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 26 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Mar 2024 at 08:33.
26 Apr 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Southwell Avenue, Northolt.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 08:00 and could run through until 26 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Mar 2024 at 08:16.
29 Apr 2024
Affinity Water are carrying out Utility asset works on Potter Street Hill, Pinner.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 March 2024 at 09:03 and could run through until 29 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 19 Mar 2024 at 09:03.
18 Mar and 16 Apr 2024
Cadent Gas are proposing to carry out Utility asset works on Clay Lane, Bushey Heath.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 March 2024 and could run through until 16 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Feb 2024 at 09:26.
22 Mar and 8 Apr 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Coles Green Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 March 2024 and could run through until 8 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 15 Jan 2024 at 21:13.
5 Jun 2024
Cadent Gas are carrying out Utility asset works on Heathbourne Road, Bushey Heath.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 15:00 and could run through until 5 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Mar 2024 at 15:11.
Monday
Thames Water are carrying out Utility repair and maintenance works on Rosebank Road, Hanwell.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 09:30 and could run through until 1 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:51.
Tuesday
Affinity Water are carrying out Utility repair and maintenance works on Uxbridge Road, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 09:42 and could run through until 2 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Mar 2024 at 15:06.
24 Apr 2024
G2 Energy IDNO are carrying out Utility asset works on Alliance Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 08:00 and could run through until 24 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by G2 Energy IDNO on 25 Mar 2024 at 08:46.
23 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on Parkside, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 March 2024 at 11:00 and could run through until 23 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 13:58.
Tomorrow
Cadent Gas are proposing to carry out New service connection on Windermere Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 March 2024 and could run through until 29 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2023 at 22:31.
25 Mar and 8 Apr 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on The Concourse, Colindale, London.
These works are categorised as Major.
The works will start on or after 25 March 2024 and could run through until 8 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 12 Feb 2024 at 15:29.
4 Apr 2024
Cadent Gas are carrying out Utility repair and maintenance works on Stanley Park Drive, Wembley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 10:11 and could run through until 4 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 13:45.
7 Apr 2024
Affinity Water are carrying out Utility repair and maintenance works on Elton Avenue, Greenford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2024 at 10:11 and could run through until 7 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 28 Mar 2024 at 12:06.
26 Mar and 10 Apr 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Buck Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 March 2024 and could run through until 10 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 15 Jan 2024 at 18:20.
Monday
Affinity Water are carrying out Utility repair and maintenance works on Uxbridge Road, Southall.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 March 2024 at 08:03 and could run through until 1 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 27 Mar 2024 at 15:06.
28 Mar and 3 Jun 2024
ESP Electricity are proposing to carry out Utility asset works on Bashley Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 15 Mar 2024 at 15:02.
4 Apr 2024
Thames Water are carrying out Utility repair and maintenance works on Chaplin Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 09:22 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Mar 2024 at 12:45.
28 Mar and 14 Apr 2024
London Borough Of Hillingdon are proposing to carry out Utility repair and maintenance works on Potter Street Hill, Northwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 March 2024 and could run through until 14 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Hillingdon on 14 Feb 2024 at 07:44.
29 Mar and 14 Apr 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Heming Road, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 March 2024 and could run through until 14 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2023 at 09:48.
29 Mar and 15 Apr 2024
Cadent Gas are proposing to carry out Utility asset works on Merry Hill Road, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 March 2024 and could run through until 15 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 13:53.
29 Mar and 14 Apr 2024
Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Bushey.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 March 2024 and could run through until 14 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Jan 2024 at 15:44.
Tuesday
Murphy Power Distribution were proposing to carry out Utility asset works on Windermere Road, Southall.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 March 2024 and run through until 2 April 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 28 Mar 2024 at 10:57.
Tuesday
Murphy Power Distribution are proposing to carry out Utility asset works on Windermere Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 March 2024 and could run through until 2 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 28 Mar 2024 at 12:07.
Tuesday
Murphy Power Distribution are proposing to carry out Utility asset works on Windermere Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 March 2024 and could run through until 2 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 28 Mar 2024 at 13:55.
1 Apr and 1 May 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Westfields Road, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 6 Mar 2024 at 15:59.
1 Apr and 30 May 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Greenford Road, Greenford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 30 May 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 13 Mar 2024 at 11:08.
