The photograph on this page of Town Mill hydro-electric system, Lyme Regis by David Hawgood as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk
Image: © David Hawgood Taken: 19 Oct 2016
The photo shows the pipes taking water from the mill leat to a turbine and generator in the mill. Installed in 2007, the system is designed to produce 32,000 kilowatt hours per annum. The mill leat also runs the waterwheel for grinding wheat.