ROADWORKS SUMMARY
DH3 3DQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for DH3 3DQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to DH3 3DQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
26 Jul 2024
Details
View Map
Share
Follow
Durham Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Durham Road, Birtley Central, Birtley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 08:00 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Mar 2024 at 07:58.

Gateshead Metropolitan Borough Council logo
LONG TERM
Until
26 Jul 2024
Details
View Map
Share
Follow
Durham Road

Gateshead Metropolitan Borough Council are carrying out Highway repair and maintenance works on Durham Road, Birtley Central, Birtley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 31 July 2023 at 08:00 and could run through until 26 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 25 Mar 2024 at 07:57.

Northumbrian Water logo
LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Galloping Green Road

Northumbrian Water are carrying out Utility repair and maintenance works on Galloping Green Road, Eighton Banks, Gateshead.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 November 2023 at 11:24 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 20 Feb 2024 at 12:23.

Northern Gas Networks logo
LONG TERM
Until
30 Apr 2024
Details
View Map
Share
Follow
Milbanke Close

Northern Gas Networks are carrying out Utility repair and maintenance works on Milbanke Close, Ouston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 January 2024 at 15:00 and could run through until 30 April 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 28 Mar 2024 at 09:16.

Durham County Council logo
LONG TERM
Between
15 Jan and 4 Nov 2024
Details
View Map
Share
Follow
Newcastle Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Newcastle Road, Crossgate Moor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 4 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 21 Nov 2023 at 13:22.

Durham County Council logo
LONG TERM
Between
15 Jan and 4 Nov 2024
Details
View Map
Share
Follow
C100 (Between Sniperley Roundabout And Blackie Boy Roundabout)

Durham County Council are proposing to carry out Highway repair and maintenance works on C100 (Between Sniperley Roundabout And Blackie Boy Roundabout), Framwellgate Moor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 4 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 21 Nov 2023 at 13:22.

Durham County Council logo
LONG TERM
Between
15 Jan and 4 Nov 2024
Details
View Map
Share
Follow
Dryburn Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Dryburn Road, Framwellgate Moor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 4 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 21 Nov 2023 at 11:20.

Durham County Council logo
LONG TERM
Between
15 Jan and 4 Nov 2024
Details
View Map
Share
Follow
Road Leading To County Hall (North)

Durham County Council are proposing to carry out Highway repair and maintenance works on Road Leading To County Hall (North), Aykley Heads.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 4 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 21 Nov 2023 at 13:22.

Durham County Council logo
LONG TERM
Between
15 Jan and 4 Nov 2024
Details
View Map
Share
Follow
Aykley Heads Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Aykley Heads Road, Aykley Heads.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2024 and could run through until 4 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 21 Nov 2023 at 13:22.

National Highways logo
LONG TERM
Between
16 Jan and 22 Jul 2024
Details
View Map
Share
Follow
Sunderland Highway

National Highways are proposing to carry out Highway improvement works on Sunderland Highway, Albany, Washington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by National Highways on 16 Jan 2024 at 14:43.

Durham County Council logo
LONG TERM
Between
12 Feb and 2 Dec 2024
Details
View Map
Share
Follow
Southfield Way

Durham County Council are proposing to carry out Highway repair and maintenance works on Southfield Way, Aykley Heads.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2024 and could run through until 2 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Durham County Council on 18 Jan 2024 at 13:08.

Northern Gas Networks logo
LONG TERM
Until
2 May 2024
Details
View Map
Share
Follow
Ouston Bridleway 4

Northern Gas Networks are carrying out Utility repair and maintenance works on Ouston Bridleway 4, Ouston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 February 2024 at 15:00 and could run through until 2 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Feb 2024 at 15:02.

Northern Gas Networks logo
LONG TERM
Until
3 May 2024
Details
View Map
Share
Follow
Carnoustie

Northern Gas Networks are carrying out Utility repair and maintenance works on Carnoustie, Ouston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 February 2024 at 08:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Apr 2024 at 09:45.