1 and 5 Apr 2024
Thames Water are proposing to carry out New service connection on St Johns Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 5 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Feb 2024 at 13:44.
Wednesday
Affinity Water are proposing to carry out Utility repair and maintenance works on Pinner Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 19 Mar 2024 at 09:27.
Wednesday
London Borough Of Barnet are proposing to carry out Highway improvement works on Grahame Park Way, Grahame Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 3 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 30 Nov 2023 at 10:04.
1 and 4 Apr 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Wemborough Road, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 28 Mar 2024 at 14:41.
2 Apr and 3 May 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on The Avenue, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Ealing on 27 Mar 2024 at 10:19.
2 Apr and 29 May 2024
HS2 are proposing to carry out Utility asset works on Ruskin Gardens, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 29 May 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 8 Mar 2024 at 13:48.
2 Apr and 29 May 2024
HS2 are proposing to carry out Utility asset works on Brentham Way, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 29 May 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 8 Mar 2024 at 13:47.
2 Apr and 29 May 2024
HS2 are proposing to carry out Utility asset works on Brunswick Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 8 Mar 2024 at 13:47.
2 and 10 Apr 2024
Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 10 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Feb 2024 at 11:30.
2 and 8 Apr 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Midholm, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 8 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Feb 2024 at 10:11.
2 and 7 Apr 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Woodlands Avenue, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 7 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Feb 2024 at 09:41.
2 and 4 Apr 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hallowes Crescent, Hayling, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Feb 2024 at 12:10.
2 and 4 Apr 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Hallowes Crescent, Hayling, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 April 2024 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 13 Dec 2023 at 13:26.
4 Apr and 4 May 2024
G2 Energy IDNO are proposing to carry out Utility asset works on Noel Road, Acton.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2024 and could run through until 4 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 7 Mar 2024 at 14:02.
4 and 30 Apr 2024
Cadent Gas are proposing to carry out Utility asset works on Craven Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 22:26.
4 and 9 Apr 2024
London Borough Of Harrow were proposing to carry out Highway repair and maintenance works on Wemborough Road, Stanmore.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 April 2024 and run through until 9 April 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 28 Mar 2024 at 14:16.
5 and 6 Apr 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Slip Road Between Western Avenue And Coronation Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 April 2024 and could run through until 6 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 27 Mar 2024 at 10:08.
7 Apr and 2 May 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Crownhill Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 2 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 25 Mar 2024 at 14:47.
7 and 14 Apr 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Goldsmith Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 19 Mar 2024 at 15:31.
7 and 9 Apr 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Brockley Hill, Stanmore.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2024 and could run through until 9 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 11:25.
8 and 12 Apr 2024
London Borough Of Ealing are proposing to carry out Permanent reinstatement on Park Place, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 9 Feb 2024 at 13:59.
8 Apr and 3 May 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Ealing Road, Wembley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Mar 2024 at 21:01.
8 Apr and 10 May 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Mount Pleasant, Wembley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Mar 2024 at 21:02.
8 and 12 Apr 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Butler Avenue, West Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 Mar 2024 at 09:52.
8 and 19 Apr 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 19 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 09:05.
8 and 10 Apr 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on George Gange Way, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2024 and could run through until 10 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 20 Mar 2024 at 09:28.
9 and 11 Apr 2024
BT are proposing to carry out Utility asset works on Western Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by BT on 5 Jan 2024 at 14:38.
9 and 12 Apr 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Hinkler Road, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 5 Mar 2024 at 09:13.
9 and 11 Apr 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Edgwarebury Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 11:18.
11 and 15 Apr 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Pinner Road, North Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 April 2024 and could run through until 15 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 29 Jan 2024 at 14:31.
12 and 14 Apr 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Market Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2024 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Mar 2024 at 11:59.
12 and 14 Apr 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Watling Avenue, Burnt Oak, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2024 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Mar 2024 at 11:41.
12 and 14 Apr 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Back Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 April 2024 and could run through until 14 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 21 Mar 2024 at 11:51.
14 Apr and 25 May 2024
Thames Water are proposing to carry out Utility asset works on Woodfield Crescent, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 25 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:27.
14 Apr and 11 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Woodfield Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 11 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Mar 2024 at 11:24.
