ROADWORKS SUMMARY
Acer Drive, WOKING, GU24 9XH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Acer Drive, GU24 9XH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Acer Drive, WOKING, GU24 9XH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Acer Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Goldsworth Road

Surrey County Council are proposing to carry out Highway improvement works on Goldsworth Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:01.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Heathside Crescent

Surrey County Council are proposing to carry out Highway improvement works on Heathside Crescent, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Apr 2021 at 10:58.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Victoria Road

Surrey County Council are proposing to carry out Highway improvement works on Victoria Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:47.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Heathside Road

Surrey County Council are proposing to carry out Highway improvement works on Heathside Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:03.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Bradfield Close

Surrey County Council are proposing to carry out Highway improvement works on Bradfield Close, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 9 Feb 2021 at 12:42.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Station Approach

Surrey County Council are proposing to carry out Highway improvement works on Station Approach, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:44.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
York Road

Surrey County Council are proposing to carry out Highway improvement works on York Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:50.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Hill View Road

Surrey County Council are proposing to carry out Highway improvement works on Hill View Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:05.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Mount Hermon Road

Surrey County Council are proposing to carry out Highway improvement works on Mount Hermon Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:04.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Constitution Hill

Surrey County Council are proposing to carry out Highway improvement works on Constitution Hill, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 08:59.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Guildford Road

Surrey County Council are proposing to carry out Highway improvement works on Guildford Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:32.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Church Street West

Surrey County Council are proposing to carry out Highway improvement works on Church Street West, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 08:57.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Forge End

Surrey County Council are proposing to carry out Highway improvement works on Forge End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Mar 2021 at 09:00.

Surrey County Council logo

LONG TERM
Between
1 Jun 2021 and 1 Jun 2025
Details
View Map
Share
Victoria Way

Surrey County Council are proposing to carry out Highway improvement works on Victoria Way, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2021 and could run through until 1 June 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 10 Feb 2021 at 11:49.

Network Rail logo

LONG TERM
Between
1 Nov 2022 and 31 May 2025
Details
View Map
Share
Victoria Way

Network Rail are proposing to carry out Works for Rail Purposes on Victoria Way, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2022 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Network Rail on 9 Jun 2021 at 07:50.

Surrey County Council logo

LONG TERM
Between
1 Mar 2023 and 30 Nov 2024
Details
View Map
Share
Oriental Road

Surrey County Council are proposing to carry out Section 50 on Oriental Road, Woking.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2023 and could run through until 30 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 27 Apr 2021 at 11:14.

Surrey County Council logo

LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Deepcut Bridge Road

Surrey County Council are carrying out Highway repair and maintenance works on Deepcut Bridge Road, Deepcut, Camberley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2023 at 07:00 and could run through until 4 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 21 Aug 2023 at 13:29.

Surrey County Council logo

LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Deepcut Bridge Road

Surrey County Council are carrying out Highway improvement works on Deepcut Bridge Road, Deepcut, Camberley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2023 at 08:30 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 22 Mar 2024 at 09:32.

Surrey County Council logo

LONG TERM
Until
4 Mar 2025
Details
View Map
Share
Mindenhurst Road

Surrey County Council are carrying out Highway improvement works on Mindenhurst Road, Deepcut, Camberley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 September 2023 at 07:00 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Sep 2023 at 11:30.

Surrey County Council logo

LONG TERM
Finishing
Sunday
Details
View Map
Share
Benner Lane

Surrey County Council are proposing to carry out Highway improvement works on Benner Lane, West End, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 October 2023 and could run through until 31 March 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 7 Jun 2023 at 12:06.

Surrey County Council logo

LONG TERM
Between
1 Jan and 30 Jun 2024
Details
View Map
Share
Howards Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Howards Road, Kingfield, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 18 Aug 2023 at 09:27.

Surrey County Council logo

LONG TERM
Between
1 Jan and 30 Jun 2024
Details
View Map
Share
The Maultway

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Maultway, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2024 and could run through until 30 June 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 Sep 2023 at 11:21.

Surrey County Council logo

LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Deepcut Bridge Road

Surrey County Council are carrying out Works for road purposes on Deepcut Bridge Road, Deepcut, Camberley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 January 2024 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 08:55.