Northumbrian Water logo
LONG TERM
Until
28 Apr 2024
Details
View Map
Share
Follow
Blackfell Road

Northumbrian Water are carrying out Utility repair and maintenance works on Blackfell Road, Blackfell, Washington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 March 2024 at 09:20 and could run through until 28 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 17 Apr 2024 at 06:00.

Northumbrian Water logo
LONG TERM
Between
11 Mar and 13 Jun 2024
Details
View Map
Share
Follow
Hustledown Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Hustledown Road, Stanley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2024 and could run through until 13 June 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 31 Oct 2023 at 09:22.

Northumbrian Water logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Swinburne Place Back

Northumbrian Water are carrying out Utility repair and maintenance works on Swinburne Place Back, Birtley Central, Birtley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 March 2024 at 17:00 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 17 Apr 2024 at 08:07.

Northern Gas Networks logo
LONG TERM
Until
1 Jul 2024
Details
View Map
Share
Follow
Mount Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Mount Road, Northside, Birtley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 09:20 and could run through until 1 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Mar 2024 at 09:23.

Northern Gas Networks logo
Until
28 Apr 2024
Details
View Map
Share
Follow
Hill Top

Northern Gas Networks are carrying out Utility repair and maintenance works on Hill Top, Stanley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 10:00 and could run through until 28 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Apr 2024 at 15:47.

Durham County Council logo
Between
1 and 30 Apr 2024
Details
View Map
Share
Follow
Front Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 30 Jan 2024 at 10:10.

Northern Gas Networks logo
LONG TERM
Between
1 Apr and 15 May 2024
Details
View Map
Share
Follow
Ouston Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ouston Lane, Ouston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 15 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Nov 2023 at 14:26.

Northern Powergrid (Northeast) logo
Until
3 May 2024
Details
View Map
Share
Follow
Portmeads Road

Northern Powergrid (Northeast) are carrying out New service connection on Portmeads Road, Portmeads, Birtley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 8 April 2024 at 08:15 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Apr 2024 at 08:40.

Northern Gas Networks logo
Until
3 May 2024
Details
View Map
Share
Follow
Fellcross

Northern Gas Networks are carrying out Utility repair and maintenance works on Fellcross, Northside, Birtley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 08:00 and could run through until 3 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 15 Apr 2024 at 09:35.

Northern Powergrid (Northeast) logo
Until
28 Apr 2024
Details
View Map
Share
Follow
Greenford

Northern Powergrid (Northeast) are carrying out Utility asset works on Greenford, Kibblesworth, Birtley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 April 2024 at 10:30 and could run through until 28 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Apr 2024 at 10:42.

Northern Gas Networks logo
Until
17 May 2024
Details
View Map
Share
Follow
Aberdeen

Northern Gas Networks are carrying out Utility repair and maintenance works on Aberdeen, Ouston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 April 2024 at 08:50 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Apr 2024 at 09:45.

Northern Gas Networks logo
Until
9 May 2024
Details
View Map
Share
Follow
Highridge

Northern Gas Networks are carrying out Utility repair and maintenance works on Highridge, Northside, Birtley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 April 2024 at 07:30 and could run through until 9 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Apr 2024 at 07:31.

Northumbrian Water logo
Between
21 Apr and 12 May 2024
Details
View Map
Share
Follow
Dairy Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Dairy Lane, Dairy Lane Estate, Houghton-le-spring.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2024 and could run through until 12 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 4 Apr 2024 at 12:28.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Orchard Street (Back)

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Orchard Street (Back), Pelton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 26 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 5 Apr 2024 at 15:39.

Northern Gas Networks logo
LONG TERM
Between
22 Apr and 5 Jul 2024
Details
View Map
Share
Follow
Byron Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Byron Close, Ouston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 5 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2024 at 07:56.

Northern Gas Networks logo
LONG TERM
Between
22 Apr and 7 Jun 2024
Details
View Map
Share
Follow
Fairisle

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairisle, Ouston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 7 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 19 Apr 2024 at 09:42.

