PROPERTY ENERGY EFFICIENCY CERTIFICATE DETAILS
Torre Road, BRADFORD, BD6 3PD

Introduction

Energy Performance Certificates (EPCs) are designed to tell you how efficient a building is and provides a rating between A (very efficient) and G which is inefficient. It helps to identify how costly it will be to light and heat a property and what the carbon dioxide emissions are likely to be.

An EPC needs to be provided as part of the process of selling or renting a house and should be availale as soon as the property is marketed. An EPC may only be produced by an approved domestic energy assessor and each certificate is valid for 10 years.

Additionally, an EPC will highlight potential efficiency improvements that could be made to the property, an estimated cost for implementation and the likely savings that can be made as a result. These costs and savings are for a typical household in that property and not specific to you or your family.

Certificates issued for Torre Road, BD6 3PD are shown below and the data are updated monthly for England and Wales and quarterly for properties in Scotland.

Data are provided by the Department for Levelling Up, Housing and Communities.

Energy Performance Certificates Generated for Torre Road, BRADFORD, BD6 3PD
Period Covered: 2008 - 31 October 2024

Address
Inspection Date
Current
Potential
Property Type
Built Form
Constructed
Address
1 Torre Road
Date
19 Dec 2014
Current
Potential
59
84
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
19 Dec 2014
59
84
10 Nov 2014
62
86
15 Oct 2014
53
82
29 Sep 2014
57
85
27 Apr 2011
63
71
Total Floor Area
97 sq m
Current CO2 Emissions Level
5.4
Potential CO2 Emissions Level
2.3
CO2 per sq m per Year
56
Mains Gas Available
Yes
Habitable Rooms
8
Number of Extensions
1
Address
3 Torre Road
Date
6 Oct 2021
Current
Potential
66
83
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
6 Oct 2021
66
83
11 Jun 2009
59
60
Total Floor Area
60 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
1.5
CO2 per sq m per Year
46
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
1
Address
4a Torre Road
Date
3 Oct 2022
Current
Potential
57
81
Property Type
Flat
Built Form
Mid-Terrace
Constructed
1900-1929
+
Certificate History
3 Oct 2022
57
81
Total Floor Area
50 sq m
Current CO2 Emissions Level
2.8
Potential CO2 Emissions Level
2.4
CO2 per sq m per Year
57
Mains Gas Available
No
Habitable Rooms
2
Number of Extensions
0
Address
5 Torre Road
Date
14 Jan 2012
Current
Potential
23
26
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
14 Jan 2012
23
26
Total Floor Area
59 sq m
Current CO2 Emissions Level
5.8
Potential CO2 Emissions Level
5.4
CO2 per sq m per Year
99
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Address
6a Torre Road
Date
8 Dec 2020
Current
Potential
65
71
Property Type
Flat
Built Form
End-Terrace
Constructed
1930-1949
+
Certificate History
8 Dec 2020
65
71
21 May 2014
39
74
Total Floor Area
76 sq m
Current CO2 Emissions Level
3.6
Potential CO2 Emissions Level
2.9
CO2 per sq m per Year
48
Mains Gas Available
Yes
Habitable Rooms
3
Number of Extensions
0
Address
7 Torre Road
Date
7 Sep 2014
Current
Potential
39
89
Property Type
House
Built Form
Semi-Detached
Constructed
1950-1966
+
Certificate History
7 Sep 2014
39
89
Total Floor Area
60 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
0.7
CO2 per sq m per Year
65
Mains Gas Available
Yes
Habitable Rooms
5
Number of Extensions
0
Address
8 Torre Road
Date
28 Aug 2022
Current
Potential
54
89
Property Type
House
Built Form
Semi-Detached
Constructed
1930-1949
+
Certificate History
28 Aug 2022
54
89
26 Aug 2022
67
87
14 Jun 2009
66
76
Total Floor Area
51 sq m
Current CO2 Emissions Level
3.9
Potential CO2 Emissions Level
0.9
CO2 per sq m per Year
77
Mains Gas Available
Yes
Habitable Rooms
4
Number of Extensions
0
Bands

A
92 - 100
B
81 - 91
C
69 - 80
D
55 -68
E
39 -54
F
54 -38
G
0 - 20

Energy Performance Certificate Notes

There are a number of reasons that certificates are excluded from the dataset;

  • The holder of the energy certificate has 'opted-out' of disclosure
  • The certificate is excluded on the grounds of national security
  • Certificates that are marked as 'cancelled' or 'not for issue'

Certificates are grouped together by the property reference identifier rather than the postal address with a view to showing the history of changes made to properties over time. Sometimes, one property may exist as multiple entries in the table instead and this is as a result of inconsistent building references being used on each prepared certificate.

Contains public sector information licensed under the Open Government Licence v3.0.
Contains Royal Mail data © Royal Mail copyright and Database right 2024.