Cadent Gas logo

LONG TERM
Finishing
Monday
Details
View Map
Share
Longcross Road

Cadent Gas are carrying out Utility asset works on Longcross Road, Chertsey.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 17:30 and could run through until 1 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 13:28.

Surrey County Council logo

LONG TERM
Finishing
Sunday
Details
View Map
Share
Portsmouth Road

Surrey County Council are proposing to carry out Highway improvement works on Portsmouth Road, Frimley, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2024 and could run through until 31 March 2024. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 19 Sep 2023 at 15:01.

Surrey County Council logo

LONG TERM
Finishing
Sunday
Details
View Map
Share
Portsmouth Road

Surrey County Council are proposing to carry out Highway improvement works on Portsmouth Road, Frimley, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2024 and could run through until 31 March 2024. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 11 Dec 2023 at 10:28.

Scottish Hydro Electric Power Dis logo

LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Blackwater Valley Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Blackwater Valley Road, Farnborough.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2024 at 14:11 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Mar 2024 at 15:38.

Southern Gas Networks logo

LONG TERM
Until
22 May 2024
Details
View Map
Share
Church Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Church Road, Frimley, Camberley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 11:40 and could run through until 22 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Feb 2024 at 11:57.

Cadent Gas logo

LONG TERM
Until
7 May 2024
Details
View Map
Share
Sunninghill Road

Cadent Gas are carrying out Utility asset works on Sunninghill Road, Windlesham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 February 2024 at 08:30 and could run through until 7 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Feb 2024 at 12:55.

Affinity Water logo

LONG TERM
Until
31 May 2024
Details
View Map
Share
Longcross Road

Affinity Water are carrying out Utility asset works on Longcross Road, Chertsey.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 February 2024 at 10:14 and could run through until 31 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 14 Feb 2024 at 10:14.

Cadent Gas logo

LONG TERM
Until
6 Jun 2024
Details
View Map
Share
Sunning Avenue

Cadent Gas are carrying out Utility asset works on Sunning Avenue, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 February 2024 at 09:27 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2024 at 09:30.

Surrey County Council logo

LONG TERM
Finishing
Wednesday
Details
View Map
Share
Station Road

Surrey County Council are carrying out Highway repair and maintenance works on Station Road, Chobham, Woking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 February 2024 at 06:45 and could run through until 3 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Mar 2024 at 13:48.

Surrey County Council logo

LONG TERM
Until
7 Apr 2024
Details
View Map
Share
Old Chertsey Road

Surrey County Council are carrying out Highway repair and maintenance works on Old Chertsey Road, Chobham, Woking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 12:45 and could run through until 7 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Mar 2024 at 07:29.

Surrey County Council logo

LONG TERM
Until
19 Apr 2024
Details
View Map
Share
Hermitage Road

Surrey County Council are carrying out Highway repair and maintenance works on Hermitage Road, St Johns, Woking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 08:00 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 11 Mar 2024 at 08:18.

Surrey County Council logo

LONG TERM
Until
19 Apr 2024
Details
View Map
Share
Gorsewood Road

Surrey County Council are carrying out Highway repair and maintenance works on Gorsewood Road, St Johns, Woking.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 08:00 and could run through until 19 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 11 Mar 2024 at 08:19.

Southern Gas Networks logo

LONG TERM
Until
18 Jul 2024
Details
View Map
Share
The Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on The Avenue, Camberley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 12:30 and could run through until 18 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2024 at 12:36.

Southern Gas Networks logo

Until
4 Apr 2024
Details
View Map
Share
Robin Hood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Robin Hood Road, Knaphill, Woking.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 March 2024 at 11:42 and could run through until 4 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2024 at 10:04.

Cadent Gas logo

LONG TERM
Between
18 Mar and 21 Apr 2024
Details
View Map
Share
Chertsey Road

Cadent Gas are proposing to carry out Utility asset works on Chertsey Road, Windlesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 21 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Dec 2023 at 13:22.

Surrey County Council logo

Between
18 Mar and 7 Apr 2024
Details
View Map
Share
Church Lane

Surrey County Council carried out Highway repair and maintenance works on Church Lane, Pirbright.

The road was closed for some or all of the period.

The works were originally planned between 18 Mar 2024 and 7 Apr 2024 and were actually completed between 18 Mar 2024 (08:19) and 28 Mar 2024 (14:30). The works impacted the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Mar 2024 at 14:59.