14 and 29 Apr 2024
London Borough Of Ealing are proposing to carry out Utility asset works on Bideford Avenue, Perivale.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 12 Mar 2024 at 12:17.
14 Apr and 9 May 2024
Cadent Gas are proposing to carry out Utility asset works on Craven Park, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 9 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 11 Mar 2024 at 12:18.
14 Apr and 20 May 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on The Hyde, Colindale, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 19 Mar 2024 at 11:59.
14 Apr and 12 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Harrow View, Harrow.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 12 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jan 2024 at 16:30.
14 Apr and 9 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Cuckoo Hill, Eastcote.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Mar 2024 at 08:33.
14 and 16 Apr 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2024 and could run through until 16 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 26 Mar 2024 at 14:14.
15 Apr and 7 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Uxbridge Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 16:26.
15 Apr and 7 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Uxbridge Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 16:21.
15 Apr and 7 Jun 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Wharncliffe Drive, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Mar 2024 at 16:24.
15 and 17 Apr 2024
London Borough Of Harrow are proposing to carry out Highway repair and maintenance works on Vaughan Road, West Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 17 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Harrow on 14 Mar 2024 at 09:53.
16 and 19 Apr 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Tenby Gardens, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 19 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 9 Feb 2024 at 15:04.
16 and 22 Apr 2024
BT are proposing to carry out Utility asset works on St Gregory Close, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 22 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 29 Feb 2024 at 10:11.
16 and 22 Apr 2024
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Mayfield Avenue, Kenton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2024 and could run through until 22 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Jan 2024 at 09:52.
17 and 24 Apr 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Athelstone Road, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 April 2024 and could run through until 24 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Jan 2024 at 15:17.
18 and 20 Apr 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Bury Street, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 27 Feb 2024 at 14:49.
18 and 20 Apr 2024
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Bunns Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2024 and could run through until 20 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 11 Mar 2024 at 09:19.
18 and 22 Apr 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Newlands Close, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 11:18.
19 and 22 Apr 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Aragon Drive, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 April 2024 and could run through until 22 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 9 Feb 2024 at 07:40.
20 and 22 Apr 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Cornwall Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 April 2024 and could run through until 22 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
20 Apr and 18 Jun 2024
Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 April 2024 and could run through until 18 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Feb 2024 at 13:25.
21 and 25 Apr 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Rectory Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 25 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 26 Feb 2024 at 15:32.
22 Apr and 13 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Chase Road, Park Royal.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Mar 2024 at 14:47.
22 Apr and 13 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Acton Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 13 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Jan 2024 at 10:50.
24 and 29 Apr 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Marsh Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2024 and could run through until 29 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 11:18.
27 and 29 Apr 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Somerset Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2024 and could run through until 29 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
27 Apr and 19 May 2024
BT are proposing to carry out Utility asset works on Pinner Hill Road, Pinner.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Mar 2024 at 15:01.
28 and 30 Apr 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Buckingham Avenue, Perivale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 17 Jan 2024 at 13:20.
28 Apr and 1 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on College Hill Road, Harrow Weald.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 1 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 15 Jan 2024 at 10:02.
29 Apr and 12 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Hamilton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 09:04.
29 Apr and 18 Aug 2024
Murphy Power Distribution are proposing to carry out Utility asset works on South Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 18 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 27 Mar 2024 at 12:05.
29 Apr and 22 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on The Parkway, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 22 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 20 Dec 2023 at 15:43.
29 Apr and 3 May 2024
Thames Water are proposing to carry out New service connection on Perryfield Way, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Feb 2024 at 10:49.
1 and 6 May 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on Turnberry Court, South Oxhey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 May 2024 and could run through until 6 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 28 Mar 2024 at 13:59.
4 and 6 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Denbigh Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2024 and could run through until 6 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
4 and 7 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Boleyn Drive, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2024 and could run through until 7 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Feb 2024 at 09:36.
4 and 8 May 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Station Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 11:18.
5 May and 1 Nov 2024
HS2 are proposing to carry out Section 50 on Western Avenue, Perivale.
These works are categorised as Major.
The works will start on or after 5 May 2024 and could run through until 1 November 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 7 Mar 2024 at 17:51.
6 and 19 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Cambridge Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 09:15.