Durham County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Beamishburn Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Beamishburn Road, Beamish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 24 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 27 Mar 2024 at 14:06.

National Highways logo
Finishing
Thursday
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Apr 2024 at 11:34.

National Highways logo
Finishing
Thursday
Details
View Map
Share
Follow
Kingsway Roundabout

National Highways are proposing to carry out Works for road purposes on Kingsway Roundabout, Team Valley, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 25 April 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Apr 2024 at 09:48.

Durham County Council logo
Between
23 Apr and 6 May 2024
Details
View Map
Share
Follow
York Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on York Crescent, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 April 2024 and could run through until 6 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Mar 2024 at 11:08.

Nexfibre Networks Limited logo
Between
24 and 28 Apr 2024
Details
View Map
Share
Follow
Springfell Nos 1 - 20 Footpaths

Nexfibre Networks Limited are proposing to carry out Utility asset works on Springfell Nos 1 - 20 Footpaths, Portmeads, Birtley.

These works are categorised as Major.

The works will start on or after 24 April 2024 and could run through until 28 April 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Apr 2024 at 07:27.

Durham County Council logo
Between
25 Apr and 8 May 2024
Details
View Map
Share
Follow
Dilston Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Dilston Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Mar 2024 at 11:14.

Durham County Council logo
Between
25 Apr and 8 May 2024
Details
View Map
Share
Follow
Barrasford Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Barrasford Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Mar 2024 at 11:12.

Durham County Council logo
Between
25 Apr and 8 May 2024
Details
View Map
Share
Follow
Chillingham Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Chillingham Road, Newton Hall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 April 2024 and could run through until 8 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Mar 2024 at 11:15.

Nexfibre Networks Limited logo
Between
28 Apr and 2 May 2024
Details
View Map
Share
Follow
Fellside Nos 11 To 40 And Springfell Nos 17 To 40 Footpaths

Nexfibre Networks Limited are proposing to carry out Utility asset works on Fellside Nos 11 To 40 And Springfell Nos 17 To 40 Footpaths, Portmeads, Birtley.

These works are categorised as Major.

The works will start on or after 28 April 2024 and could run through until 2 May 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Apr 2024 at 07:27.

Nexfibre Networks Limited logo
Between
29 Apr and 19 May 2024
Details
View Map
Share
Follow
A691 From Langley Park Industrial Estate To Kaysburn Roundabout

Nexfibre Networks Limited are proposing to carry out Utility asset works on A691 From Langley Park Industrial Estate To Kaysburn Roundabout, Langley Park.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 19 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 18 Apr 2024 at 13:36.

Northern Gas Networks logo
Between
29 Apr and 28 May 2024
Details
View Map
Share
Follow
Byron Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Byron Close, Ouston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 28 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Dec 2023 at 16:08.

Northern Gas Networks logo
Between
29 Apr and 17 May 2024
Details
View Map
Share
Follow
Oxclose Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxclose Road, Columbia, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Mar 2024 at 10:40.

Northern Gas Networks logo
Between
29 Apr and 17 May 2024
Details
View Map
Share
Follow
Fatfield Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fatfield Road, Columbia, Washington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 5 Mar 2024 at 10:38.

Northern Gas Networks logo
LONG TERM
Between
29 Apr and 5 Jun 2024
Details
View Map
Share
Follow
Mount Road Remote Footways

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mount Road Remote Footways, Northside, Birtley.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 29 April 2024 and could run through until 5 June 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2024 at 13:12.

National Highways logo
Between
29 Apr and 2 May 2024
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Apr 2024 at 12:34.

Northumbrian Water logo
Between
29 Apr and 24 May 2024
Details
View Map
Share
Follow
Mount Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Mount Lane, Springwell, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Apr 2024 at 10:12.

National Highways logo
Between
29 Apr and 2 May 2024
Details
View Map
Share
Follow
Kingsway Roundabout

National Highways are proposing to carry out Works for road purposes on Kingsway Roundabout, Team Valley, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 2 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Apr 2024 at 10:54.