Cadent Gas logo

Finishing
Wednesday
Details
View Map
Share
Coronation Road

Cadent Gas are carrying out Utility asset works on Coronation Road, Ascot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 March 2024 at 10:30 and could run through until 3 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Mar 2024 at 10:54.

Southern Gas Networks logo

Finishing
Tuesday
Details
View Map
Share
St Johns Hill Road

Southern Gas Networks are carrying out Utility repair and maintenance works on St Johns Hill Road, St Johns, Woking.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 March 2024 at 11:15 and could run through until 2 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 Mar 2024 at 09:04.

Thames Water logo

Until
8 Apr 2024
Details
View Map
Share
Grove Cross Road

Thames Water are carrying out Utility repair and maintenance works on Grove Cross Road, Frimley, Camberley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 14:00 and could run through until 8 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Mar 2024 at 10:28.

Surrey County Council logo

Finishing
Monday
Details
View Map
Share
Church Hill

Surrey County Council are carrying out Highway repair and maintenance works on Church Hill, Horsell, Woking.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 March 2024 at 18:15 and could run through until 1 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Mar 2024 at 13:00.

Southern Gas Networks logo

Until
7 Apr 2024
Details
View Map
Share
Robin Hood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Robin Hood Road, Knaphill, Woking.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 March 2024 at 15:08 and could run through until 7 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Mar 2024 at 11:53.

Affinity Water logo

Finishing
Tuesday
Details
View Map
Share
Duke Street

Affinity Water are carrying out Utility repair and maintenance works on Duke Street, Woking.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 09:57 and could run through until 2 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Affinity Water on 28 Mar 2024 at 09:57.

Surrey County Council logo

LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Victoria Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Victoria Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Nov 2023 at 17:41.

Surrey County Council logo

LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Maybury Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Maybury Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 3 Nov 2023 at 09:44.

Cadent Gas logo

LONG TERM
Between
31 Mar and 2 May 2024
Details
View Map
Share
Martyrs Lane

Cadent Gas are proposing to carry out Utility repair and maintenance works on Martyrs Lane, Woodham, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 2 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 2 Jan 2024 at 11:55.

Surrey County Council logo

LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Frimley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frimley Road, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Oct 2023 at 12:13.

Surrey County Council logo

LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
London Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Oct 2023 at 12:27.

Surrey County Council logo

LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Howards Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Howards Road, Kingfield, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Nov 2023 at 17:54.

Surrey County Council logo

LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Frimley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frimley Road, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Nov 2023 at 13:44.

Surrey County Council logo

LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Guildford Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Guildford Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 6 Nov 2023 at 16:04.

Surrey County Council logo

LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
St Johns Hill Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on St Johns Hill Road, St Johns, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Nov 2023 at 09:27.

Surrey County Council logo

LONG TERM
Between
31 Mar and 30 Sep 2024
Details
View Map
Share
Frimley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Frimley Road, Frimley, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Nov 2023 at 13:45.

Southern Gas Networks logo

LONG TERM
Between
1 Apr and 21 May 2024
Details
View Map
Share
Rectory Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rectory Road, Farnborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 21 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2024 at 09:04.

Cadent Gas logo

LONG TERM
Between
1 Apr and 6 Jun 2024
Details
View Map
Share
Silwood Road

Cadent Gas are proposing to carry out Utility asset works on Silwood Road, Sunninghill, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 09:59.

Southern Gas Networks logo

LONG TERM
Between
1 Apr and 12 Jun 2024
Details
View Map
Share
Guildford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Guildford Road, Bisley, Woking.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 12 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Mar 2024 at 09:37.

Surrey County Council logo

Between
2 and 12 Apr 2024
Details
View Map
Share
Kennel Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kennel Lane, Windlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Mar 2024 at 07:25.

Surrey County Council logo

Between
2 and 11 Apr 2024
Details
View Map
Share
Pound Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Pound Lane, Windlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 11 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Mar 2024 at 07:27.

Surrey County Council logo

Between
2 and 12 Apr 2024
Details
View Map
Share
Updown Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Updown Hill, Windlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Mar 2024 at 07:29.

Surrey County Council logo

Between
2 and 12 Apr 2024
Details
View Map
Share
School Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on School Road, Windlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2024 and could run through until 12 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 15 Mar 2024 at 07:28.