6 and 31 May 2024
HS2 are proposing to carry out Section 50 on Western Avenue, Perivale.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 21 Mar 2024 at 00:48.
6 May and 26 Jul 2024
Thames Water are proposing to carry out Utility asset works on Greenford Road, Greenford.
These works are categorised as Major.
The works will start on or after 6 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Mar 2024 at 14:34.
6 and 11 May 2024
London Borough Of Barnet are proposing to carry out Highway improvement works on Deansbrook Road, Burnt Oak Broadway To Deans Lane, Edgware.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 11 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 13 Nov 2023 at 11:18.
7 and 10 May 2024
Virgin Media are proposing to carry out Utility asset works on Boston Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 14 Feb 2024 at 15:31.
7 and 10 May 2024
Virgin Media are proposing to carry out Utility asset works on Maunder Road, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 14 Feb 2024 at 15:31.
7 and 26 May 2024
Affinity Water are proposing to carry out Utility asset works on Avenue Road, Southall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 26 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 22 Mar 2024 at 10:50.
7 May and 1 Dec 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Church Road, Northolt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 1 December 2024. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by London Borough Of Ealing on 28 Mar 2024 at 09:25.
7 May and 1 Dec 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Mandeville Road, Northolt.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 1 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Ealing on 28 Mar 2024 at 09:27.
8 and 12 May 2024
London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 29 Feb 2024 at 12:32.
8 and 10 May 2024
Affinity Water are proposing to carry out Remedial works on The Drive, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 May 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 6 Feb 2024 at 10:04.
9 May and 26 Jul 2024
Thames Water are proposing to carry out Disconnection or alteration of supply on Audley Road, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 May 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Jun 2021 at 08:37.
11 and 13 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Chepstow Gardens, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
12 May and 3 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Catlins Lane, Eastcote.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 3 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Mar 2024 at 13:28.
12 and 19 May 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Longcrofte Road, Canons Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 25 Mar 2024 at 10:23.
13 and 31 May 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Derwent Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Feb 2024 at 15:17.
13 and 16 May 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Selborne Gardens, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Jan 2024 at 12:19.
17 and 19 May 2024
Thames Water are proposing to carry out roadworks on Fiveways Corner, Hendon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 May 2024 and could run through until 19 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Feb 2024 at 09:55.
19 May and 7 Jul 2024
Thames Water are proposing to carry out Utility asset works on Woodfield Road, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:27.
19 and 21 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Llanover Road, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 21 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 18 Mar 2024 at 07:53.
19 and 24 May 2024
London Borough Of Harrow are proposing to carry out Highway improvement works on Wildcroft Gardens, Canons Park.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 24 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Harrow on 25 Mar 2024 at 10:23.
19 and 21 May 2024
Hertfordshire County Council are proposing to carry out Highway repair and maintenance works on High Street, Bushey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Hertfordshire County Council on 20 Mar 2024 at 13:52.
20 May and 17 Jun 2024
Affinity Water are proposing to carry out Utility asset works on Hamilton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 17 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 22 Mar 2024 at 10:34.
20 and 23 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Rookery Way, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 23 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 21 Feb 2024 at 10:54.
20 and 30 May 2024
Transport for London (TfL) are proposing to carry out Works for Rail Purposes on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 1 Feb 2024 at 14:27.
24 and 26 May 2024
BT are proposing to carry out Utility asset works on Cuckoo Avenue, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2024 and could run through until 26 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 27 Mar 2024 at 14:56.
24 and 26 May 2024
BT are proposing to carry out Utility asset works on Cuckoo Avenue, Hanwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 May 2024 and could run through until 26 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 28 Mar 2024 at 11:58.
25 and 27 May 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Carlyle Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 May 2024 and could run through until 27 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
26 and 28 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Victoria Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2024 and could run through until 28 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 26 Feb 2024 at 16:44.
27 and 29 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on College Road, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Mar 2024 at 10:52.
27 May and 3 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Greenhill Way, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Affinity Water on 18 Mar 2024 at 10:51.
28 and 30 May 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Courtfield Crescent, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 22 Mar 2024 at 11:22.
29 May and 14 Jun 2024
ESP Electricity are proposing to carry out Utility asset works on St Leonards Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2024 and could run through until 14 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 20 Nov 2023 at 14:43.