Network Rail logo
LONG TERM
Between
1 May 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Wesley Terrace

Network Rail are proposing to carry out Works for Rail Purposes on Wesley Terrace, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 Feb 2024 at 13:33.

Nexfibre Networks Limited logo
Between
1 and 7 May 2024
Details
View Map
Share
Follow
Portmeads Rise Nos 28 - 77 Footpaths

Nexfibre Networks Limited are proposing to carry out Utility asset works on Portmeads Rise Nos 28 - 77 Footpaths, Portmeads, Birtley.

These works are categorised as Major.

The works will start on or after 1 May 2024 and could run through until 7 May 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 9 Apr 2024 at 07:35.

Northern Gas Networks logo
LONG TERM
Between
6 May and 21 Jun 2024
Details
View Map
Share
Follow
Newbottle Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newbottle Street, Houghton Town Centre, Houghton-le-spring.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Mar 2024 at 08:24.

National Highways logo
Between
7 and 11 May 2024
Details
View Map
Share
Follow
Eighton Lodge Roundabout

National Highways are proposing to carry out Works for road purposes on Eighton Lodge Roundabout, Eighton Banks, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 15 Apr 2024 at 13:23.

Northumbrian Water logo
Between
12 May and 2 Jun 2024
Details
View Map
Share
Follow
Front Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Front Street, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2024 and could run through until 2 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 18 Apr 2024 at 11:12.

Northern Gas Networks logo
LONG TERM
Between
13 May and 28 Jun 2024
Details
View Map
Share
Follow
North Lodge Footpath 27

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on North Lodge Footpath 27, North Lodge.

These works are categorised as Major.

The works will start on or after 13 May 2024 and could run through until 28 June 2024. The works will impact the carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Apr 2024 at 08:21.

Northern Gas Networks logo
LONG TERM
Between
13 May and 28 Jun 2024
Details
View Map
Share
Follow
Ouston Footpath 5

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ouston Footpath 5, Ouston.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 13 May 2024 and could run through until 28 June 2024. The works will impact the verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 18 Apr 2024 at 08:24.

Northern Gas Networks logo
Between
13 and 31 May 2024
Details
View Map
Share
Follow
Ouston Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ouston Lane, Ouston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 1 Dec 2023 at 16:18.

Northern Gas Networks logo
Between
13 and 31 May 2024
Details
View Map
Share
Follow
Byron Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Byron Street, Ouston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Nov 2023 at 15:31.

Northern Gas Networks logo
LONG TERM
Between
13 May and 14 Jun 2024
Details
View Map
Share
Follow
Cromarty

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cromarty, Ouston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 14 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2023 at 15:12.

Northumbrian Water logo
Between
20 and 24 May 2024
Details
View Map
Share
Follow
King Street And Mitchell Street Back

Northumbrian Water are proposing to carry out Utility repair and maintenance works on King Street And Mitchell Street Back, Birtley Central, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 31 Jan 2024 at 09:29.

Northumbrian Water logo
Between
28 and 31 May 2024
Details
View Map
Share
Follow
School Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on School Terrace, Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 8 Feb 2024 at 11:24.

Northumbrian Water logo
Between
28 May and 17 Jun 2024
Details
View Map
Share
Follow
The Close

Northumbrian Water are proposing to carry out Utility repair and maintenance works on The Close, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 17 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 28 Mar 2024 at 09:43.

Northumbrian Water logo
Between
28 May and 17 Jun 2024
Details
View Map
Share
Follow
Pelton Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Pelton Lane, South Pelaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 17 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 26 Mar 2024 at 12:41.

Nexfibre Networks Limited logo
Between
29 and 31 May 2024
Details
View Map
Share
Follow
Edward Street

Nexfibre Networks Limited are proposing to carry out Utility asset works on Edward Street, Sacriston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 27 Mar 2024 at 16:17.

Durham County Council logo
Between
3 and 28 Jun 2024
Details
View Map
Share
Follow
Waldridge Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Waldridge Road, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 20 Mar 2024 at 09:23.