Toob logo

Between
8 and 12 Apr 2024
Details
View Map
Share
Heathside Crescent

Toob are proposing to carry out Utility asset works on Heathside Crescent, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 12 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Toob on 8 Feb 2024 at 08:46.

Southern Gas Networks logo

LONG TERM
Between
8 Apr and 28 Jun 2024
Details
View Map
Share
Coleford Bridge Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Coleford Bridge Road, Mytchett, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Jan 2024 at 13:11.

Surrey County Council logo

Between
12 and 14 Apr 2024
Details
View Map
Share
Walton Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Walton Road, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 April 2024 and could run through until 14 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 27 Mar 2024 at 16:11.

Surrey County Council logo

Between
21 and 23 Apr 2024
Details
View Map
Share
Kettlewell Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kettlewell Hill, Horsell, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 23 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Mar 2024 at 17:41.

Cadent Gas logo

Between
21 Apr and 16 May 2024
Details
View Map
Share
Freemantle Road Footpath

Cadent Gas are proposing to carry out Utility asset works on Freemantle Road Footpath, Bagshot.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 21 April 2024 and could run through until 16 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Mar 2024 at 09:24.

UK Power Networks South Eastern logo

Between
22 Apr and 10 May 2024
Details
View Map
Share
Dartmouth Avenue

UK Power Networks South Eastern are proposing to carry out New service connection on Dartmouth Avenue, Sheerwater, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 10 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Mar 2024 at 10:59.

Cadent Gas logo

LONG TERM
Between
22 Apr and 26 Jul 2024
Details
View Map
Share
Bagshot Road

Cadent Gas are proposing to carry out Utility asset works on Bagshot Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Jan 2024 at 11:26.

Surrey County Council logo

Between
23 and 25 Apr 2024
Details
View Map
Share
Wimbledon Road

Surrey County Council are proposing to carry out Highway improvement works on Wimbledon Road, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Mar 2024 at 14:00.

Surrey County Council logo

LONG TERM
Between
30 Apr and 1 Nov 2024
Details
View Map
Share
Longcross Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Longcross Road, Chertsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 1 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Dec 2023 at 14:02.

Surrey County Council logo

LONG TERM
Between
6 May and 30 Aug 2024
Details
View Map
Share
Lockfield Drive

Surrey County Council are proposing to carry out Highway repair and maintenance works on Lockfield Drive, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Feb 2024 at 13:47.

Southern Gas Networks logo

Between
12 and 20 May 2024
Details
View Map
Share
Ravenswood Drive

Southern Gas Networks are proposing to carry out New service connection on Ravenswood Drive, Camberley.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2024 at 16:30.

Southern Gas Networks logo

Between
12 and 21 May 2024
Details
View Map
Share
Ravenswood Drive

Southern Gas Networks are proposing to carry out New service connection on Ravenswood Drive, Camberley.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2024 at 14:10.

Surrey County Council logo

Between
17 and 21 May 2024
Details
View Map
Share
The Maultway

Surrey County Council are proposing to carry out Highway repair and maintenance works on The Maultway, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 28 Mar 2024 at 08:54.

Southern Gas Networks logo

LONG TERM
Between
19 May and 6 Oct 2024
Details
View Map
Share
Portsmouth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Portsmouth Road, Frimley, Camberley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 6 October 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Feb 2024 at 08:04.

Surrey County Council logo

LONG TERM
Between
20 May and 29 Jun 2024
Details
View Map
Share
London Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Camberley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 13 Mar 2024 at 14:19.

Surrey County Council logo

LONG TERM
Between
20 May and 29 Jun 2024
Details
View Map
Share
Grand Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on Grand Avenue, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 29 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 4 Mar 2024 at 13:47.

Surrey County Council logo

Between
22 and 30 May 2024
Details
View Map
Share
Portsmouth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Portsmouth Road, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 4 Mar 2024 at 08:07.

Surrey County Council logo

LONG TERM
Between
26 May and 29 Aug 2024
Details
View Map
Share
Portsmouth Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Portsmouth Road, Frimley, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 29 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 22 Mar 2024 at 09:20.

Southern Gas Networks logo

LONG TERM
Between
26 May and 11 Aug 2024
Details
View Map
Share
Brackendale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brackendale Road, Camberley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 11 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Mar 2024 at 14:30.