30 May and 20 Jun 2024
HS2 are proposing to carry out Utility asset works on Lynwood Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 May 2024 and could run through until 20 June 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 8 Mar 2024 at 13:47.
1 and 3 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Ascot Gardens, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
1 and 3 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Field End Road, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 June 2024 and could run through until 3 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 16:37.
2 and 6 Jun 2024
BT are proposing to carry out Utility repair and maintenance works on Swakeleys Road, Ickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 20 Mar 2024 at 10:22.
2 and 5 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Rushout Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 20 Mar 2024 at 07:01.
2 and 8 Jun 2024
Cadent Gas are proposing to carry out New service connection on Graham Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 8 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 10:37.
3 and 21 Jun 2024
HS2 are proposing to carry out Section 50 on Western Avenue, Ealing.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 21 June 2024. The works will impact the footway, carriageway, cycleway and parking place.
This roadwork event was last updated by HS2 on 21 Mar 2024 at 01:04.
4 Jun 2024 and 31 Mar 2026
London Borough Of Barnet are proposing to carry out Highway improvement works on Colindale Avenue, Colindale, London.
These works are categorised as Major.
The works will start on or after 4 June 2024 and could run through until 31 March 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 8 Feb 2024 at 08:15.
8 and 10 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on North Avenue, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
8 and 10 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Parkfield Crescent, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Murphy Power Distribution on 26 Mar 2024 at 16:42.
9 and 27 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Northolt Lane, Greenford.
These works are categorised as Major.
The works will start on or after 9 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Mar 2024 at 10:30.
10 and 14 Jun 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Access Road To Barratt Industrial Park, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 14 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Mar 2024 at 10:25.
10 Jun and 8 Jul 2024
Thames Water are proposing to carry out Utility asset works on Pitshanger Lane, Ealing.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 8 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Mar 2024 at 11:27.
11 and 24 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Brook Avenue, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 13 Mar 2024 at 23:07.
14 Jun and 3 Jul 2024
ESP Electricity are proposing to carry out Utility asset works on Chandos Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 5 Oct 2023 at 10:23.
16 and 20 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Brookside Road, Hayes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Mar 2024 at 11:34.
16 and 20 Jun 2024
BT are proposing to carry out Utility asset works on Princess Lane, Ruislip.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 25 Mar 2024 at 15:06.
16 Jun and 7 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on High Elms Close, Northwood.
These works are categorised as Major.
The works will start on or after 16 June 2024 and could run through until 7 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Mar 2024 at 16:30.
17 and 20 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Sussex Crescent, Northolt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 19 Mar 2024 at 08:20.
17 Jun and 13 Jul 2024
London Borough Of Barnet are proposing to carry out Highway repair and maintenance works on Aerodrome Road, Colindale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2024 and could run through until 13 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by London Borough Of Barnet on 15 Mar 2024 at 09:27.
22 and 24 Jun 2024
Murphy Power Distribution are proposing to carry out Utility asset works on Shackleton Road, Southall.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 June 2024 and could run through until 24 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Mar 2024 at 11:41.
24 and 27 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Sedgecombe Avenue, Harrow.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 27 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 27 Mar 2024 at 18:44.
24 and 27 Jun 2024
Network Rail are proposing to carry out Works for Rail Purposes on Bunns Lane, Mill Hill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 Mar 2024 at 09:41.
25 and 27 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Wentworth Hill, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2024 and could run through until 27 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Affinity Water on 25 Mar 2024 at 11:04.
25 and 27 Jun 2024
Affinity Water are proposing to carry out Utility repair and maintenance works on Grant Road, Wealdstone.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2024 and could run through until 27 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Affinity Water on 21 Mar 2024 at 11:06.
Roadworks Map near to Kingsfield Road, HARROW, HA1 3DE
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
Roadworks Listing near to Kingsfield Road, HARROW, HA1 3DE (23 Events)
(Scheduled Dates)
(miles)
(Scheduled: 27 Mar 2024 - 3 Apr 2024)
(Scheduled: 27 Mar 2024 - 3 Apr 2024)
(Scheduled: 28 Mar 2024 - 4 Apr 2024)
(Scheduled: 28 Mar 2024 - 2 Apr 2024)
(Scheduled: 26 Mar 2024 - 28 Mar 2024)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data