Durham County Council logo
Between
10 and 12 Jun 2024
Details
View Map
Share
Follow
Pelton Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Pelton Lane, Newfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 12 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Apr 2024 at 13:04.

Durham County Council logo
Between
11 and 13 Jun 2024
Details
View Map
Share
Follow
Black Boy Road

Durham County Council are proposing to carry out Highway repair and maintenance works on Black Boy Road, Great Lumley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 17 Apr 2024 at 13:07.

Durham County Council logo
Between
11 and 13 Jun 2024
Details
View Map
Share
Follow
Front Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street, Grange Villa.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 18 Apr 2024 at 11:19.

Durham County Council logo
Between
12 and 14 Jun 2024
Details
View Map
Share
Follow
Green Lane

Durham County Council are proposing to carry out Highway repair and maintenance works on Green Lane, Holmside.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 June 2024 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 18 Apr 2024 at 10:24.

Durham County Council logo
Between
17 and 28 Jun 2024
Details
View Map
Share
Follow
Burns Close

Durham County Council are proposing to carry out Highway repair and maintenance works on Burns Close, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Mar 2024 at 14:56.

Durham County Council logo
Between
17 and 28 Jun 2024
Details
View Map
Share
Follow
Arnold Close

Durham County Council are proposing to carry out Highway repair and maintenance works on Arnold Close, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 7 Mar 2024 at 10:43.

Durham County Council logo
Between
17 and 28 Jun 2024
Details
View Map
Share
Follow
Chaucer Close

Durham County Council are proposing to carry out Highway repair and maintenance works on Chaucer Close, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Mar 2024 at 13:22.

Northern Gas Networks logo
LONG TERM
Between
17 Jun and 19 Jul 2024
Details
View Map
Share
Follow
Robert Terrace

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Robert Terrace, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Mar 2024 at 12:08.

Northumbrian Water logo
Between
17 Jun and 12 Jul 2024
Details
View Map
Share
Follow
Peareth Hall Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Peareth Hall Road, Springwell, Gateshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 12 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 28 Mar 2024 at 10:20.

Durham County Council logo
Between
18 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Brooke Close

Durham County Council are proposing to carry out Highway repair and maintenance works on Brooke Close, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 6 Mar 2024 at 14:52.

Durham County Council logo
Between
18 Jun and 1 Jul 2024
Details
View Map
Share
Follow
Kipling Close

Durham County Council are proposing to carry out Highway repair and maintenance works on Kipling Close, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Mar 2024 at 10:49.

Gateshead Metropolitan Borough Council logo
Between
18 and 21 Jun 2024
Details
View Map
Share
Follow
Cranberry Bog Road

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Cranberry Bog Road, Kibblesworth, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 22 Mar 2024 at 10:30.

Durham County Council logo
Between
19 Jun and 3 Jul 2024
Details
View Map
Share
Follow
Blake Close

Durham County Council are proposing to carry out Highway repair and maintenance works on Blake Close, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 3 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 5 Mar 2024 at 13:26.

Gateshead Metropolitan Borough Council logo
Between
19 and 24 Jun 2024
Details
View Map
Share
Follow
Birkland Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Birkland Lane, Kibblesworth, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2024 and could run through until 24 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 Mar 2024 at 08:19.

Gateshead Metropolitan Borough Council logo
Between
21 and 27 Jun 2024
Details
View Map
Share
Follow
Greenford Lane From Haggs Lane To Moormill Lane

Gateshead Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Greenford Lane From Haggs Lane To Moormill Lane, Lamesley, Birtley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 June 2024 and could run through until 27 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Gateshead Metropolitan Borough Council on 21 Mar 2024 at 14:39.

Northern Gas Networks logo
Between
26 Jun and 17 Jul 2024
Details
View Map
Share
Follow
Pelaw Bank

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pelaw Bank, Chester-le-street.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Apr 2024 at 15:37.

Northern Gas Networks logo
Between
26 Jun and 17 Jul 2024
Details
View Map
Share
Follow
Pelton Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pelton Lane, South Pelaw.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Apr 2024 at 15:37.