Surrey County Council logo

LONG TERM
Between
27 May and 30 Aug 2024
Details
View Map
Share
Chobham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chobham Road, Frimley, Camberley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 5 Mar 2024 at 07:20.

Surrey County Council logo

Between
28 May and 12 Jun 2024
Details
View Map
Share
Rosehill Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on Rosehill Avenue, Horsell, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Mar 2024 at 12:50.

BT logo

Between
28 and 30 May 2024
Details
View Map
Share
Wych Hill

BT are proposing to carry out Utility repair and maintenance works on Wych Hill, Surrey, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Feb 2024 at 10:27.

Surrey County Council logo

Between
29 May and 12 Jun 2024
Details
View Map
Share
Grobars Avenue

Surrey County Council are proposing to carry out Highway repair and maintenance works on Grobars Avenue, Horsell, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Mar 2024 at 12:30.

Southern Gas Networks logo

LONG TERM
Between
2 Jun and 11 Sep 2024
Details
View Map
Share
Ivy Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ivy Lane, Woking.

These works are categorised as Major.

The works will start on or after 2 June 2024 and could run through until 11 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Mar 2024 at 13:50.

Affinity Water logo

Between
2 and 6 Jun 2024
Details
View Map
Share
Berry Lane

Affinity Water are proposing to carry out Utility repair and maintenance works on Berry Lane, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the verge only.

This roadwork event was last updated by Affinity Water on 26 Mar 2024 at 08:36.

UK Power Networks South Eastern logo

Between
3 and 26 Jun 2024
Details
View Map
Share
Longcross Road

UK Power Networks South Eastern are proposing to carry out New service connection on Longcross Road, Chertsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 26 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Jan 2024 at 11:59.

Southern Gas Networks logo

LONG TERM
Between
3 Jun and 4 Aug 2024
Details
View Map
Share
Hockering Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hockering Gardens, Woking.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 3 June 2024 and could run through until 4 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2024 at 08:00.

Surrey County Council logo

Between
3 and 20 Jun 2024
Details
View Map
Share
Chobham Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Chobham Lane, Longcross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 08:27.

Surrey County Council logo

Between
3 and 20 Jun 2024
Details
View Map
Share
Kitsmead Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Kitsmead Lane, Longcross.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 08:27.

Surrey County Council logo

Between
3 and 20 Jun 2024
Details
View Map
Share
Trumps Green Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Trumps Green Road, Virginia Water.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 20 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 21 Feb 2024 at 08:28.

UK Power Networks South Eastern logo

Between
3 and 7 Jun 2024
Details
View Map
Share
Hook Hill Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Hook Hill Lane, Mayford, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Mar 2024 at 09:08.

Southern Gas Networks logo

LONG TERM
Between
16 Jun and 22 Sep 2024
Details
View Map
Share
The Ridge

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Ridge, Woking.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 16 June 2024 and could run through until 22 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Mar 2024 at 15:24.

BT logo

Between
17 and 20 Jun 2024
Details
View Map
Share
Wych Hill

BT are proposing to carry out Utility repair and maintenance works on Wych Hill, Surrey, Woking.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 20 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Mar 2024 at 16:42.

Cadent Gas logo

LONG TERM
Between
23 Jun and 1 Aug 2024
Details
View Map
Share
Devenish Road

Cadent Gas are proposing to carry out Utility asset works on Devenish Road, Sunningdale, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 1 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Mar 2024 at 09:59.


Roadworks Map near to Acer Drive, WOKING, GU24 9XH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 28 Mar 2024 15:06
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.

Roadworks Listing near to Acer Drive, WOKING, GU24 9XH (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Surrey County Council logo
MAJOR
  
BENNER LANE (0.6 miles), WEST END
Surrey County Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 22 Oct 2023 - 31 Mar 2024
0.6
Share
2
Surrey County Council logo
LUCAS GREEN ROAD (0.8 miles), WEST END
Surrey County Council
Highway repair and maintenance works - Carriageway - Stop/go boards
Complete
18 Mar 2024 08:00 - 28 Mar 2024 14:15
0.8
Share
3
Southern Gas Networks logo
MAJOR
  
ARETHUSA WAY (0.9 miles), BISLEY
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 26 Mar 2024 11:30
(Scheduled: 25 Mar 2024 - 30 Apr 2024)
0.9
Share

Contains public sector information licensed under the Open Government Licence v3.0.