ROADWORKS SUMMARY
Earthcott Green, Alveston, BRISTOL, BS35 3TD
Introduction
View current and future planned roadworks and road closures for BS35 3TD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Earthcott Green, Alveston, BRISTOL, BS35 3TD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Coalsack Lane, Winterbourne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:05.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Cooks Lane, Coalpit Heath.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:06.
12 Feb 2026
South Gloucestershire Council are carrying out Highway improvement works on Ruffet Road, Winterbourne.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 July 2023 at 07:30 and could run through until 12 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 14 Feb 2024 at 16:06.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Worthing Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:06.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Rodway Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:05.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Durban Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:05.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Cranbourne Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:07.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Lee Close, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:08.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Thirlmere Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:07.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Stroud Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:08.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Windermere Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:08.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Lower Thirlmere Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:07.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Cavendish Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:06.
Sunday
South Gloucestershire Council are carrying out Highway improvement works on Pretoria Road, Patchway.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 January 2024 at 07:45 and could run through until 31 March 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 22 Jan 2024 at 09:09.
3 Jan and 2 Jun 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Coniston Road, Patchway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2024 and could run through until 2 June 2024. The works will impact the carriageway, verge and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by South Gloucestershire Council on 8 Sep 2023 at 11:26.
18 Apr 2024
National Highways are carrying out Highway improvement works on Manor Farm Lane, Aust.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 07:00 and could run through until 18 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 16 Jan 2024 at 08:06.
23 Jan 2024 and 23 Jan 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Sorrel Place, Stoke Gifford.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 23 January 2024 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Nexfibre Networks Limited on 31 Oct 2023 at 14:06.
13 Feb 2024 and 12 Feb 2026
National Highways are proposing to carry out Works for road purposes on Badminton Road, Winterbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2024 and could run through until 12 February 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 8 Feb 2024 at 07:22.
Tomorrow
South Gloucestershire Council are proposing to carry out Highway improvement works on Footpath Bakers Ground By 349 To Footbridge Bradley Stoke Way, Stoke Gifford.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 4 March 2024 and could run through until 29 March 2024. The works will impact the cycleway and footpath.
This roadwork event was last updated by South Gloucestershire Council on 21 Aug 2023 at 09:38.
Tomorrow
South Gloucestershire Council are proposing to carry out Highway improvement works on Great Stoke Way North, Stoke Gifford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2024 and could run through until 29 March 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 21 Aug 2023 at 09:37.
4 Apr 2024
South Gloucestershire Council are carrying out Utility asset works on Bolingbroke Way, Patchway.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 09:30 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 21 Mar 2024 at 10:19.
4 Apr 2024
South Gloucestershire Council are carrying out Utility asset works on Gloucester Road North, Filton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 09:30 and could run through until 4 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 21 Mar 2024 at 10:18.
4 Apr 2024
Electricity Network Company are carrying out Permanent reinstatement on Gloucester Road North, Filton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 March 2024 at 20:30 and could run through until 4 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 19 Mar 2024 at 20:36.
Wednesday
Wales And West Utilities are carrying out Utility repair and maintenance works on Footpaths Network Somerset Avenue By 37 To 137, Yate.
The works started on 27 March 2024 at 09:30 and could run through until 3 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 27 Mar 2024 at 11:01.
15 Apr and 4 May 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Lysander Road, Almondsbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 4 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by South Gloucestershire Council on 26 Jan 2024 at 08:40.
28 Apr and 25 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Great Stoke Way North, Stoke Gifford.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 25 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 21 Aug 2023 at 09:38.
28 Apr and 3 Oct 2024
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Coniston Road, Patchway.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 3 October 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 21 Feb 2024 at 09:34.
28 Apr and 25 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Footpath Bakers Ground By 349 To Footbridge Bradley Stoke Way, Stoke Gifford.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 28 April 2024 and could run through until 25 July 2024. The works will impact the cycleway and footpath.
This roadwork event was last updated by South Gloucestershire Council on 21 Aug 2023 at 09:39.
28 Apr and 3 Oct 2024
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Footpaths Bradley Road By 1 To Coniston Road By 153, Patchway.
These works are categorised as Major.
The works will start on or after 28 April 2024 and could run through until 3 October 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 1 Mar 2024 at 14:10.
29 Apr and 26 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Great Stoke Way North, Stoke Gifford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 26 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 25 Aug 2023 at 07:41.
29 Apr and 26 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Footpath Bakers Ground By 349 To Footbridge Bradley Stoke Way, Stoke Gifford.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 29 April 2024 and could run through until 26 July 2024. The works will impact the cycleway and footpath.
This roadwork event was last updated by South Gloucestershire Council on 21 Aug 2023 at 09:39.
6 and 8 May 2024
Virgin Media are proposing to carry out Utility asset works on Harcombe Hill, Winterbourne Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 8 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Mar 2024 at 12:58.
27 and 29 May 2024
BT are proposing to carry out Utility asset works on Village Road, Littleton Upon Severn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 14 Mar 2024 at 12:32.
28 May and 5 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Rudgeway.
These works are categorised as Major.
The works will start on or after 28 May 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 15 Feb 2024 at 15:02.
28 May and 5 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Rudgeway.
These works are categorised as Major.
The works will start on or after 28 May 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 15 Feb 2024 at 15:03.
28 May and 5 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Alveston.
These works are categorised as Major.
The works will start on or after 28 May 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 15 Feb 2024 at 15:03.
28 May and 5 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Long Down Avenue, Stoke Gifford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 15 Feb 2024 at 14:45.
2 Jun and 6 Nov 2024
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Footpaths Bradley Road By 1 To Coniston Road By 153, Patchway.
These works are categorised as Major.
The works will start on or after 2 June 2024 and could run through until 6 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 1 Mar 2024 at 10:58.
2 and 6 Jun 2024
Wessex Water are proposing to carry out Utility repair and maintenance works on Common Road, Winterbourne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 6 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Wessex Water on 23 Feb 2024 at 09:31.
2 Jun and 20 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Rudgeway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 20 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 15 Nov 2023 at 12:50.
2 Jun and 20 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Rudgeway.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 20 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 15 Nov 2023 at 12:52.
2 Jun and 20 Jul 2024
South Gloucestershire Council are proposing to carry out Highway improvement works on Gloucester Road, Alveston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 20 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by South Gloucestershire Council on 15 Nov 2023 at 12:51.
9 and 11 Jun 2024
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Frampton End Road, Frampton Cotterell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Bristol Waterworks Company on 14 Mar 2024 at 08:59.
9 and 13 Jun 2024
Bristol Waterworks Company are proposing to carry out Utility repair and maintenance works on Malmains Drive, Frenchay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 13 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Bristol Waterworks Company on 8 Mar 2024 at 11:33.
18 Jun and 1 Nov 2024
Wessex Water are proposing to carry out Utility asset works on Church Road, Frampton Cotterell.
These works are categorised as Major.
The works will start on or after 18 June 2024 and could run through until 1 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Wessex Water on 19 Mar 2024 at 13:57.
Roadworks Map near to Earthcott Green, Alveston, BRISTOL, BS35 3TD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
Roadworks Listing near to Earthcott Green, Alveston, BRISTOL, BS35 3TD (0 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.