Northern Gas Networks logo
Between
26 Jun and 16 Jul 2024
Details
View Map
Share
Follow
Durham Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Durham Road, Birtley Central, Birtley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2024 and could run through until 16 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 6 Feb 2024 at 13:27.

Durham County Council logo
Between
27 Jun and 10 Jul 2024
Details
View Map
Share
Follow
The Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on The Crescent, West Rainton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2024 and could run through until 10 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 07:07.

Durham County Council logo
LONG TERM
Between
1 Jul and 30 Aug 2024
Details
View Map
Share
Follow
South Crescent

Durham County Council are proposing to carry out Highway repair and maintenance works on South Crescent, Durham City.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 4 Apr 2024 at 14:13.

Durham County Council logo
LONG TERM
Between
1 Jul and 30 Aug 2024
Details
View Map
Share
Follow
A167 (From C184/hermitage Roundabout To B6312 Plawsworth Road Junct)

Durham County Council are proposing to carry out Highway repair and maintenance works on A167 (From C184/hermitage Roundabout To B6312 Plawsworth Road Junct), Chester Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 21 Mar 2024 at 10:50.

Durham County Council logo
LONG TERM
Between
1 Jul and 30 Aug 2024
Details
View Map
Share
Follow
Front Street

Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 30 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 14 Mar 2024 at 10:58.

Northern Gas Networks logo
Between
1 and 19 Jul 2024
Details
View Map
Share
Follow
Station Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Station Road, Stanley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 19 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Apr 2024 at 13:55.

Northern Gas Networks logo
Between
1 and 19 Jul 2024
Details
View Map
Share
Follow
Causey Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Causey Road, Shield Row.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 19 July 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 19 Apr 2024 at 11:40.

Durham County Council logo
Between
7 and 17 Jul 2024
Details
View Map
Share
Follow
Oak Street (Side)

Durham County Council are proposing to carry out Highway repair and maintenance works on Oak Street (Side), Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 17 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 10:18.

Durham County Council logo
Between
7 and 18 Jul 2024
Details
View Map
Share
Follow
School Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on School Terrace, Fence Houses.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 09:44.

Northern Powergrid (Northeast) logo
Between
7 and 25 Jul 2024
Details
View Map
Share
Follow
Lumley Crescent South Rear

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Lumley Crescent South Rear, Newbottle, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 25 July 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Apr 2024 at 05:33.

Durham County Council logo
Between
8 and 21 Jul 2024
Details
View Map
Share
Follow
Holmlands Park

Durham County Council are proposing to carry out Highway repair and maintenance works on Holmlands Park, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 11:59.

Durham County Council logo
Between
8 and 21 Jul 2024
Details
View Map
Share
Follow
Lindom Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Lindom Avenue, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 12:01.

Durham County Council logo
Between
8 and 21 Jul 2024
Details
View Map
Share
Follow
Eardulph Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Eardulph Avenue, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 11:50.

Durham County Council logo
Between
8 and 21 Jul 2024
Details
View Map
Share
Follow
Lindisfarne Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Lindisfarne Avenue, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 10:28.

Durham County Council logo
Between
8 and 21 Jul 2024
Details
View Map
Share
Follow
Roman Avenue

Durham County Council are proposing to carry out Highway repair and maintenance works on Roman Avenue, Chester-le-street.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 12:01.

Durham County Council logo
Between
8 and 21 Jul 2024
Details
View Map
Share
Follow
St Barnabas

Durham County Council are proposing to carry out Highway repair and maintenance works on St Barnabas, Bournmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 July 2024 and could run through until 21 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 10:16.

Durham County Council logo
Between
11 and 24 Jul 2024
Details
View Map
Share
Follow
Coquet Drive

Durham County Council are proposing to carry out Highway repair and maintenance works on Coquet Drive, Perkinsville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 14:08.

Durham County Council logo
Between
11 and 24 Jul 2024
Details
View Map
Share
Follow
Wansbeck Close

Durham County Council are proposing to carry out Highway repair and maintenance works on Wansbeck Close, Perkinsville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 13:38.

Durham County Council logo
Between
14 and 25 Jul 2024
Details
View Map
Share
Follow
Iveson Terrace

Durham County Council are proposing to carry out Highway repair and maintenance works on Iveson Terrace, Sacriston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 13:40.

Durham County Council logo
Between
14 and 25 Jul 2024
Details
View Map
Share
Follow
Front Street (Back)

Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street (Back), Sacriston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 13:37.

Durham County Council logo
Between
14 and 25 Jul 2024
Details
View Map
Share
Follow
Front Street (Back)

Durham County Council are proposing to carry out Highway repair and maintenance works on Front Street (Back), Sacriston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 12 Apr 2024 at 14:02.

Northern Powergrid (Northeast) logo
LONG TERM
Between
14 Jul and 22 Aug 2024
Details
View Map
Share
Follow
Philadelphia Lane

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Philadelphia Lane, Newbottle, Houghton-le-spring.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 22 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Apr 2024 at 05:33.

Northern Powergrid (Northeast) logo
LONG TERM
Between
14 Jul and 22 Aug 2024
Details
View Map
Share
Follow
Philadelphia Lane

Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Philadelphia Lane, Newbottle, Houghton-le-spring.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 22 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Apr 2024 at 05:35.

Durham County Council logo
Between
14 and 25 Jul 2024
Details
View Map
Share
Follow
Lyne Close

Durham County Council are proposing to carry out Highway repair and maintenance works on Lyne Close, Perkinsville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2024 and could run through until 25 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Durham County Council on 16 Apr 2024 at 13:33.

Northern Gas Networks logo
Between
15 Jul and 2 Aug 2024
Details
View Map
Share
Follow
Badgers Wood

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Badgers Wood, Kip Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2024 at 08:38.

Northern Gas Networks logo
Between
15 Jul and 2 Aug 2024
Details
View Map
Share
Follow
Beamishburn Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Beamishburn Road, Beamish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 2 August 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 20 Mar 2024 at 08:41.


Roadworks Map near to DH3 3DQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 20 Apr 2024 07:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to DH3 3DQ (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Durham County Council logo
STATION ROAD 
(0.1 miles)
Durham County Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 18 Apr 2024 - 22 Apr 2024
0.1
Details
Share
Follow
2
Northumbrian Water logo
HIGH CHARE 
(0.1 miles)
Northumbrian Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 21 Apr 2024
0.1
Details
Share
Follow
3
Durham County Council logo
CHURCH CHARE 
(0.1 miles)
Durham County Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 18 Apr 2024 - 22 Apr 2024
0.1
Details
Share
Follow
4
Durham County Council logo
CHURCH CHARE 
(0.1 miles)
Durham County Council
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 18 Apr 2024 - 22 Apr 2024
0.1
Details
Share
Follow
5
Durham County Council logo
FRONT STREET 
(0.2 miles)
Durham County Council
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 18 Apr 2024 - 22 Apr 2024
0.2
Details
Share
Follow
6
Northern Powergrid (Northeast) logo
URGENT
  
CASTLE RIGGS 
(0.3 miles)
Northern Powergrid (Northeast)
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 18 Apr 2024 23:30
(Scheduled: 18 Apr 2024 - 25 Apr 2024)
0.3
Details
Share
Follow
7
Durham County Council logo
MAJOR
  
FRONT STREET 
(0.3 miles)
Durham County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 1 Apr 2024 - 30 Apr 2024
0.3
Details
Share
Follow
8
Northumbrian Water logo
HAMBLEDON AVENUE 
(0.5 miles)
Northumbrian Water
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 16 Apr 2024 14:42
(Scheduled: 15 Apr 2024 - 21 Apr 2024)
0.5
Details
Share
Follow
9
Northern Gas Networks logo
EMERGENCY
  
PELTON LANE 
(0.6 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 15 Apr 2024 13:22
(Scheduled: 15 Apr 2024 - 23 Apr 2024)
0.6
Details
Share
Follow